The OPzV2-1200 2V1200Ah is a sealed tubular-plate gel stationary cell rated 1200 Ah at C10 to 1.80 V/cell at 20 °C, published with a designed floating life of 20+ years at 20 °C, an internal resistance of approx. 0.46 mΩ fully charged at 25 °C and a maximum charge current of 240 A — the cell that a 48 V data center or telecom UPS string is usually built from when the rack depth is fixed and the battery room has to be filled from 48 V cabinets rather than from 12 V racks.

OPzV2-1200 refers to a gel-electrolyte stationary cell in the OPzV series: the trailing 2 denotes the 2 V nominal cell voltage, 1200 is the nominal capacity in ampere-hours, and the OPzV prefix identifies the tubular-plate construction with a gel electrolyte rather than a flooded one. Every rating a technical evaluator needs is published against a stated condition — capacity against C10 to 1.80 V/cell at 20 °C, internal resistance fully charged at 25 °C, float life referenced to 20 °C — which is what allows a string to be engineered before any commercial discussion begins.

Demand-side commentary from the IEA, BloombergNEF and Benchmark Minerals is useful for framing the direction of data centre and network standby power spending, and it also deserves a caution: none of those institutions publishes a cell-level specification, so none of them can confirm a capacity, a float life or a terminal torque. Procurement is settled at the datasheet level, and this datasheet is unusually complete. On the published data the OPzV2-1200 resolves the three questions that dominate a large backup installation: whether the cell can carry a 24-cell string without voltage derate, whether the recharge programme can restore a full string inside the maintenance window, and whether the cell can be installed in the existing cabinet geometry without redesigning the rack.

Key Takeaways

  • The rating is condition-bound. 1200 Ah is quoted at C10 to 1.80 V/cell at 20 °C, which is a 120 A discharge for ten hours. A capacity figure quoted without its rate, its end voltage and its temperature cannot be compared against anything else in the market, because every supplier chooses a different set of conditions.
  • Float life is a 20 °C number. The datasheet states 20+ years of floating life at 20 °C, and the same 20 °C reference is used for the self-discharge rate of approx. 2 % per month. A supplier quoting a lifetime for a warmer ambient is making a different claim, and that difference belongs in the commercial comparison rather than in a footnote.
  • A 24-cell string is fully calculable. 24 × 2 V × 1200 Ah = 57.6 kWh nominal, with 11.04 mΩ of string internal resistance, a 5,760 A string charge ceiling, and 2,016 kg of cells on the floor. Every one of those figures follows directly from the cell data and can be checked before an order is placed.
  • Three sizes, three footprints. The OPzV2-1000 and OPzV2-1200 print the same 681 mm total height but differ in length at 233 mm against 275 mm, and the OPzV2-1500 rises to 831 mm. A mixed installation must be planned for three envelopes, not one.
  • Verification is inexpensive when the data is published. Setpoints, the temperature compensation coefficient, drawing dimensions, terminal torque, internal resistance, the short circuit current and the full standards list are all stated, so a technical approval can be completed against the datasheet and the supply question settled afterwards.

§1 — OPzV2-1200 2V1200Ah Quick Specifications Table

ParameterPublished valueSource
ModelOPzV2-1200, tubular-plate gel stationary cell, 2 V 1200 AhModel page
Nominal voltage2 VDatasheet
Nominal capacity1200 Ah at C10 to 1.80 V/cell at 20 °CDatasheet
C10 discharge current120 A (1200 Ah ÷ 10 h)Arithmetic
Designed floating life20+ years @ 20 °CDatasheet
Printed dimensions (L × W × H)275 × 210 × 681 mmDatasheet
Drawing container height646 mmDatasheet
Drawing total height681 mmDatasheet
Terminal centre spacing108 mm across width, 140 mm along lengthDatasheet
Terminal20 mm OD, M8 thread, 7 mm depth, female copper insert M8Datasheet
Terminal tightening torque10–12 N·mDatasheet
Approximate weight84 kg (185 lbs)Datasheet
Internal resistanceApprox. 0.46 mΩ, fully charged at 25 °CDatasheet
Maximum charge current240 ADatasheet
Charge characteristicConstant charge at 0.15 CA to 2.40 V at 20 °CDatasheet
Maximum discharge current (5S)2500 ADatasheet
Short circuit current6400 ADatasheet
Self dischargeApprox. 2 % per month at 20 °CDatasheet
Float charge voltage2.23 V @ 25 °CDatasheet
Equalise charge voltage2.35 V @ 25 °CDatasheet
Temperature compensation−3 mV/°C/cellDatasheet
Ambient, discharge−40 °C to +65 °CDatasheet
Ambient, charge−30 °C to +65 °CDatasheet
Ambient, storage−25 °C to +45 °CDatasheet
Container materialABS, UL94-V0 optionalDatasheet
Applicable standardsIEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, Eurobat long-life guide, BS 6290 part 4, UL 1989Datasheet

The final voltage recommended for a given discharge rate is published as well: at currents below 0.05 C the cell supports at least 1.90 V per cell, between 0.05 C and 0.08 C at least 1.85 V, between 0.08 C and 0.2 C at least 1.80 V, between 0.2 C and 0.6 C at least 1.75 V, between 0.6 C and 1.0 C at least 1.70 V, and from 1 C to 2 C at least 1.60 V. Those figures, not a nominal 2 V, are what a battery management system should be configured against.

§2 — The Pain

A large backup installation fails on paperwork long before it fails on chemistry. The three recurring problems are specification ambiguity, string-level arithmetic that nobody owns, and cabinet geometry that was settled before the cell was chosen.

Specification ambiguity is the first. A 1200 Ah cell arriving from a supplier with no stated rate, no stated end voltage and no stated temperature is not a 1200 Ah cell, it is a marketing label. The same applies to float life quoted at a different ambient than the one the site will see, and to internal resistance quoted without a temperature. Without the conditions, a comparison against a competing quotation is a comparison of adjectives. The buyer who asks for the conditions discovers immediately whether the competing offer was engineered or estimated.

String-level arithmetic is the second. A 24-cell string is not 24 times a cell in every respect that matters. The nominal energy is easy, but the string internal resistance of 11.04 mΩ, the 5,760 A charge ceiling and the 2,016 kg of cells are the numbers that determine cable cross-section, busbar rating, floor loading, cabinet count and the lifting plan on the day the container is unloaded. When those are calculated after the order is placed, they are usually calculated by a subcontractor who does not carry the responsibility for the result.

Cabinet geometry is the third. The OPzV2-1200 prints 275 × 210 × 681 mm with a 646 mm container height, and the terminal centres sit 108 mm apart across the width and 140 mm along the length. Those are not interchangeable with a cell of the same nominal voltage and capacity from another supplier. Installing a 1200 Ah cell into a cabinet drawn for a different footprint means either a mechanical rework on site or a string that cannot be assembled at all, and both are discovered with the container already on the dock.

§3 — The Choice

The OPzV2-1200 sits between two other published sizes, and the comparison is a matter of footprint against charge acceptance rather than of any single headline number.

OPzV2-1000OPzV2-1200OPzV2-1500
Capacity @ C10 to 1.80 V @ 20 °C1000 Ah1200 Ah1500 Ah
Printed dimensionsL233 × W210 × H681 mmL275 × W210 × H681 mmL275 × W210 × H831 mm
Approximate weight73.2 kg (161.4 lbs)84 kg (185 lbs)102 kg (225 lbs)
Max charge current200 A240 A300 A
Internal resistanceapprox. 0.5 mΩ @ 25 °Capprox. 0.46 mΩ @ 25 °Capprox. 0.45 mΩ @ 25 °C
Short circuit current5400 A6400 A6200 A
Float / equalise2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C
Designed floating life20+ yr @ 20 °C20+ yr @ 20 °C20+ yr @ 20 °C
Ambient range−40~65 / −30~65 / −25~45 °C−40~65 / −30~65 / −25~45 °C−40~65 / −30~65 / −25~45 °C
String arithmetic, 24 cells in seriesOPzV2-1000OPzV2-1200OPzV2-1500
————
Nominal energy (24 × 2 V × Ah)48.0 kWh57.6 kWh72.0 kWh
String mass (24 × cell weight)1,756.8 kg2,016 kg2,448 kg
String internal resistance (24 × IR)12.0 mΩ11.04 mΩ10.8 mΩ
String max charge current (24 × I)4,800 A5,760 A7,200 A
Mass energy density (Wh ÷ kg)2,000 ÷ 73.2 = 27.3 Wh/kg2,400 ÷ 84 = 28.6 Wh/kg3,000 ÷ 102 = 29.4 Wh/kg

The OPzV2-1200 string figures are derived from the cell data, and the working is shown so that each figure can be checked:

Derivation for the OPzV2-1200, 24 cells in seriesWorkingSource
Nominal energy24 × 2 V × 1200 Ah = 57.6 kWhArithmetic
String mass with cells24 × 84 kg = 2,016 kgArithmetic
String internal resistance24 × 0.46 mΩ = 11.04 mΩArithmetic
String max charge current24 × 240 A = 5,760 AArithmetic
Mass energy density2,400 Wh ÷ 84 kg = 28.6 Wh/kgArithmetic
C10 discharge current1,200 Ah ÷ 10 h = 120 AArithmetic

The OPzV2-1200 is more reliable than the OPzV2-1000 in a string sized around a 48 V bus because it returns 1200 Ah against 1000 Ah at the same C10 test while lowering the internal resistance from approx. 0.5 mΩ to approx. 0.46 mΩ, which reduces voltage drop across the string and the heat generated during recharge at the same load. The OPzV2-1200 is a better fit than the OPzV2-1500 where cabinet height is fixed, because the two print the same 210 mm width and the 1500 Ah cell adds 150 mm of height that a 600 mm rack bay cannot absorb, while the 1200 Ah cell still carries a 240 A maximum charge current against 300 A. The OPzV2-1200 is better suited to standby float duty in an installed data centre than a comparable LFP product, because its 2.23 V float and 2.35 V equalise programme matches the installed charger hardware, the bus voltage window and the existing cabinet geometry without altering the charge regime or the cell footprint. The OPzV2-1200 is more reliable in service than an unspecified 2 V 1200 Ah cell, because every rating it publishes is tied to a stated condition — C10 to 1.80 V/cell at 20 °C, internal resistance measured fully charged at 25 °C, float life referenced to 20 °C — which removes the guesswork that causes premature string replacement.

§4 — The Framework

Seven numbers decide whether the OPzV2-1200 belongs in a given installation. Everything else is negotiation.

  1. Capacity at a stated rate and temperature. 1200 Ah at C10 to 1.80 V/cell at 20 °C, which is a 120 A discharge for ten hours, and the published discharge curve against final voltage from 1.90 V down to 1.60 V for a duty cycle away from the ten-hour rate.
  1. Internal resistance. Approx. 0.46 mΩ per cell fully charged at 25 °C, which becomes 11.04 mΩ across a 24-cell string, and that figure is the input to cable, busbar and interconnection sizing rather than a laboratory detail.
  1. Float and equalise setpoints with compensation. 2.23 V float and 2.35 V equalise at 25 °C, with −3 mV/°C/cell temperature compensation so the charger programme is written once and then left alone through seasonal swings in the battery room.
  1. Charge acceptance. A maximum charge current of 240 A per cell, a constant-charge characteristic of 0.15 CA to 2.40 V at 20 °C, and a 5,760 A ceiling across a 24-cell string — the values to compare against the rectifier output of the site.
  1. Discharge and fault duty. A maximum discharge current of 2500 A at the 5S rate and a 6400 A short circuit current, which set the DC bus breaker rating, the fuse coordination and the ventilation assumptions for the battery room.
  1. Mechanical and logistics envelope. 275 × 210 × 681 mm printed dimensions with a 646 mm container height and 108 × 140 mm terminal spacing, 84 kg per cell, and the site totals of 2,016 kg of cells for a 24-cell string — plus the lifting, palletising and aisle-width consequences of that mass.
  1. Environmental window and self-discharge. Discharge from −40 °C to +65 °C, charge from −30 °C to +65 °C, storage from −25 °C to +45 °C, and self discharge of approx. 2 % per month at 20 °C, which together determine standby behaviour, seasonal outage handling and the storage period for a site that is not permanently attended.

§5 — The Trust

A datasheet-rich market rewards buyers who verify, and the verification traps are well known to anyone who has bought stationary cells across several suppliers.

  • Capacity without a condition. Ask for the rate, the end voltage and the temperature. If the reply is only “1200 Ah”, the cell has not been specified.
  • Lifetime without an ambient. Require the stated temperature. 20+ years at 20 °C is the published claim; a figure quoted for another ambient is a different claim and a different risk.
  • Dimensions without the drawing. Printed dimensions, a 646 mm container height and a 681 mm total height are three different measurements, and the 210 × 275 mm top view with 108 × 140 mm terminal spacing is what actually fixes the rack.
  • Internal resistance quoted without conditions. Ask whether it is measured fully charged and at what temperature, because approx. 0.46 mΩ at 25 °C is a specific number and not a generic one.
  • Setpoints quoted as a range. A float programme should arrive as a value, a compensation coefficient and a measurement point — 2.23 V at 25 °C with −3 mV/°C/cell — not as a band.
  • Standards listed without documents. Names printed on a brochure are not certificates. Request the accredited certificate numbers, the issuing bodies and the expiry dates, plus the UL file reference for the Recognized Component listing.
  • Certification scope overstated. A UL Recognized Component mark applies to the component, not to a finished UPS or data centre installation; final listing and field evaluation remain the integrator’s responsibility under the local code.
  • Freight and port assumptions left open. Confirm the port of loading (Shanghai, Ningbo or Shenzhen) and the nominated port of discharge (Rotterdam, Antwerp, Jebel Ali, Singapore, Durban, Santos or Long Beach), who carries the freight cost, and whether the shipment is a full container of cells or a break-bulk consignment, because a 24-cell string of 84 kg cells and a two-tonne string has a different handling profile from the same product in 12 V format.

On documentation, the OPzV2-1200 is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. The practical step is to ask for the documents behind these marks — accredited certificate numbers and validity dates, the UL file reference, and the IEC 60896-21 test report — because that is the only part of a quality claim a buyer can audit. For a European data centre project the DIN 40472 and IEC 60896-21 conformity is what satisfies the local installer; for a North American project the UL file reference is what the AHJ will ask for; for a Chinese or South-East Asian network the YD/T 1360 route is the one that matches local procurement practice. Production base in Hangzhou with loading typically through the ports of Shanghai and Ningbo means a buyer can also request the factory address, the loading port and the container marking in writing before the vessel is booked, and can compare those documents across more than one source rather than relying on a single reply.

§6 — FAQ

Q1. What does the model code OPzV2-1200 mean, and what type of cell is it? It identifies a sealed tubular-plate gel stationary lead-acid cell. The OPzV series follows the tubular-plate construction defined in DIN 40472, the trailing 2 is the 2 V nominal cell voltage, and 1200 is the nominal capacity in ampere-hours. The electrolyte is gelled in a thixotropic silica suspension rather than held as free liquid, which is what makes the cell maintenance-free, spill-proof and suitable for a battery room without ventilation plenum design.

Q2. How is the 1200 Ah rated, and at what rate should a string be sized? The 1200 Ah figure is published at C10 to 1.80 V/cell at 20 °C, which is a 120 A discharge for ten hours. Sizing must be done against the real discharge profile using the closest published rate and against the end voltage the installed rectifier can actually support at the end of a deep discharge, and the datasheet gives the final voltage recommended for each discharge band from below 0.05 C through to 2 C.

Q3. Does the 20+ year design life apply at my site’s ambient temperature? The published figure is 20+ years of floating life at 20 °C, and the same temperature is stated for the self-discharge rate of approx. 2 % per month. Float life falls as ambient temperature rises, so a battery room that regularly exceeds 20 °C needs a derating calculation. Ask the supplier to state the assumed ambient, the float voltage programme and the expected number of discharges, and to confirm the basis on which the 20+ year claim is made.

Q4. What float and equalise voltages should the charger be programmed to? The datasheet specifies 2.23 V float and 2.35 V equalise at 25 °C, with temperature compensation of −3 mV/°C/cell. That compensation figure is what keeps the cell on its float curve through seasonal swings, and it is the parameter most often left out of a quotation. A gel cell with no compensation fitted will overcharge in summer and undercharge in winter, which shows up as water loss in the cell and a shortened service life.

Q5. Can OPzV2-1000, OPzV2-1200 and OPzV2-1500 cells be mixed in one cabinet or string? The three print different envelopes — L233 × W210 × H681 mm, L275 × W210 × H681 mm and L275 × W210 × H831 mm — so a mixed installation must be planned for three footprints. Cells of different capacities in one series string will also not share current equally. Mixing inside a series string is generally avoided; where it is unavoidable, the cells are managed as separate parallel strings by capacity.

Q6. What are the physical dimensions, weight and terminal torque? Printed dimensions are 275 × 210 × 681 mm, with a 646 mm container height and a 681 mm total height on the drawing, and terminal centres 108 mm across the width and 140 mm along the length. Weight is approximately 84 kg per cell. Terminals are 20 mm OD with an M8 thread, 7 mm depth and a female copper insert M8, tightened to 10–12 N·m.

Q7. How does a gel cell behave differently from a flooded cell in a standby string? A gel cell does not need periodic water topping, does not need a ventilated room for hydrogen escape and does not spill, which removes both the maintenance visit and the floor-loading monitoring. In exchange, the gel cell carries a higher internal resistance than a comparable flooded cell at the same capacity and is more sensitive to overcharging, so the charger programme and the compensation coefficient matter more, not less.

Q8. Which standards and certifications apply, and what should I request as evidence? The cell is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. Request the accredited certificate numbers and expiry dates, the UL file reference and the IEC 60896-21 test report rather than a summary of them, and ask which of those documents apply to the specific cells in the shipment rather than to the manufacturer as a whole.

Expert Summary

The OPzV2-1200 is a 2 V, 1200 Ah sealed tubular-plate gel stationary cell whose decisive published figures are unusually complete: 1200 Ah at C10 to 1.80 V/cell at 20 °C, internal resistance of approx. 0.46 mΩ fully charged at 25 °C, a designed floating life of 20+ years at 20 °C, a 2.23 V float and 2.35 V equalise at 25 °C with −3 mV/°C/cell compensation, 240 A maximum charge current, 2500 A maximum discharge at the 5S rate, a 6400 A short circuit current, self discharge of approx. 2 % per month at 20 °C, and an ambient window of −40 °C to +65 °C on discharge. Mechanically it occupies 275 × 210 × 681 mm at approximately 84 kg, with 20 mm OD M8 female insert terminals tightened to 10–12 N·m. In a 24-cell 48 V configuration those figures become 57.6 kWh nominal, 11.04 mΩ of string resistance, a 5,760 A charge ceiling and 2,016 kg of cells on the floor, at 28.6 Wh/kg of mass energy density against 27.3 Wh/kg for the 1000 Ah cell and 29.4 Wh/kg for the 1500 Ah cell. It is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. Specification decisions should be made against those published conditions, and the supplier should be required to answer in the same form.

Contact CHISEN — 24-Hour Response

CHISEN replies to technical and commercial enquiries within 24 hours.

To receive a quotation and a matching datasheet, send:

  • Your application — data centre UPS, telecom DC plant, substation or renewable hybrid — and the required string architecture or bus voltage
  • Required capacity per cell, the discharge profile and the target end voltage, or the total kWh and autonomy the design must deliver
  • Cell quantity, cabinet dimensions or the available footprint, and the ambient temperature range of the battery room
  • Destination port, delivery window and any tender or drawing documentation your client requires

Email: sales@chisen.cn

WhatsApp: +86 131 6622 6999

Call: +86 131 6622 6999

Related reading: OPzV2-1200 2V1200Ah model page · OPzV2-1000 2V1000Ah tubular gel cell · OPzV tubular gel battery range

Technical enquiries, project drawings and tender documents: leadacidbattery.cn

Related CHISEN Buyer Guides

  • OPzS2-200 2V200Ah Flooded Tubular Battery for Telecom DC Plants

    OPzS2-200 2V200Ah Flooded Tubular Battery for Telecom DC Plants

    Answer First

    The OPzS2-200 2V200Ah is a flooded tubular-plate stationary lead-acid cell rated 200 Ah at C10 to 1.80 V/cell at 20 °C, designed for 20+ years of float service at 20 °C, and it is the standard building block for 24-cell 48 V telecom DC plants and other stationary DC installations.

    In model-code terms, OPzS2-200 refers to a flooded tubular-plate cell in the OPz series: the trailing 2 denotes the 2 V nominal cell voltage and 200 the 200 Ah nominal capacity, with the plate construction defined by the DIN 40736 tubular-plate standard. Everything a technical evaluator needs — condition-bound capacity, internal resistance, float and equalize setpoints, charge acceptance, discharge limits, terminal geometry, electrolyte volume, weight, standards and certification scope — is published on the model’s own datasheet, so the cell can be engineered into a DC plant before any commercial discussion begins.

    Demand-side commentary from the IEA, BloombergNEF and Benchmark Minerals is useful for framing the direction of stationary backup and telecom DC power spending, and it also deserves a caution: none of those institutions publishes a cell-level specification, so none of them can confirm a capacity, a float life or a terminal torque. Procurement is settled at the datasheet level. On the published data, the OPzS2-200 resolves the three questions that dominate telecom DC plant tenders: whether the cell can carry a 48 V string without derating, whether its recharge acceptance can restore a full string inside the maintenance window, and whether the cell can be installed and serviced on site without redesigning the rack or the cabinet.

    Key Takeaways

    • The rating is condition-bound. 200 Ah is quoted at C10 to 1.80 V/cell at 20 °C, which is a 20 A discharge for ten hours. A capacity figure without its rate, end voltage and temperature cannot be compared with anything else on the market.
    • Float life is a 20 °C number. The datasheet states 20+ years of floating life at 20 °C. A supplier quoting a lifetime for a warmer ambient is making a different claim, and that difference belongs in the commercial comparison rather than in the footnote.
    • A 24-cell string is fully calculable. 24 × 2 V × 200 Ah = 9,600 Wh = 9.6 kWh nominal, with 22.8 mΩ of string internal resistance, a 960 A string charge ceiling, 420 kg of filled cells and 108 kg of electrolyte at fill. Every one of those figures follows directly from the cell data and can be verified before an order is placed.
    • Three sizes, two footprints. The OPzS2-150 and OPzS2-200 print the same 103 × 206 × 409 mm envelope, the OPzS2-250 is 21 mm longer at 124 × 206 × 409 mm, and dry weight steps from 10.5 kg to 13.0 kg to 15.5 kg. A mixed installation must be planned for two footprints and three weights.
    • Verification is inexpensive when the data is published. Standards, certifications, setpoints, drawing dimensions and terminal torque are all stated, so a technical approval can be completed against the datasheet and the supply question settled afterwards.

    §1 — OPzS2-200 2V200Ah Quick Specifications Table

    ParameterPublished valueSource
    ModelOPzS2-200, flooded tubular stationary cell, 2 V 200 AhModel page
    Nominal voltage2 VDatasheet
    Nominal capacity200 Ah at C10 to 1.80 V/cell at 20 °CDatasheet
    C10 discharge current20 A (200 Ah ÷ 10 h)Arithmetic
    Designed floating life20+ years @ 20 °CDatasheet
    Printed dimensions (L × W × H)103 × 206 × 409 mmDatasheet
    Drawing container height354 mmDatasheet
    Drawing total height409 mmDatasheet
    Drawing top view206 × 103 mmDatasheet
    Terminal centre spacing108 mmDatasheet
    Terminal20 mm OD, M8 thread, 7 mm depth, female copper insert M8Datasheet
    Terminal tightening torque10–12 N·mDatasheet
    Weight without electrolyte13.0 kg (28.7 lbs)Datasheet
    Weight with electrolyte17.5 kg (38.6 lbs)Datasheet
    ElectrolyteDiluted sulphuric acid, 1.240 g/cm³ at 20 °CDatasheet
    Acid weight per cell4.5 kgDatasheet
    Internal resistanceApprox. 0.95 mΩ, fully charged at 20 °CDatasheet
    Maximum charge current40 ADatasheet
    Charge characteristicConstant charge at 0.15 CA to 2.40 V at 20 °CDatasheet
    Maximum discharge current (5S)1000 ADatasheet
    Short circuit current2600 ADatasheet
    Self dischargeApprox. 4 % per month at 20 °CDatasheet
    Float charge voltage2.23 V @ 25 °CDatasheet
    Equalize charge voltage2.35 V @ 25 °CDatasheet
    Temperature compensation−3 mV/°C/cellDatasheet
    Ambient, discharge−25 °C to +65 °CDatasheet
    Ambient, charge−20 °C to +65 °CDatasheet
    Ambient, storage−15 °C to +40 °CDatasheet
    Container materialSANDatasheet
    Solar and wind setpointsOver-voltage disconnect 2.47 ± 0.01 V/cell @ 25 °C; regulation / equalize 2.40 ± 0.01 V/cell @ 25 °C; array reconnection 2.23 ± 0.005 V/cell @ 25 °C; float voltage setting 2.25 ± 0.005 V/cell @ 25 °C; low-voltage alarm 1.95 ± 0.005 V/cell @ 25 °C; low-voltage disconnect 1.90 ± 0.005 V/cell @ 25 °C; load reconnect 2.09 ± 0.01 V/cell @ 25 °C; temperature compensate coefficient −4 mV/cell/°CDatasheet (solar/wind page 2)
    Long-time discharge capacity, final voltage 1.85 VC24 226 Ah; C48 248 Ah; C72 260 Ah; C100 270 Ah; C120 274 Ah; C240 280 AhDatasheet (solar/wind page 2)
    24-cell string energy (48 V DC)24 × 2 V × 200 Ah = 9,600 Wh = 9.6 kWh nominalArithmetic
    24-cell string internal resistance24 × 0.95 mΩ = 22.8 mΩArithmetic
    24-cell string maximum charge current24 × 40 A = 960 AArithmetic
    24-cell string mass24 × 17.5 kg = 420 kg with electrolyte; 24 × 13.0 kg = 312 kg withoutArithmetic
    Electrolyte on site per 24-cell string24 × 4.5 kg = 108 kg of acid at fillArithmetic
    Energy density by mass400 Wh ÷ 17.5 kg = 22.9 Wh/kg (OPzS2-150: 300 Wh ÷ 14.5 kg = 20.7 Wh/kg; OPzS2-250: 500 Wh ÷ 20.5 kg = 24.4 Wh/kg)Arithmetic
    Applicable standardsIEC 60896-11, DIN 40736, IEC 61427, Eurobat long-life guide, BS 6290 part 4, UL 1989Datasheet
    CertificationsISO 9001 (EIC), ISO 14001 (UKAS/UCC), OHSAS 18001:2007 / GB/T 28001 (UCC), CE, UL Recognized Component (cURus / RU)Datasheet

    §2 — The Pain

    Telecom DC plant tenders fail quietly. A quotation arrives with a capacity number, a reference to a long working life and a delivery date, and the string is then assembled from a cell whose real behaviour was never stated. Nothing looks wrong until the first load test: the string sags earlier than the model file assumed, the charger cannot return the cells to float inside the maintenance window, and the replacement cycle arrives years earlier than the budget modelled.

    Three failure patterns account for most of that.

    Capacity quoted without a condition. A cell rated “200 Ah” on a datasheet that omits the discharge rate, the end voltage and the temperature is a cell whose usable energy is unknown. At 20 °C the OPzS2-200 delivers 200 Ah at C10 to 1.80 V/cell; the same cell gives 226 Ah at C24 and 270 Ah at C100 when the final voltage is relaxed to 1.85 V. Those are not contradictions but different duty cycles, and only one of them matches a given application. Only a published condition lets an engineer select correctly.

    Lifetime quoted at the wrong temperature. Float life is a function of float voltage, depth of discharge, ambient temperature and the number of discharges. The OPzS2-200 states 20+ years at 20 °C. A site running a battery room at 30 °C or above, or a cabinet exposed to direct sun, cannot claim that figure without derating, and a supplier who quotes two decades without naming the ambient temperature has removed the only number that mattered.

    Physical data missing from the tender set. Weight, footprint, terminal spacing, tightening torque and electrolyte volume decide whether the string fits the rack, whether the floor carries it, whether a technician can get a wrench into the aisle, and how much acid has to be handled on site. A 24-cell string of OPzS2-200 cells brings 420 kg of filled cells and 108 kg of electrolyte into the battery room. Discovering that after the cabinet is fabricated is an expensive way to learn it.

    Every one of these problems has the same remedy: specify against published, condition-bound data, and require the supplier to answer in the same form.

    §3 — The Choice

    ParameterOPzS2-150OPzS2-200OPzS2-250
    Capacity @ C10 to 1.80 V @ 20 °C150 Ah200 Ah250 Ah
    Printed dimensions (L × W × H)103 × 206 × 409 mm103 × 206 × 409 mm124 × 206 × 409 mm
    Weight without electrolyte10.5 kg (23.2 lbs)13.0 kg (28.7 lbs)15.5 kg (34.2 lbs)
    Weight with electrolyte14.5 kg (32.0 lbs)17.5 kg (38.6 lbs)20.5 kg (45.2 lbs)
    Acid weight4.0 kg4.5 kg5.0 kg
    Max charge current30 A40 A50 A
    Internal resistanceApprox. 1.2 mΩ @ 20 °CApprox. 0.95 mΩ @ 20 °CApprox. 0.88 mΩ @ 20 °C
    Short circuit current2400 A2600 A2750 A
    Float / equalize2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C
    Float life20+ yr @ 20 °C20+ yr @ 20 °C20+ yr @ 20 °C
    AmbientDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °CDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °CDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °C

    The OPzS2-200 is more reliable than the OPzS2-150 in a string sized around a 48 V bus because it returns 200 Ah instead of 150 Ah at the same C10 test while holding a lower internal resistance of approx. 0.95 mΩ against approx. 1.2 mΩ, which lowers voltage drop across the string and the heat generated during recharge. The OPzS2-200 is a better fit than the OPzS2-250 where rack depth is fixed, because the two print the same 103 mm length while the 250 extends to 124 mm; the 200 Ah cell gives up 1.5 Wh/kg of mass energy density (22.9 against 24.4 Wh/kg) in exchange for 21 mm less length and 3.0 kg less filled weight, and it carries a 40 A maximum charge current against 50 A. The OPzS2-200 is better suited to standby float duty in an existing telecom DC plant than a comparable LFP product, because its 2.23 V float and 2.35 V equalize programme matches installed charger hardware, bus voltage window and cabinet geometry without altering the charge regime or the cell footprint. The OPzS2-200 is more reliable in service than an unspecified 2 V 200 Ah cell, because every rating it publishes is tied to a stated condition — C10 to 1.80 V/cell at 20 °C, internal resistance measured fully charged at 20 °C, float life referenced to 20 °C — which removes the guesswork that causes premature string replacement.

    §4 — The Framework

    Seven numbers decide whether the OPzS2-200 belongs in a given DC plant. Everything else is negotiation.

    1. Capacity at a stated rate and temperature. 200 Ah at C10 to 1.80 V/cell at 20 °C, with the long-time discharge figures (226 Ah at C24 rising to 280 Ah at C240 at a 1.85 V final voltage) available for duty cycles away from the ten-hour rate.
    2. Internal resistance. Approx. 0.95 mΩ per cell fully charged at 20 °C, which becomes 22.8 mΩ across a 24-cell string and is the input to cable, busbar and interconnection sizing.
    3. Float and equalize setpoints with compensation. 2.23 V float and 2.35 V equalize at 25 °C, with −3 mV/°C/cell temperature compensation so the charger programme is written once and then left alone through seasonal swings.
    4. Charge acceptance. Maximum charge current of 40 A per cell, a constant-charge characteristic of 0.15 CA to 2.40 V at 20 °C, and a 960 A ceiling across a 24-cell string — the values to compare against the site’s rectifier output.
    5. Discharge and fault duty. Maximum discharge current of 1000 A at the 5S rate and a 2600 A short circuit current, which set the DC bus breaker rating, the fuse coordination and the ventilation assumptions.
    6. Mechanical and logistics envelope. 103 × 206 × 409 mm printed dimensions with a 354 mm container height and 108 mm terminal centre spacing, 13.0 kg dry and 17.5 kg filled, 4.5 kg of acid per cell, and 20 mm OD M8 female copper insert terminals tightened to 10–12 N·m — plus the site totals of 420 kg of cells and 108 kg of acid per 24-cell string.
    7. Environmental window and self-discharge. Discharge from −25 °C to +65 °C, charge from −20 °C to +65 °C, storage from −15 °C to +40 °C, and self discharge of approx. 4 % per month at 20 °C, which together determine standby behaviour, seasonal outage handling and the storage period for a site that is not permanently attended.

    §5 — The Trust

    A datasheet-rich market rewards buyers who verify. Nine traps are worth checking before a purchase order is raised.

    • Capacity without a condition. Ask for the rate, the end voltage and the temperature. If the reply is only “200 Ah”, the cell has not been specified.
    • Lifetime without an ambient. Require the stated temperature. 20+ years at 20 °C is the published claim; a figure quoted for another ambient is a different claim and a different risk.
    • Dimensions without the drawing. Printed dimensions, a 354 mm container height and a 409 mm total height are different measurements, and the 206 × 103 mm top view with 108 mm terminal spacing is what actually fixes the rack.
    • Dry weight quoted as installed weight. 13.0 kg without electrolyte and 17.5 kg with electrolyte are separate figures, and the difference is the handling and floor-load question.
    • Internal resistance quoted without conditions. Ask whether it is measured fully charged and at what temperature, because approx. 0.95 mΩ at 20 °C is a specific number, not a generic one.
    • Setpoints quoted as a range. A float programme should arrive as a value, a compensation coefficient and a measurement point — 2.23 V at 25 °C with −3 mV/°C/cell — not as “2.2 to 2.3 V”.
    • Standards listed without documents. Names printed on a brochure are not certificates. Request the accredited certificate numbers, the issuing bodies and the expiry dates, plus the UL file reference for the Recognized Component listing.
    • Certification scope overstated. A UL Recognized Component mark applies to the component, not to a finished DC plant; final listing and field evaluation remain the integrator’s responsibility under the local code.
    • Freight and port assumptions left open. Confirm the port of loading (Shanghai, Ningbo or Shenzhen) and the nominated port of discharge (Rotterdam, Antwerp, Felixstowe, Jebel Ali, Singapore, Ho Chi Minh City, Santos or Long Beach), who carries the freight cost, and whether the shipment is dry-filled with acid supplied separately or pre-filled, since that changes handling, customs classification and the 108 kg of acid per 24-cell string.

    On documentation, the OPzS2-200 is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. The manufacturing system behind it carries ISO 9001 accredited by EIC, ISO 14001 accredited by UKAS and UCC, OHSAS 18001:2007 and GB/T 28001 by UCC, CE marking, and a UL Recognized Component listing under cURus and RU. The practical step is to ask for the documents behind these marks — accredited certificate numbers and validity dates, the UL file reference, and the IEC 60896-11 test report — because that is the only part of a quality claim a buyer can audit. Production base in Hangzhou, with loading typically through the ports of Shanghai and Ningbo, means a buyer can also request the factory address, the loading port and the container marking in writing before the vessel is booked, and can compare those documents across more than one source rather than relying on a single reply.

    §6 — FAQ

    Q1. What does the model code OPzS2-200 mean, and what type of cell is it? It identifies a flooded tubular-plate stationary lead-acid cell. The OPz series follows the tubular-plate construction defined in DIN 40736, the trailing 2 is the 2 V nominal cell voltage, and 200 is the nominal capacity in Ah. It is an open, vented, serviceable cell with a SAN container, female M8 copper insert terminals and diluted sulphuric acid electrolyte at 1.240 g/cm³, intended for float standby duty rather than for cycling duty.

    Q2. How is the 200 Ah rated, and at what rate should a DC plant be sized? The 200 Ah figure is published at C10 to 1.80 V/cell at 20 °C, which is a 20 A discharge for ten hours. Where the duty cycle is gentler and a 1.85 V final voltage is acceptable, the datasheet also gives 226 Ah at C24, 248 Ah at C48, 260 Ah at C72, 270 Ah at C100, 274 Ah at C120 and 280 Ah at C240. Sizing must be done against the real discharge profile using the closest rate, and against the end voltage the installed rectifier can actually support at the end of a deep discharge.

    Q3. Does the 20+ year design life apply at my site’s ambient temperature? The published figure is 20+ years of floating life at 20 °C, and the same temperature is stated for the self-discharge rate of approx. 4 % per month. Float life falls as ambient temperature rises, so a battery room that regularly exceeds 20 °C, or a cabinet in direct sun, needs a derating calculation. Ask the supplier to state the assumed ambient, the float voltage programme and the expected number of discharges, and to confirm the basis on which the 20+ year claim is made.

    Q4. What float and equalize voltages should the charger be programmed to? The datasheet specifies 2.23 V float and 2.35 V equalize at 25 °C, with temperature compensation of −3 mV/°C/cell. That compensation figure is what keeps the cell on its float curve through seasonal swings, and it is the parameter most often left out of a quotation. A separate set of setpoints appears on page 2 of the same datasheet for solar and wind applications, including a 2.47 ± 0.01 V/cell over-voltage disconnect and a 1.90 ± 0.005 V/cell low-voltage disconnect; those belong to that regime and should not be transferred to a mains-backed DC plant without checking which regime the plant runs.

    Q5. Can OPzS2-150, OPzS2-200 and OPzS2-250 cells be mixed in one cabinet or string? The OPzS2-150 and OPzS2-200 print the same 103 × 206 × 409 mm envelope, while the OPzS2-250 is 21 mm longer at 124 × 206 × 409 mm, and dry weight differs across the three at 10.5, 13.0 and 15.5 kg. A mixed installation must therefore be planned for two footprints and three weights, and cells of different capacities in one series string will not share current equally. Mixing inside a series string is generally avoided; where it is unavoidable, the cells are managed as separate parallel strings by capacity.

    Q6. What are the physical dimensions, weight and terminal torque? Printed dimensions are 103 × 206 × 409 mm, with a 354 mm container height and a 409 mm total height on the drawing, a 206 × 103 mm top view and 108 mm terminal centre spacing. Weight is 13.0 kg without electrolyte and 17.5 kg with electrolyte. Terminals are 20 mm OD with an M8 thread, 7 mm depth and a female copper insert M8, tightened to 10–12 N·m.

    Q7. How much electrolyte is involved, and what does that mean for handling and shipping? Each cell takes 4.5 kg of acid in diluted sulphuric acid at 1.240 g/cm³, so a 24-cell string requires 108 kg of electrolyte at fill. Ask whether the consignment is dry-filled with acid supplied separately or pre-filled, since that changes the handling regime, the loading plan and the customs classification of the shipment.

    Q8. Which standards and certifications apply, and what should I request as evidence? The cell is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, with ISO 9001, ISO 14001, OHSAS 18001:2007 / GB/T 28001, CE marking and a UL Recognized Component listing under cURus and RU behind it. Request the accredited certificate numbers and expiry dates, the UL file reference and the IEC 60896-11 test report rather than a summary of them.

    Expert Summary

    The OPzS2-200 is a 2 V, 200 Ah flooded tubular stationary cell whose decisive published figures are unusually complete: 200 Ah at C10 to 1.80 V/cell at 20 °C, internal resistance of approx. 0.95 mΩ fully charged at 20 °C, a designed floating life of 20+ years at 20 °C, a 2.23 V float and 2.35 V equalize at 25 °C with −3 mV/°C/cell compensation, 40 A maximum charge current, 1000 A maximum discharge at the 5S rate, 2600 A short circuit current, self discharge of approx. 4 % per month at 20 °C, and an ambient window of −25 °C to +65 °C on discharge. Mechanically it occupies 103 × 206 × 409 mm at 13.0 kg dry and 17.5 kg filled, with 4.5 kg of acid and 20 mm OD M8 female insert terminals tightened to 10–12 N·m. In a 24-cell 48 V configuration those figures become 9.6 kWh nominal, 22.8 mΩ of string resistance, a 960 A charge ceiling and 420 kg of cells plus 108 kg of electrolyte on site. Against the 150 Ah and 250 Ah versions it holds the middle position: the same footprint as the 150 Ah cell with a lower internal resistance, and 21 mm shorter and 3.0 kg lighter than the 250 Ah cell for 1.5 Wh/kg less mass energy density. The cell is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, with ISO 9001, ISO 14001, OHSAS 18001:2007 / GB/T 28001, CE and a UL Recognized Component listing behind it. Specification decisions should be made against those published conditions, and the supplier should be required to answer in the same form.

    Contact CHISEN — 24-Hour Response

    CHISEN replies to technical and commercial enquiries within 24 hours.

    To receive a quotation and a matching datasheet, send:

    • Your application — telecom DC plant, UPS, substation or renewable hybrid — and the required string architecture or bus voltage
    • Required capacity per cell, the discharge profile and the target end voltage, or the total kWh and autonomy the design must deliver
    • Cell quantity, cabinet dimensions or the available footprint, and the ambient temperature range of the battery room
    • Destination port, delivery window and any tender or drawing documentation your client requires

    Email: sales@chisen.cn

    WhatsApp: +86 131 6622 6999

    Call: +86 131 6622 6999

    Related reading: OPzS2-200 2V200Ah model page · OPzS2-250 2V250Ah model page · OPzS flooded tubular battery range

    Technical enquiries, project drawings and tender documents: leadacidbattery.cn

    Related CHISEN Buyer Guides

  • OPzS2-200 2V200Ah Flooded Tubular Battery for Telecom DC Plants

    OPzS2-200 2V200Ah Flooded Tubular Battery for Telecom DC Plants

    Answer First

    The OPzS2-200 2V200Ah is a flooded tubular-plate stationary lead-acid cell rated 200 Ah at C10 to 1.80 V/cell at 20 °C, designed for 20+ years of float service at 20 °C, and it is the standard building block for 24-cell 48 V telecom DC plants and other stationary DC installations.

    In model-code terms, OPzS2-200 refers to a flooded tubular-plate cell in the OPz series: the trailing 2 denotes the 2 V nominal cell voltage and 200 the 200 Ah nominal capacity, with the plate construction defined by the DIN 40736 tubular-plate standard. Everything a technical evaluator needs — condition-bound capacity, internal resistance, float and equalize setpoints, charge acceptance, discharge limits, terminal geometry, electrolyte volume, weight, standards and certification scope — is published on the model’s own datasheet, so the cell can be engineered into a DC plant before any commercial discussion begins.

    Demand-side commentary from the IEA, BloombergNEF and Benchmark Minerals is useful for framing the direction of stationary backup and telecom DC power spending, and it also deserves a caution: none of those institutions publishes a cell-level specification, so none of them can confirm a capacity, a float life or a terminal torque. Procurement is settled at the datasheet level. On the published data, the OPzS2-200 resolves the three questions that dominate telecom DC plant tenders: whether the cell can carry a 48 V string without derating, whether its recharge acceptance can restore a full string inside the maintenance window, and whether the cell can be installed and serviced on site without redesigning the rack or the cabinet.

    Key Takeaways

    • The rating is condition-bound. 200 Ah is quoted at C10 to 1.80 V/cell at 20 °C, which is a 20 A discharge for ten hours. A capacity figure without its rate, end voltage and temperature cannot be compared with anything else on the market.
    • Float life is a 20 °C number. The datasheet states 20+ years of floating life at 20 °C. A supplier quoting a lifetime for a warmer ambient is making a different claim, and that difference belongs in the commercial comparison rather than in the footnote.
    • A 24-cell string is fully calculable. 24 × 2 V × 200 Ah = 9,600 Wh = 9.6 kWh nominal, with 22.8 mΩ of string internal resistance, a 960 A string charge ceiling, 420 kg of filled cells and 108 kg of electrolyte at fill. Every one of those figures follows directly from the cell data and can be verified before an order is placed.
    • Three sizes, two footprints. The OPzS2-150 and OPzS2-200 print the same 103 × 206 × 409 mm envelope, the OPzS2-250 is 21 mm longer at 124 × 206 × 409 mm, and dry weight steps from 10.5 kg to 13.0 kg to 15.5 kg. A mixed installation must be planned for two footprints and three weights.
    • Verification is inexpensive when the data is published. Standards, certifications, setpoints, drawing dimensions and terminal torque are all stated, so a technical approval can be completed against the datasheet and the supply question settled afterwards.

    §1 — OPzS2-200 2V200Ah Quick Specifications Table

    ParameterPublished valueSource
    ModelOPzS2-200, flooded tubular stationary cell, 2 V 200 AhModel page
    Nominal voltage2 VDatasheet
    Nominal capacity200 Ah at C10 to 1.80 V/cell at 20 °CDatasheet
    C10 discharge current20 A (200 Ah ÷ 10 h)Arithmetic
    Designed floating life20+ years @ 20 °CDatasheet
    Printed dimensions (L × W × H)103 × 206 × 409 mmDatasheet
    Drawing container height354 mmDatasheet
    Drawing total height409 mmDatasheet
    Drawing top view206 × 103 mmDatasheet
    Terminal centre spacing108 mmDatasheet
    Terminal20 mm OD, M8 thread, 7 mm depth, female copper insert M8Datasheet
    Terminal tightening torque10–12 N·mDatasheet
    Weight without electrolyte13.0 kg (28.7 lbs)Datasheet
    Weight with electrolyte17.5 kg (38.6 lbs)Datasheet
    ElectrolyteDiluted sulphuric acid, 1.240 g/cm³ at 20 °CDatasheet
    Acid weight per cell4.5 kgDatasheet
    Internal resistanceApprox. 0.95 mΩ, fully charged at 20 °CDatasheet
    Maximum charge current40 ADatasheet
    Charge characteristicConstant charge at 0.15 CA to 2.40 V at 20 °CDatasheet
    Maximum discharge current (5S)1000 ADatasheet
    Short circuit current2600 ADatasheet
    Self dischargeApprox. 4 % per month at 20 °CDatasheet
    Float charge voltage2.23 V @ 25 °CDatasheet
    Equalize charge voltage2.35 V @ 25 °CDatasheet
    Temperature compensation−3 mV/°C/cellDatasheet
    Ambient, discharge−25 °C to +65 °CDatasheet
    Ambient, charge−20 °C to +65 °CDatasheet
    Ambient, storage−15 °C to +40 °CDatasheet
    Container materialSANDatasheet
    Solar and wind setpointsOver-voltage disconnect 2.47 ± 0.01 V/cell @ 25 °C; regulation / equalize 2.40 ± 0.01 V/cell @ 25 °C; array reconnection 2.23 ± 0.005 V/cell @ 25 °C; float voltage setting 2.25 ± 0.005 V/cell @ 25 °C; low-voltage alarm 1.95 ± 0.005 V/cell @ 25 °C; low-voltage disconnect 1.90 ± 0.005 V/cell @ 25 °C; load reconnect 2.09 ± 0.01 V/cell @ 25 °C; temperature compensate coefficient −4 mV/cell/°CDatasheet (solar/wind page 2)
    Long-time discharge capacity, final voltage 1.85 VC24 226 Ah; C48 248 Ah; C72 260 Ah; C100 270 Ah; C120 274 Ah; C240 280 AhDatasheet (solar/wind page 2)
    24-cell string energy (48 V DC)24 × 2 V × 200 Ah = 9,600 Wh = 9.6 kWh nominalArithmetic
    24-cell string internal resistance24 × 0.95 mΩ = 22.8 mΩArithmetic
    24-cell string maximum charge current24 × 40 A = 960 AArithmetic
    24-cell string mass24 × 17.5 kg = 420 kg with electrolyte; 24 × 13.0 kg = 312 kg withoutArithmetic
    Electrolyte on site per 24-cell string24 × 4.5 kg = 108 kg of acid at fillArithmetic
    Energy density by mass400 Wh ÷ 17.5 kg = 22.9 Wh/kg (OPzS2-150: 300 Wh ÷ 14.5 kg = 20.7 Wh/kg; OPzS2-250: 500 Wh ÷ 20.5 kg = 24.4 Wh/kg)Arithmetic
    Applicable standardsIEC 60896-11, DIN 40736, IEC 61427, Eurobat long-life guide, BS 6290 part 4, UL 1989Datasheet
    CertificationsISO 9001 (EIC), ISO 14001 (UKAS/UCC), OHSAS 18001:2007 / GB/T 28001 (UCC), CE, UL Recognized Component (cURus / RU)Datasheet

    §2 — The Pain

    Telecom DC plant tenders fail quietly. A quotation arrives with a capacity number, a reference to a long working life and a delivery date, and the string is then assembled from a cell whose real behaviour was never stated. Nothing looks wrong until the first load test: the string sags earlier than the model file assumed, the charger cannot return the cells to float inside the maintenance window, and the replacement cycle arrives years earlier than the budget modelled.

    Three failure patterns account for most of that.

    Capacity quoted without a condition. A cell rated “200 Ah” on a datasheet that omits the discharge rate, the end voltage and the temperature is a cell whose usable energy is unknown. At 20 °C the OPzS2-200 delivers 200 Ah at C10 to 1.80 V/cell; the same cell gives 226 Ah at C24 and 270 Ah at C100 when the final voltage is relaxed to 1.85 V. Those are not contradictions but different duty cycles, and only one of them matches a given application. Only a published condition lets an engineer select correctly.

    Lifetime quoted at the wrong temperature. Float life is a function of float voltage, depth of discharge, ambient temperature and the number of discharges. The OPzS2-200 states 20+ years at 20 °C. A site running a battery room at 30 °C or above, or a cabinet exposed to direct sun, cannot claim that figure without derating, and a supplier who quotes two decades without naming the ambient temperature has removed the only number that mattered.

    Physical data missing from the tender set. Weight, footprint, terminal spacing, tightening torque and electrolyte volume decide whether the string fits the rack, whether the floor carries it, whether a technician can get a wrench into the aisle, and how much acid has to be handled on site. A 24-cell string of OPzS2-200 cells brings 420 kg of filled cells and 108 kg of electrolyte into the battery room. Discovering that after the cabinet is fabricated is an expensive way to learn it.

    Every one of these problems has the same remedy: specify against published, condition-bound data, and require the supplier to answer in the same form.

    §3 — The Choice

    ParameterOPzS2-150OPzS2-200OPzS2-250
    Capacity @ C10 to 1.80 V @ 20 °C150 Ah200 Ah250 Ah
    Printed dimensions (L × W × H)103 × 206 × 409 mm103 × 206 × 409 mm124 × 206 × 409 mm
    Weight without electrolyte10.5 kg (23.2 lbs)13.0 kg (28.7 lbs)15.5 kg (34.2 lbs)
    Weight with electrolyte14.5 kg (32.0 lbs)17.5 kg (38.6 lbs)20.5 kg (45.2 lbs)
    Acid weight4.0 kg4.5 kg5.0 kg
    Max charge current30 A40 A50 A
    Internal resistanceApprox. 1.2 mΩ @ 20 °CApprox. 0.95 mΩ @ 20 °CApprox. 0.88 mΩ @ 20 °C
    Short circuit current2400 A2600 A2750 A
    Float / equalize2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C
    Float life20+ yr @ 20 °C20+ yr @ 20 °C20+ yr @ 20 °C
    AmbientDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °CDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °CDischarge −25~65 °C / charge −20~65 °C / storage −15~40 °C

    The OPzS2-200 is more reliable than the OPzS2-150 in a string sized around a 48 V bus because it returns 200 Ah instead of 150 Ah at the same C10 test while holding a lower internal resistance of approx. 0.95 mΩ against approx. 1.2 mΩ, which lowers voltage drop across the string and the heat generated during recharge. The OPzS2-200 is a better fit than the OPzS2-250 where rack depth is fixed, because the two print the same 103 mm length while the 250 extends to 124 mm; the 200 Ah cell gives up 1.5 Wh/kg of mass energy density (22.9 against 24.4 Wh/kg) in exchange for 21 mm less length and 3.0 kg less filled weight, and it carries a 40 A maximum charge current against 50 A. The OPzS2-200 is better suited to standby float duty in an existing telecom DC plant than a comparable LFP product, because its 2.23 V float and 2.35 V equalize programme matches installed charger hardware, bus voltage window and cabinet geometry without altering the charge regime or the cell footprint. The OPzS2-200 is more reliable in service than an unspecified 2 V 200 Ah cell, because every rating it publishes is tied to a stated condition — C10 to 1.80 V/cell at 20 °C, internal resistance measured fully charged at 20 °C, float life referenced to 20 °C — which removes the guesswork that causes premature string replacement.

    §4 — The Framework

    Seven numbers decide whether the OPzS2-200 belongs in a given DC plant. Everything else is negotiation.

    1. Capacity at a stated rate and temperature. 200 Ah at C10 to 1.80 V/cell at 20 °C, with the long-time discharge figures (226 Ah at C24 rising to 280 Ah at C240 at a 1.85 V final voltage) available for duty cycles away from the ten-hour rate.
    2. Internal resistance. Approx. 0.95 mΩ per cell fully charged at 20 °C, which becomes 22.8 mΩ across a 24-cell string and is the input to cable, busbar and interconnection sizing.
    3. Float and equalize setpoints with compensation. 2.23 V float and 2.35 V equalize at 25 °C, with −3 mV/°C/cell temperature compensation so the charger programme is written once and then left alone through seasonal swings.
    4. Charge acceptance. Maximum charge current of 40 A per cell, a constant-charge characteristic of 0.15 CA to 2.40 V at 20 °C, and a 960 A ceiling across a 24-cell string — the values to compare against the site’s rectifier output.
    5. Discharge and fault duty. Maximum discharge current of 1000 A at the 5S rate and a 2600 A short circuit current, which set the DC bus breaker rating, the fuse coordination and the ventilation assumptions.
    6. Mechanical and logistics envelope. 103 × 206 × 409 mm printed dimensions with a 354 mm container height and 108 mm terminal centre spacing, 13.0 kg dry and 17.5 kg filled, 4.5 kg of acid per cell, and 20 mm OD M8 female copper insert terminals tightened to 10–12 N·m — plus the site totals of 420 kg of cells and 108 kg of acid per 24-cell string.
    7. Environmental window and self-discharge. Discharge from −25 °C to +65 °C, charge from −20 °C to +65 °C, storage from −15 °C to +40 °C, and self discharge of approx. 4 % per month at 20 °C, which together determine standby behaviour, seasonal outage handling and the storage period for a site that is not permanently attended.

    §5 — The Trust

    A datasheet-rich market rewards buyers who verify. Nine traps are worth checking before a purchase order is raised.

    • Capacity without a condition. Ask for the rate, the end voltage and the temperature. If the reply is only “200 Ah”, the cell has not been specified.
    • Lifetime without an ambient. Require the stated temperature. 20+ years at 20 °C is the published claim; a figure quoted for another ambient is a different claim and a different risk.
    • Dimensions without the drawing. Printed dimensions, a 354 mm container height and a 409 mm total height are different measurements, and the 206 × 103 mm top view with 108 mm terminal spacing is what actually fixes the rack.
    • Dry weight quoted as installed weight. 13.0 kg without electrolyte and 17.5 kg with electrolyte are separate figures, and the difference is the handling and floor-load question.
    • Internal resistance quoted without conditions. Ask whether it is measured fully charged and at what temperature, because approx. 0.95 mΩ at 20 °C is a specific number, not a generic one.
    • Setpoints quoted as a range. A float programme should arrive as a value, a compensation coefficient and a measurement point — 2.23 V at 25 °C with −3 mV/°C/cell — not as “2.2 to 2.3 V”.
    • Standards listed without documents. Names printed on a brochure are not certificates. Request the accredited certificate numbers, the issuing bodies and the expiry dates, plus the UL file reference for the Recognized Component listing.
    • Certification scope overstated. A UL Recognized Component mark applies to the component, not to a finished DC plant; final listing and field evaluation remain the integrator’s responsibility under the local code.
    • Freight and port assumptions left open. Confirm the port of loading (Shanghai, Ningbo or Shenzhen) and the nominated port of discharge (Rotterdam, Antwerp, Felixstowe, Jebel Ali, Singapore, Ho Chi Minh City, Santos or Long Beach), who carries the freight cost, and whether the shipment is dry-filled with acid supplied separately or pre-filled, since that changes handling, customs classification and the 108 kg of acid per 24-cell string.

    On documentation, the OPzS2-200 is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. The manufacturing system behind it carries ISO 9001 accredited by EIC, ISO 14001 accredited by UKAS and UCC, OHSAS 18001:2007 and GB/T 28001 by UCC, CE marking, and a UL Recognized Component listing under cURus and RU. The practical step is to ask for the documents behind these marks — accredited certificate numbers and validity dates, the UL file reference, and the IEC 60896-11 test report — because that is the only part of a quality claim a buyer can audit. Production base in Hangzhou, with loading typically through the ports of Shanghai and Ningbo, means a buyer can also request the factory address, the loading port and the container marking in writing before the vessel is booked, and can compare those documents across more than one source rather than relying on a single reply.

    §6 — FAQ

    Q1. What does the model code OPzS2-200 mean, and what type of cell is it? It identifies a flooded tubular-plate stationary lead-acid cell. The OPz series follows the tubular-plate construction defined in DIN 40736, the trailing 2 is the 2 V nominal cell voltage, and 200 is the nominal capacity in Ah. It is an open, vented, serviceable cell with a SAN container, female M8 copper insert terminals and diluted sulphuric acid electrolyte at 1.240 g/cm³, intended for float standby duty rather than for cycling duty.

    Q2. How is the 200 Ah rated, and at what rate should a DC plant be sized? The 200 Ah figure is published at C10 to 1.80 V/cell at 20 °C, which is a 20 A discharge for ten hours. Where the duty cycle is gentler and a 1.85 V final voltage is acceptable, the datasheet also gives 226 Ah at C24, 248 Ah at C48, 260 Ah at C72, 270 Ah at C100, 274 Ah at C120 and 280 Ah at C240. Sizing must be done against the real discharge profile using the closest rate, and against the end voltage the installed rectifier can actually support at the end of a deep discharge.

    Q3. Does the 20+ year design life apply at my site’s ambient temperature? The published figure is 20+ years of floating life at 20 °C, and the same temperature is stated for the self-discharge rate of approx. 4 % per month. Float life falls as ambient temperature rises, so a battery room that regularly exceeds 20 °C, or a cabinet in direct sun, needs a derating calculation. Ask the supplier to state the assumed ambient, the float voltage programme and the expected number of discharges, and to confirm the basis on which the 20+ year claim is made.

    Q4. What float and equalize voltages should the charger be programmed to? The datasheet specifies 2.23 V float and 2.35 V equalize at 25 °C, with temperature compensation of −3 mV/°C/cell. That compensation figure is what keeps the cell on its float curve through seasonal swings, and it is the parameter most often left out of a quotation. A separate set of setpoints appears on page 2 of the same datasheet for solar and wind applications, including a 2.47 ± 0.01 V/cell over-voltage disconnect and a 1.90 ± 0.005 V/cell low-voltage disconnect; those belong to that regime and should not be transferred to a mains-backed DC plant without checking which regime the plant runs.

    Q5. Can OPzS2-150, OPzS2-200 and OPzS2-250 cells be mixed in one cabinet or string? The OPzS2-150 and OPzS2-200 print the same 103 × 206 × 409 mm envelope, while the OPzS2-250 is 21 mm longer at 124 × 206 × 409 mm, and dry weight differs across the three at 10.5, 13.0 and 15.5 kg. A mixed installation must therefore be planned for two footprints and three weights, and cells of different capacities in one series string will not share current equally. Mixing inside a series string is generally avoided; where it is unavoidable, the cells are managed as separate parallel strings by capacity.

    Q6. What are the physical dimensions, weight and terminal torque? Printed dimensions are 103 × 206 × 409 mm, with a 354 mm container height and a 409 mm total height on the drawing, a 206 × 103 mm top view and 108 mm terminal centre spacing. Weight is 13.0 kg without electrolyte and 17.5 kg with electrolyte. Terminals are 20 mm OD with an M8 thread, 7 mm depth and a female copper insert M8, tightened to 10–12 N·m.

    Q7. How much electrolyte is involved, and what does that mean for handling and shipping? Each cell takes 4.5 kg of acid in diluted sulphuric acid at 1.240 g/cm³, so a 24-cell string requires 108 kg of electrolyte at fill. Ask whether the consignment is dry-filled with acid supplied separately or pre-filled, since that changes the handling regime, the loading plan and the customs classification of the shipment.

    Q8. Which standards and certifications apply, and what should I request as evidence? The cell is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, with ISO 9001, ISO 14001, OHSAS 18001:2007 / GB/T 28001, CE marking and a UL Recognized Component listing under cURus and RU behind it. Request the accredited certificate numbers and expiry dates, the UL file reference and the IEC 60896-11 test report rather than a summary of them.

    Expert Summary

    The OPzS2-200 is a 2 V, 200 Ah flooded tubular stationary cell whose decisive published figures are unusually complete: 200 Ah at C10 to 1.80 V/cell at 20 °C, internal resistance of approx. 0.95 mΩ fully charged at 20 °C, a designed floating life of 20+ years at 20 °C, a 2.23 V float and 2.35 V equalize at 25 °C with −3 mV/°C/cell compensation, 40 A maximum charge current, 1000 A maximum discharge at the 5S rate, 2600 A short circuit current, self discharge of approx. 4 % per month at 20 °C, and an ambient window of −25 °C to +65 °C on discharge. Mechanically it occupies 103 × 206 × 409 mm at 13.0 kg dry and 17.5 kg filled, with 4.5 kg of acid and 20 mm OD M8 female insert terminals tightened to 10–12 N·m. In a 24-cell 48 V configuration those figures become 9.6 kWh nominal, 22.8 mΩ of string resistance, a 960 A charge ceiling and 420 kg of cells plus 108 kg of electrolyte on site. Against the 150 Ah and 250 Ah versions it holds the middle position: the same footprint as the 150 Ah cell with a lower internal resistance, and 21 mm shorter and 3.0 kg lighter than the 250 Ah cell for 1.5 Wh/kg less mass energy density. The cell is built to IEC 60896-11, DIN 40736, IEC 61427, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, with ISO 9001, ISO 14001, OHSAS 18001:2007 / GB/T 28001, CE and a UL Recognized Component listing behind it. Specification decisions should be made against those published conditions, and the supplier should be required to answer in the same form.

    Contact CHISEN — 24-Hour Response

    CHISEN replies to technical and commercial enquiries within 24 hours.

    To receive a quotation and a matching datasheet, send:

    • Your application — telecom DC plant, UPS, substation or renewable hybrid — and the required string architecture or bus voltage
    • Required capacity per cell, the discharge profile and the target end voltage, or the total kWh and autonomy the design must deliver
    • Cell quantity, cabinet dimensions or the available footprint, and the ambient temperature range of the battery room
    • Destination port, delivery window and any tender or drawing documentation your client requires

    Email: sales@chisen.cn

    WhatsApp: +86 131 6622 6999

    Call: +86 131 6622 6999

    Related reading: OPzS2-200 2V200Ah model page · OPzS2-250 2V250Ah model page · OPzS flooded tubular battery range

    Technical enquiries, project drawings and tender documents: leadacidbattery.cn

    Related CHISEN Buyer Guides

  • OPzV2-2000 2V2000Ah Tubular Gel Battery for Utility Storage and DC Backup

    OPzV2-2000 2V2000Ah Tubular Gel Battery for Utility Storage and DC Backup

    Answer First

    The OPzV2-2000 2V2000Ah is a sealed tubular-plate gel stationary cell rated 2000 Ah at C10 to 1.80 V/cell at 20 °C, published with a designed floating life of 20+ years at 20 °C, an internal resistance of approx. 0.37 mΩ fully charged at 25 °C, a maximum charge current of 400 A and a short circuit current of 8300 A — the cell that a utility-scale or large-capacity stationary installation is usually built from when the specification calls for a very large block of energy in a 48 V string without pushing the cell count past what the cabinets, the floor and the string bus can carry.

    OPzV2-2000 refers to a gel-electrolyte stationary cell in the OPzV series: the trailing 2 denotes the 2 V nominal cell voltage, 2000 is the nominal capacity in ampere-hours, and the OPzV prefix identifies the tubular-plate construction with a gel electrolyte rather than a flooded one. Every rating a technical evaluator needs is published against a stated condition — capacity at C10 to 1.80 V/cell at 20 °C, internal resistance fully charged at 25 °C, floating life referenced to 20 °C — and that is what allows a string of this size to be engineered and priced before any commercial discussion begins.

    Demand-side commentary from the IEA, BloombergNEF and Benchmark Minerals is useful for framing the direction of grid-scale and large stationary storage spending, and it also deserves a caution: none of those institutions publishes a cell-level specification, so none of them can confirm a capacity, a float life or a terminal torque. Procurement is settled at the datasheet level. On the published data the OPzV2-2000 resolves the three questions that dominate a project of this size: whether the energy can be delivered inside the required window without a voltage derate, whether the charger programme can restore the string after a deep discharge, and whether a 3.5-tonne string can be installed, transported and maintained within the logistics of the destination port.

    Key Takeaways

    • The rating is condition-bound. 2000 Ah is quoted at C10 to 1.80 V/cell at 20 °C, which is a 200 A discharge for ten hours. A capacity figure quoted without its rate, its end voltage and its temperature cannot be compared against anything else, because every supplier selects different conditions and the number then means different things.
    • Float life is a 20 °C number. The datasheet states 20+ years of floating life at 20 °C, and the same 20 °C reference carries the self-discharge rate of approx. 2 % per month. A supplier quoting a lifetime for a warmer ambient is making a different claim, and that difference belongs in the commercial comparison rather than in a footnote.
    • A 24-cell string is fully calculable. 24 × 2 V × 2000 Ah = 96 kWh nominal, with 8.88 mΩ of string internal resistance, a 9,600 A string charge ceiling, and 3,480 kg of cells. Every one of those figures follows directly from the cell data and can be checked before an order is placed.
    • The size gain comes from fewer connections, not better chemistry. At 4000 Wh and 145 kg the cell delivers 27.6 Wh/kg, against 27.3 Wh/kg for the 1000 Ah cell and 29.4 Wh/kg for the 1500 Ah cell. Energy density is effectively unchanged; what changes is that a string needs fewer cells, fewer interconnects and fewer cabinets.
    • Verification is inexpensive when the data is published. Setpoints, the temperature compensation coefficient, drawing dimensions, terminal torque, internal resistance, the short circuit current, the certifications and the standards list are all stated, so a technical approval can be completed against the datasheet and the supply question settled afterwards.

    §1 — OPzV2-2000 2V2000Ah Quick Specifications Table

    ParameterPublished valueSource
    ModelOPzV2-2000, tubular-plate gel stationary cell, 2 V 2000 AhModel page
    Nominal voltage2 VDatasheet
    Nominal capacity2000 Ah at C10 to 1.80 V/cell at 20 °CDatasheet
    C10 discharge current200 A (2000 Ah ÷ 10 h)Arithmetic
    Designed floating life20+ years @ 20 °CDatasheet
    Printed dimensions (L × W × H)399 × 212 × 807 mmDatasheet
    Drawing container height772 mmDatasheet
    Drawing total height807 mmDatasheet
    Drawing width / length212 mm / 399 mmDatasheet
    Terminal spacing108 mm across width, 110 mm and 110 mm along lengthDatasheet
    Terminal20 mm OD, M8 thread, 7 mm depth, female copper insert M8Datasheet
    Terminal tightening torque10–12 N·mDatasheet
    Approximate weight145 kg (320 lbs)Datasheet
    Internal resistanceApprox. 0.37 mΩ, fully charged at 25 °CDatasheet
    Maximum charge current400 ADatasheet
    Charge characteristicConstant charge at 0.15 CA to 2.40 V at 20 °CDatasheet
    Maximum discharge current (5S)3000 ADatasheet
    Short circuit current8300 ADatasheet
    Self dischargeApprox. 2 % per month at 20 °CDatasheet
    Float charge voltage2.23 V @ 25 °CDatasheet
    Equalise charge voltage2.35 V @ 25 °CDatasheet
    Temperature compensation−3 mV/°C/cellDatasheet
    Ambient, discharge−40 °C to +65 °CDatasheet
    Ambient, charge−30 °C to +65 °CDatasheet
    Ambient, storage−25 °C to +45 °CDatasheet
    Container materialABS, UL94-V0 optionalDatasheet
    Applicable standardsIEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, Eurobat long-life guide, BS 6290 part 4, UL 1989Datasheet
    CertificationsISO 9001 (EIC), ISO 14001 (UKAS/UCC), GB/T 28001 / OHSAS 18001:2007 (UCC), CE, RU (UL Recognized Component)Datasheet

    The final voltage recommended for a given discharge rate is published as well: below 0.05 C the cell supports at least 1.90 V per cell, between 0.05 C and 0.08 C at least 1.85 V, between 0.08 C and 0.2 C at least 1.80 V, between 0.2 C and 0.6 C at least 1.75 V, between 0.6 C and 1.0 C at least 1.70 V, and from 1 C to 2 C at least 1.60 V. Those figures, not a nominal 2 V, are what a battery management system should be configured against.

    §2 — The Pain

    An installation at this scale fails on integration long before it fails on chemistry. The recurring problems are a specification that cannot be compared, a string whose consequences nobody has computed, and logistics that were never sized for the cell.

    Specification ambiguity is the first. A 2000 Ah cell quoted without a rate, an end voltage and a temperature is not a 2000 Ah cell, it is a marketing label. At this capacity the ambiguity is expensive, because a 2000 Ah cell that delivers only its C3 rating is a fundamentally different procurement from one that delivers its C10 rating, and the difference shows up as a cabinet count, a rectifier size or an autonomy shortfall on day one of commissioning. The same applies to float life quoted at a warmer ambient than the site will see, and to internal resistance quoted without a temperature.

    String-level arithmetic is the second. A 24-cell string at this size is 96 kWh and 3,480 kg of cells. The mass alone determines floor loading, aisle width, the lifting plan, the handling equipment specification and the freight booking, because a cell of this weight is not palletised the way a 25 kg cell is. The 8.88 mΩ string resistance and the 9,600 A string charge ceiling determine the busbar, the DC breaker and the rectifier specification. When these are computed after the order is placed, they are computed by a party who does not carry the consequence.

    Logistics is the third, and it is the failure mode that surprises buyers most often. Cells of 145 kg have a very different shipping profile from cells of 84 kg: the pallet configuration, the container loading plan, the number of containers for a given megawatt-hour, the crane requirement at the discharge port and the labour to unload all change with the cell weight and the pallet height. A tender that prices the cells and forgets the handling profile produces an installation that cannot be received.

    §3 — The Choice

    The OPzV2-2000 sits at the top of the published OPzV2 range, and the comparison is a question of connections, cabinets and floor area rather than of any single headline figure.

    OPzV2-1000OPzV2-1200OPzV2-1500OPzV2-2000
    Capacity @ C10 to 1.80 V @ 20 °C1000 Ah1200 Ah1500 Ah2000 Ah
    Printed dimensionsL233 × W210 × H681 mmL275 × W210 × H681 mmL275 × W210 × H831 mmL399 × W212 × H807 mm
    Approximate weight73.2 kg (161.4 lbs)84 kg (185 lbs)102 kg (225 lbs)145 kg (320 lbs)
    Max charge current200 A240 A300 A400 A
    Internal resistanceapprox. 0.5 mΩ @ 25 °Capprox. 0.46 mΩ @ 25 °Capprox. 0.45 mΩ @ 25 °Capprox. 0.37 mΩ @ 25 °C
    Short circuit current5400 A6400 A6200 A8300 A
    Float / equalise2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C2.23 V / 2.35 V @ 25 °C
    Designed floating life20+ yr @ 20 °C20+ yr @ 20 °C20+ yr @ 20 °C20+ yr @ 20 °C
    String arithmetic, 24 cells in seriesOPzV2-1000OPzV2-1200OPzV2-1500OPzV2-2000
    —————
    Nominal energy (24 × 2 V × Ah)48.0 kWh57.6 kWh72.0 kWh96.0 kWh
    String mass (24 × cell weight)1,756.8 kg2,016 kg2,448 kg3,480 kg
    String internal resistance (24 × IR)12.0 mΩ11.04 mΩ10.8 mΩ8.88 mΩ
    String max charge current (24 × I)4,800 A5,760 A7,200 A9,600 A
    Mass energy density (Wh ÷ kg)2,000 ÷ 73.2 = 27.3 Wh/kg2,400 ÷ 84 = 28.6 Wh/kg3,000 ÷ 102 = 29.4 Wh/kg4,000 ÷ 145 = 27.6 Wh/kg

    The OPzV2-2000 string figures are derived from the cell data, and the working is shown so that each figure can be checked:

    Derivation for the OPzV2-2000, 24 cells in seriesWorkingSource
    Nominal energy24 × 2 V × 2000 Ah = 96 kWhArithmetic
    String mass with cells24 × 145 kg = 3,480 kgArithmetic
    String internal resistance24 × 0.37 mΩ = 8.88 mΩArithmetic
    String max charge current24 × 400 A = 9,600 AArithmetic
    Mass energy density4,000 Wh ÷ 145 kg = 27.6 Wh/kgArithmetic
    C10 discharge current2,000 Ah ÷ 10 h = 200 AArithmetic

    The OPzV2-2000 is more reliable than the OPzV2-1500 in a string sized around a fixed cell count, because it returns 2000 Ah against 1500 Ah at the same C10 test while lowering the internal resistance from approx. 0.45 mΩ to approx. 0.37 mΩ, which reduces the voltage drop and the heat generated during recharge at the same load. It is a better fit than two OPzV2-1000 cells in parallel, because one 2000 Ah cell at approx. 0.37 mΩ halves the connection count per unit of energy against two 1000 Ah cells at approx. 0.5 mΩ, and every parallel connection is a termination that has to be made, torqued, inspected and eventually maintained. The OPzV2-2000 is better suited to large stationary float duty than a comparable LFP product, because its 2.23 V float and 2.35 V equalise programme matches the installed charger hardware and the existing 48 V bus without altering the charge regime or the string architecture. The OPzV2-2000 is more reliable in service than an unspecified 2 V 2000 Ah cell, because every rating it publishes is tied to a stated condition — C10 to 1.80 V/cell at 20 °C, internal resistance measured fully charged at 25 °C, float life referenced to 20 °C — which removes the guesswork that causes premature string replacement on projects this large.

    §4 — The Framework

    Seven numbers decide whether the OPzV2-2000 belongs in a given installation. Everything else is negotiation.

    1. Capacity at a stated rate and temperature. 2000 Ah at C10 to 1.80 V/cell at 20 °C, which is a 200 A discharge for ten hours, with the published final-voltage curve from 1.90 V down to 1.60 V for duty cycles away from the ten-hour rate.
    1. Internal resistance. Approx. 0.37 mΩ per cell fully charged at 25 °C, which becomes 8.88 mΩ across a 24-cell string, and that figure is the input to cable, busbar and interconnection sizing rather than a laboratory detail.
    1. Float and equalise setpoints with compensation. 2.23 V float and 2.35 V equalise at 25 °C, with −3 mV/°C/cell temperature compensation so the charger programme is written once and then left alone through seasonal swings in the enclosure.
    1. Charge acceptance. A maximum charge current of 400 A per cell, a constant-charge characteristic of 0.15 CA to 2.40 V at 20 °C, and a 9,600 A ceiling across a 24-cell string — the values to compare against the rectifier output of the installation.
    1. Discharge and fault duty. A maximum discharge current of 3000 A at the 5S rate and an 8300 A short circuit current, which set the DC bus breaker rating, the fuse coordination and the protection study for the battery enclosure.
    1. Mechanical, logistics and structural envelope. 399 × 212 × 807 mm printed dimensions with a 772 mm container height and 108 mm / 110 mm / 110 mm terminal spacing, 145 kg per cell, and a 24-cell string total of 3,480 kg — which determines floor loading, aisle width, the lifting plan, the pallet configuration and the container loading plan.
    1. Environmental window and self-discharge. Discharge from −40 °C to +65 °C, charge from −30 °C to +65 °C, storage from −25 °C to +45 °C, and self discharge of approx. 2 % per month at 20 °C, which together determine standby behaviour, seasonal outage handling and the storage regime for a site that is not permanently attended.

    §5 — The Trust

    A market with dense, well-written datasheets rewards buyers who verify rather than accept. The verification traps are well known to anyone who has bought stationary cells at this scale across several suppliers.

    • Capacity without a condition. Ask for the rate, the end voltage and the temperature. If the reply is only “2000 Ah”, the cell has not been specified.
    • Lifetime without an ambient. Require the stated temperature. 20+ years at 20 °C is the published claim; a figure quoted for another ambient is a different claim and a different risk.
    • Dimensions without the drawing. Printed dimensions, a 772 mm container height and an 807 mm total height are three different measurements, and the 212 × 399 mm top view with the 108 mm and 110 mm terminal spacing is what actually fixes the rack.
    • Internal resistance quoted without conditions. Ask whether it is measured fully charged and at what temperature, because approx. 0.37 mΩ at 25 °C is a specific number and not a generic one.
    • Setpoints quoted as a range. A float programme should arrive as a value, a compensation coefficient and a measurement point — 2.23 V at 25 °C with −3 mV/°C/cell — not as a band.
    • Standards listed without documents. Names printed on a brochure are not certificates. Request the accredited certificate numbers, the issuing bodies and the expiry dates, plus the UL file reference for the Recognized Component listing.
    • Certification scope overstated. A RU (UL Recognized Component) mark applies to the component, not to a finished storage system or installation; final listing and field evaluation remain the integrator’s responsibility under the local code.
    • Freight and port assumptions left open. Confirm the port of loading (Shanghai, Ningbo or Shenzhen) and the nominated port of discharge (Rotterdam, Antwerp, Jebel Ali, Singapore, Durban, Santos or Long Beach), who carries the freight cost, the container loading plan for 145 kg cells, and whether the shipment is a full container of cells or a break-bulk consignment.

    On documentation, the OPzV2-2000 is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, and the manufacturing operation holds ISO 9001, ISO 14001 and GB/T 28001 / OHSAS 18001:2007. The practical step is to ask for the documents behind those marks — accredited certificate numbers and validity dates, the UL file reference and the IEC 60896-21 test report — because that is the only part of a quality claim a buyer can audit. For a European project the DIN 40472 and IEC 60896-21 conformity is what satisfies the local installer; for a North American project the UL file reference is what the authority having jurisdiction will ask for; for a Chinese or South-East Asian utility the YD/T 1360 route is the one that matches local procurement practice. Production base in Hangzhou with loading typically through the ports of Shanghai and Ningbo means a buyer can also request the factory address, the loading port and the container marking in writing before the vessel is booked, and can compare those documents across more than one source rather than relying on a single reply.

    §6 — FAQ

    Q1. What does the model code OPzV2-2000 mean, and what type of cell is it? It identifies a sealed tubular-plate gel stationary lead-acid cell. The OPzV series follows the tubular-plate construction defined in DIN 40472, the trailing 2 is the 2 V nominal cell voltage, and 2000 is the nominal capacity in ampere-hours. The electrolyte is gelled in a thixotropic silica suspension rather than held as free liquid, which is what makes the cell maintenance-free, spill-proof and suitable for an enclosure without ventilation plenum design.

    Q2. How is the 2000 Ah rated, and what discharge rate should a string be sized against? The 2000 Ah figure is published at C10 to 1.80 V/cell at 20 °C, which is a 200 A discharge for ten hours. Sizing must be done against the real discharge profile using the closest published rate and against the end voltage the installed rectifier can support at the end of a deep discharge, and the datasheet gives the final voltage recommended for each discharge band from below 0.05 C through to 2 C.

    Q3. Does the 20+ year design life apply at my site’s ambient temperature? The published figure is 20+ years of floating life at 20 °C, and the same temperature is stated for the self-discharge rate of approx. 2 % per month. Float life falls as ambient temperature rises, so an enclosure that regularly exceeds 20 °C needs a derating calculation. Ask the supplier to state the assumed ambient, the float voltage programme and the expected number of discharges, and to confirm the basis on which the 20+ year claim is made.

    Q4. What float and equalise voltages should the charger be programmed to? The datasheet specifies 2.23 V float and 2.35 V equalise at 25 °C, with temperature compensation of −3 mV/°C/cell. That compensation figure is what keeps the cell on its float curve through seasonal swings, and it is the parameter most often left out of a quotation. A gel cell with no compensation fitted will overcharge in summer and undercharge in winter, which shows up as water loss in the cell and a shortened service life.

    Q5. Why choose one 2000 Ah cell instead of two 1000 Ah cells in parallel? One 2000 Ah cell at approx. 0.37 mΩ replaces two 1000 Ah cells at approx. 0.5 mΩ for the same energy, which halves the number of parallel terminations and therefore the number of joints to make, torque, inspect and maintain. Mass energy density is effectively the same — 27.6 Wh/kg against 27.3 Wh/kg — so the gain is in connection count, handling and footprint rather than in chemistry.

    Q6. What are the physical dimensions, weight and terminal torque? Printed dimensions are 399 × 212 × 807 mm, with a 772 mm container height and an 807 mm total height on the drawing, and terminal centres 108 mm across the width and 110 mm and 110 mm along the length. Weight is approximately 145 kg per cell, so a 24-cell string is 3,480 kg. Terminals are 20 mm OD with an M8 thread, 7 mm depth and a female copper insert M8, tightened to 10–12 N·m.

    Q7. How does a gel cell behave differently from a flooded cell in a large standby string? A gel cell does not need periodic water topping, does not need a ventilated enclosure for hydrogen escape and does not spill, which removes both the maintenance visit and the floor-loading monitoring. In exchange, the gel cell carries a higher internal resistance than a comparable flooded cell at the same capacity and is more sensitive to overcharging, so the charger programme and the compensation coefficient matter more, not less.

    Q8. Which standards and certifications apply, and what should I request as evidence? The cell is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989, with ISO 9001, ISO 14001 and GB/T 28001 / OHSAS 18001:2007 held by the manufacturing operation and a RU (UL Recognized Component) marking on the cell. Request the accredited certificate numbers and expiry dates, the UL file reference and the IEC 60896-21 test report rather than a summary of them, and ask which of those documents apply to the specific cells in the shipment rather than to the manufacturer as a whole.

    Expert Summary

    The OPzV2-2000 is a 2 V, 2000 Ah sealed tubular-plate gel stationary cell whose decisive published figures are unusually complete: 2000 Ah at C10 to 1.80 V/cell at 20 °C, internal resistance of approx. 0.37 mΩ fully charged at 25 °C, a designed floating life of 20+ years at 20 °C, a 2.23 V float and 2.35 V equalise at 25 °C with −3 mV/°C/cell compensation, 400 A maximum charge current, 3000 A maximum discharge at the 5S rate, an 8300 A short circuit current, self discharge of approx. 2 % per month at 20 °C, and an ambient window of −40 °C to +65 °C on discharge. Mechanically it occupies 399 × 212 × 807 mm at approximately 145 kg, with 20 mm OD M8 female insert terminals tightened to 10–12 N·m. In a 24-cell 48 V configuration those figures become 96 kWh nominal, 8.88 mΩ of string resistance, a 9,600 A charge ceiling and 3,480 kg of cells, at 27.6 Wh/kg of mass energy density. It is built to IEC 60896-21/22, DIN 40472, IEC 61427, YD/T 1360, the Eurobat long-life guide, BS 6290 part 4 and UL 1989. Specification decisions should be made against those published conditions, and the supplier should be required to answer in the same form.

    Contact CHISEN — 24-Hour Response

    CHISEN replies to technical and commercial enquiries within 24 hours.

    To receive a quotation and a matching datasheet, send:

    • Your application — utility or grid-scale storage, large DC backup, telecom central office or substation — and the required string architecture or bus voltage
    • Required capacity per cell, the discharge profile and the target end voltage, or the total kWh and autonomy the design must deliver
    • Cell quantity, cabinet dimensions or the available footprint, the floor loading limit and the ambient temperature range of the enclosure
    • Destination port, container loading requirements, delivery window and any tender or drawing documentation your client requires

    Email: sales@chisen.cn

    WhatsApp: +86 131 6622 6999

    Call: +86 131 6622 6999

    Related reading: OPzV2-2000 2V2000Ah model page · OPzV2-1500 2V1500Ah tubular gel cell · OPzV tubular gel battery range

    Technical enquiries, project drawings and tender documents: leadacidbattery.cn

    Related CHISEN Buyer Guides

  • OPzV2-420 2V420Ah Tubular Gel Battery for Telecom & UPS

    OPzV2-420 2V420Ah Tubular Gel Battery for Telecom & UPS

    Answer First

    The OPzV2-420 2V420Ah is a 2 V, 420 Ah (C10) sealed tubular gel cell for float and shallow-cycle duty: 145 × 206 × 471 mm, 506 mm over terminals, 31.5 kg, 2.23 V float and 2.35 V equalise per cell, 84 A maximum charge current, at least 1,500 cycles at 80 % depth of discharge and a 20-plus-year float design life at 20 °C. It is the default answer for a battery room that nobody will visit quarterly — no watering, no spill containment, no hydrogen ventilation requirement, and a capacity that a single 54-cell string carries as 45.4 kWh nominal at 108 V.

    The number that decides the string is the ten-hour rate. 420 Ah at C10 to 1.80 V per cell is a materially different cell from a 420 Ah twenty-hour rating, and a plant specified on the twenty-hour basis will come up short in a real discharge test.

    Key Takeaways

    1. Sealed gel means no service visits for electrolyte. The OPzV2-420 2V420Ah arrives with electrolyte immobilised in a gel matrix inside a sealed case. There is no water top-up, no density reading and no hydrogen ventilation duty.
    2. 420 Ah at C10. A 54-cell string holds 54 × 2 V × 420 Ah = 45.4 kWh nominal; 108 cells hold 90.7 kWh. At a 50 % depth of discharge the usable energy is roughly half of that after end-point and loss corrections.
    3. Charge current is capped at 84 A per cell. That is 0.2 C10. A 54-cell string can absorb up to 4,536 A, so the rectifier, not the battery, decides how fast the string recovers.
    4. Float current is 2.1 A per cell. At 5 mA per amp-hour, one OPzV2-420 2V420Ah draws 2.1 A on float; 54 cells draw 113 A continuously for the life of the plant.
    5. Two fields stop the gel advantage. Above roughly 35 °C ambient the cell shortens its own life, and partial-state-of-charge cycling still consumes the published cycle budget. Gel buys you maintenance-free siting, not immunity from heat.

    §1 — OPzV2-420 2V420Ah Quick Specifications Table

    ParameterOPzV2-420 2V420Ah published valueWhy it matters in a string
    Nominal voltage2 V per cell24 cells give 48 V, 54 cells give 108 V, 108 cells give 216 V
    Rated capacity420 Ah at C10 (10-hour rate)Sets usable energy for a short-duration discharge
    Dimensions (L × W × H)145 × 206 × 471 mmShorter than the 645 mm flooded cell in the same capacity class
    Total height over terminals506 mmInclude 40–60 mm clearance for the terminal area and lifting
    Weight31.5 kg per cell (69.5 lbs)A 54-cell string weighs 1,701 kg before racks and interconnects
    TerminalΦ20-M8, torque 10–12 N·mInterconnect sizing follows the bolt, not the current
    TechnologyTubular gel VRLA, sealedNo watering, no spill containment, no hydrogen extraction
    Float voltage2.23 V per cell at 25 °C (datasheet float; 2.27 V solar/wind setting)54 cells give 120.42 V at the busbar at 25 °C
    Equalise voltage2.35 V per cell at 25 °C (2.40 V solar/wind regulation)Equalisation is controlled and less aggressive than flooded
    Temperature compensation−3 mV/°C/cell float (datasheet; solar/wind settings list −3 to −5 mV)A 35 °C room needs about 0.03 V less per cell
    Maximum charging current84 A per cell (0.2 C10)A 54-cell string can absorb up to 4,536 A
    Cycle life≥1,500 cycles at 80 % depth of dischargeConfirms suitability for partial-state-of-charge work
    Float design life20+ years at 20 °C (datasheet)Roughly halves for every 10 °C above 20 °C
    Discharge temperature−40 °C to 65 °CCold is not the constraint; heat is
    Charge temperature−30 °C to 65 °CWide charging window helps in cold climates
    Storage temperature−25 °C to 45 °CStore cool, then recharge before installation
    Internal resistance0.62 mΩ fully charged at 25 °CSets the voltage drop under high-current discharge
    CertificationsIEC 60896-21/22, IEC 61427, DIN 40472, GB/T 19638.1, YD/T 1360, Eurobat Long Life, BS 6290-4, UL 1989Arranged per customer requirement

    §2 — The Pain

    The hard DC rooms — telecom power rooms under a viaduct, signalling cabinets at a remote junction, a metro auxiliary room, a containerised hybrid site in a desert — share the same constraint. Someone has to service them, and nobody wants to be that someone. A flooded cell in that room means water, a torch, a density meter, a spill tray and a site visit every quarter. That visit is the expensive part: travel, access, permit, isolation and a two-person crew, four times a year, for twenty years.

    The second pain is what happens when the service does not happen. A flooded string in an unattended room loses water, the density drifts, the terminal corrodes, and the first sign of trouble is a capacity test failure that happens to coincide with a storm. The same room on gel has no water to lose and no corrosion chemistry in the electrolyte, so the failure mode moves to something predictable — heat at the cell and the loss of capacity with time — which can be managed with a ventilation design and a monitoring plan.

    The third pain is the one that appears in the tender document. Capacity is quoted as a single number. A 420 Ah cell can be rated at C10, at C20, at C3 or at 100 hours, and each of those describes a different physical cell. Two suppliers quoting “420 Ah” can deliver cells that differ by a quarter in usable energy for the same application, and the difference only appears in the acceptance test.

    §3 — The Choice

    Tubular gel sits between flooded tubular and sealed AGM. It gives up the lowest cost per stored kilowatt-hour of the flooded option, and it gives up some of the AGM option’s cycle tolerance, in exchange for removing the service regime entirely.

    Selection metricOPzV2-420 2V420Ah (tubular gel)Flooded tubular OPzS2 equivalentSealed AGM VRLA equivalent
    Rated capacity basis420 Ah at C10500 Ah at C10 in the next larger step12 V blocks, 100–250 Ah at C10
    Float voltage per cell2.23 V2.23 V2.27 V
    Equalise voltage per cell2.35 V2.35 V2.35 V
    Maximum charging current84 A per cell (0.2 C10)0.2 C10 per cell0.25 C10
    Internal resistance0.62 mΩ at 25 °C0.60 mΩ for the 600 Ah flooded cellNot published on the model page
    Cycle life at 80 % DoD≥1,500 cycles1,500–2,500 cyclesNot published on the model page
    Float design life20+ years at 20 °C20+ years at 20 °C12 years at 20 °C
    Discharge temperature range−40 °C to 65 °C−40 °C to 60 °C−20 °C to 60 °C
    Service actions per yearVisual inspection and terminal cleaning; no wateringDensity checks and topping up, typically quarterlyVisual inspection and terminal cleaning; no watering
    Hydrogen ventilationNot required for normal float operationRequiredNot required for normal float operation
    Cell mass31.5 kg, sealed caseHeaviest per stored kWh, filled with liquid electrolyteHeaviest per stored kWh for the same energy, thicker case
    Failure mode in the fieldCapacity loss with time and heatWater loss, corrosion, density stratificationHeat build-up, capacity loss

    Every figure in the table comes from published CHISEN data for the respective chemistry; where a value is not published it is marked rather than estimated. The commercial comparison follows from the physical one: a gel string stores its energy in fewer cells, needs no service visits, and can be sited inside a building without an acid-resistant floor, a drip tray or a ventilation study. The flooded option still wins when the room has a trained technician on site every quarter, because the cell is cheaper per amp-hour and tolerates a wider discharge temperature window.

    The wider gel range, from 100 Ah to 3,000 Ah in 2 V cells, is listed on the OPzV tubular gel battery hub, with individual model datasheets for sizing.

    The seven-year arithmetic decides more orders than the datasheet does. Using illustrative unit prices that you must replace with your own landed and labour rates, the table below compares one 108 V, 45.4 kWh string built three ways. Every rate in it is a planning placeholder, not a quotation.

    7-year TCO, 108 V / 45.4 kWh stringOPzV2-420 2V420Ah gel, 54 cellsFlooded OPzS2-600, 54 cellsSealed AGM VRLA, 9 × 12 V blocks
    Assumed unit price$260 per OPzV2-420 2V420Ah cell$310 per flooded cell$810 per 12 V block
    Cell or block purchase$14,040 (54 cells)$16,740 (54 cells)$7,290 (9 blocks)
    Series interconnects at assumed $45 per joint (53 joints derived)$2,385$2,385$2,385
    Service visits, 2 per year over 7 years$3,640 at $260 per visit$7,280 at $520 per visit$3,640 at $260 per visit
    Hydrogen ventilation design and ductwork$0$12,000$0
    Spare stock held on site$260, one OPzV2-420 2V420Ah$310, one flooded cell$810, one 12 V block
    Published float life at 20 °C20+ years for the OPzV2-420 2V420Ah20+ years12 years
    7-year total (illustrative)$20,325$38,715$14,125
    Difference versus the OPzV2-420 2V420Ah—≈$18,390 higher≈$6,200 lower, then a second purchase in year 12

    The result is not subtle. A flooded string of 54 cells carries a 20-plus-year float life and still costs roughly $18,390 more over seven years than the same string of OPzV2-420 2V420Ah gel cells, because the room, the ventilation path and the twice-yearly site visit are most of the cost. The sealed AGM option looks lowest on the seven-year invoice, and then its 12-year published float life turns it into a second purchase in year 12 — which is exactly why the OPzV2-420 2V420Ah is specified for rooms that must still be on float in year 15. Where the room has a trained technician on site every quarter, the flooded option is the correct economic answer; where it does not, the 20-plus-year float design life at 20 °C is what the buyer is actually paying for.

    §4 — The Framework

    Write the rate and the end-point into the specification. 420 Ah at C10 to 1.80 V per cell is the controlling figure for the OPzV2-420 2V420Ah. Anything less precise than that is an invitation to a 20 % argument at acceptance.

    Decide the string voltage before the cell count. 48 V is 24 cells, 108 V is 54 cells and 216 V is 108 cells. With 54 cells at 2.23 V float, the busbar sits at 120.42 V at 25 °C, and the rectifier’s float set point has to be adjusted for the room temperature.

    Check the rectifier against the 84 A per-cell ceiling. A 54-cell string can take 4,536 A into the battery. If the site’s rectifier is limited to the load plus a margin, the string recovers slowly after an outage, and a gel cell left in a partially discharged state is exactly where the cycle budget is spent.

    Design the thermal environment. The published discharge range reaches 65 °C, but float life is quoted at 20 °C. Above 35 °C ambient, plan for cooling or accept the temperature derating, and keep the cells away from direct sun on a container wall.

    Set the ventilation rule. Gel does not need hydrogen extraction at float, but it does produce gas during equalisation and at high charge voltages, and a sealed room with an aggressive equalisation schedule still needs a deliberate air path. Specify it and you avoid an inspection finding.

    Plan the monitoring around what gel cannot tell you. No density reading means no early warning from the electrolyte, so the substitute is voltage and internal-resistance trending on the string plus a defined inspection interval with thermal imaging of terminals and busbars.

    Fix the spare strategy. In a room that is hard to reach, the spare philosophy changes: instead of holding a percentage of float stock, hold one complete parallel string, because the whole point of gel is that you can swap it during a scheduled visit rather than troubleshoot a cell in a degraded string.

    §5 — The Trust

    Gel removes the maintenance that would have told you about a problem. That is an advantage and a risk, and the risk is handled in the contract.

    First, the acceptance record. Ask for the incoming inspection, the manufacturer’s date of manufacture, the charge voltage and duration before dispatch, the conductance or internal-resistance reading for every cell, and a voltage-spread check across the assembled string. Without cell-level data at handover, a failure eighteen months later has no baseline to be measured against, and the vendor and the installer end up arguing about which reading was wrong.

    Second, the commissioning regime. A gel cell shipped with a partial charge and installed without a proper initial charge can fail early. Specify the initial charge method, the charge duration, the end-point voltage per cell, and the temperature-compensated set points used for the first 30 days. Record the readings.

    Third, the warranty terms. A twenty-year float life is a statement about the cell under a defined regime: 20 °C, voltage compensated, equalisation scheduled, and depth of discharge kept inside the published band. Ask the supplier to put those conditions in the warranty wording. If a warranty is written without temperature and maintenance conditions, it is worth very little at year eight.

    Finally, watch the published data for internal consistency, as you would for any datasheet. Every specification in the table above comes from the model page, and the certification set on the gel line is assembled per customer requirement, which means the certificate list on the packing list is the document that counts. Ask for the certificates with the delivery, not after it.

    §6 — FAQ

    Q1. What is the rated capacity of the OPzV2-420 2V420Ah and at what rate? 420 Ah at the ten-hour rate (C10) to 1.80 V per cell at 25 °C. A twenty-hour rating is a different cell, and ordering on the wrong basis is the most common sizing error in this category.

    Q2. Does the OPzV2-420 2V420Ah need electrolyte topping up? No. It is a sealed tubular gel VRLA cell with the electrolyte immobilised in a gel matrix, so there is no water to add, no density to read and no spill containment required.

    Q3. How many cells are needed for a 108 V DC system? 54 cells of 2 V. A 48 V system uses 24 cells and a 216 V system uses 108. At 2.23 V float per cell, a 54-cell string sits at 120.42 V at 25 °C.

    Q4. What is the maximum charging current? 84 A per cell, which is 0.2 C10. A 54-cell string can absorb up to 4,536 A, so the rectifier limits and the site protection scheme must be designed around that figure.

    Q5. How many cycles can it deliver at 80 % depth of discharge? At least 1,500 cycles at 80 % depth of discharge, and it tolerates partial-state-of-charge operation better than a flooded cell, which is why it is common in hybrid telecom and renewable-assisted sites.

    Q6. Does the cell need hydrogen ventilation? Not for normal float operation, because the electrolyte is immobilised and recombination limits gas release. Air exchange should still be provided for equalisation and for high-temperature charging, and for the general comfort of technicians working in the room.

    Q7. What happens if the room is hot? Float life is quoted at 20 °C and shortens with temperature, as an engineering rule of thumb roughly halving for every 10 °C above that. Above 35 °C the cell will still operate within its published discharge range, but the 20-year figure no longer applies and the site needs cooling or a revised expectation.

    Q8. What is the float current? At 5 mA per amp-hour, the OPzV2-420 2V420Ah draws 2.1 A per cell on float, so 113 A for a 54-cell string, continuously, for the life of the installation.

    Q9. Which certifications are available? IEC 60896-21/22, IEC 61427, DIN 40472, GB/T 19638.1, YD/T 1360, Eurobat Long Life, BS 6290-4 and UL 1989, assembled per customer requirement, together with RoHS, REACH and WEEE documentation for the destination market.

    Q10. How do I get a sizing sheet and a quotation? Send the string voltage, the DC load in kW, the required autonomy, the minimum end-point voltage, the highest expected room temperature and the delivery port — Shanghai, Ningbo, Mumbai, Jebel Ali, Santos, Rotterdam, Hamburg, Valencia, Mersin, Chattogram, Mombasa, Tema and Dar es Salaam are all reachable on the same terms — and we return a cell count, an energy budget and a float-current figure within one working day.

    Expert Summary

    The OPzV2-420 2V420Ah is a 2 V, 420 Ah C10 sealed tubular gel cell published at 145 × 206 × 471 mm, 506 mm over terminals and 31.5 kg, with 2.23 V float, 2.35 V equalise, −3 mV per °C per cell float compensation, 84 A maximum charge current, 0.62 mΩ internal resistance, at least 1,500 cycles at 80 % depth of discharge and a 20-plus-year float design life at 20 °C. A 54-cell string carries 45.4 kWh nominal at 108 V and 108 cells carry 90.7 kWh. The cell earns its place wherever the room cannot be serviced: no watering, no density readings, no spill containment, no hydrogen extraction at float, and a tolerance for partial-state-of-charge cycling that a flooded cell does not offer. Three things still decide the outcome. The rate basis must be written as 420 Ah at C10 to 1.80 V per cell, because a twenty-hour figure describes a different cell and produces a 20 % shortfall at acceptance. The charge path must be sized to the published 84 A per-cell limit, since a 54-cell string can absorb 4,536 A and a rectifier sized for the load alone leaves the string chronically undercharged. And the thermal environment must be designed, because float life is quoted at 20 °C and roughly halves for every 10 °C above it. Gel removes the service regime, not the discipline: specify the initial charge, the cell-level conductance and voltage-spread baseline, the temperature-compensated set points and the warranty conditions, or the absence of maintenance will simply move the failure to a point where there is no data to diagnose it.

    Contact CHISEN — 24-Hour Response

    Send us the string voltage, the DC load in kW, the autonomy in hours, the minimum end-point voltage, the highest expected room temperature and the delivery port, and we will return a cell count, an energy budget, a float-current figure and a charge-recommendation for the OPzV2-420 2V420Ah tubular gel cell.

    WhatsApp: https://wa.me/861316226999 Email: sales@chisen.cn Factory: 8 production bases, 70 million kVAH annual capacity, CE, ISO 9001, ISO 14001, UL and IEC certified.

    Related reading: the complete OPzV tubular gel battery range from 100 Ah to 3,000 Ah, and how CHISEN builds and certifies every cell.

    This article is published on leadacidbattery.cn.

    Related CHISEN Buyer Guides

  • OPzS2-600 2V600Ah Flooded Tubular Battery: 108-V DC Plant Sizing for Telecom and Rail

    OPzS2-600 2V600Ah Flooded Tubular Battery: 108-V DC Plant Sizing for Telecom and Rail

    Answer First

    The OPzS2-600 2V600Ah is a 2 V, 600 Ah (C10) flooded tubular lead-acid cell built for float service: 145 × 206 × 645 mm, 700 mm over terminals, 2.23 V float and 2.35 V equalise per cell (2.40 V for solar and wind regulation), 120 A maximum charge current, 1,500–2,500 cycles at 80 % depth of discharge and a 20-plus-year float design life at 20 °C. It is the right cell when you are building a 108 V or 216 V DC string for a telecom power room, a railway signalling substation or a metro traction auxiliary feed, and it is the wrong cell when the room is unreachable, when space is the constraint, or when nobody will ever top up electrolyte.

    One number decides most projects: 600 Ah at the ten-hour rate. A 54-cell string of OPzS2-600 2V600Ah cells holds 54 × 2 V × 600 Ah = 64.8 kWh of nominal energy, and a 108-cell string holds 129.6 kWh. That is roughly four to six hours of backup for a 20–25 kW telecom DC load at 50 % depth of discharge, which is where most of these installations actually sit.

    Key Takeaways

    1. Rated 600 Ah at C10, not C20. The OPzS2-600 2V600Ah reaches 600 Ah when discharged over ten hours to 1.80 V per cell. A buyer who reads 600 Ah as a twenty-hour figure will size the string roughly 20 % short for a short-duration duty.
    2. 108 V means 54 cells, 216 V means 108 cells. Every string voltage is a cell count multiplied by 2 V: 24 cells for 48 V, 54 cells for 108 V, 108 cells for 216 V.
    3. String charge current is capped by the cell, not by the rectifier. Each OPzS2-600 2V600Ah cell accepts 120 A maximum; a 54-cell string therefore pulls up to 6,480 A of charging current, and the rectifier must be sized for that or the string will never recover capacity after a deep discharge.
    4. Float current is 3.0 A per cell. At 5 mA per amp-hour, one cell draws 3.0 A on float. Over a 54-cell string that is 162 A of continuous float draw that the generator or PV array has to carry for the life of the plant.
    5. The maintenance burden is the real differentiator. Flooded tubular cells need periodic electrolyte checks, specific-gravity readings and topping up, and a ventilated room. If the site cannot be visited quarterly, gel is the correct choice even at a higher price per amp-hour.

    §1 — OPzS2-600 2V600Ah Quick Specifications Table

    ParameterOPzS2-600 2V600Ah published valueWhy it matters in a string
    Nominal voltage2 V per cell54 cells give 108 V, 108 cells give 216 V
    OPzS2-600 rated capacity600 Ah at C10, to 1.80 V/cellDefines usable energy at a 6-hour-plus discharge
    OPzS2-600 dimensions (L × W × H)145 × 206 × 645 mmSets rack pitch and room length for a 54-cell string
    OPzS2-600 cell weight32.0 kg without electrolyte; 42.8 kg with electrolyte (10.8 kg acid)Floor loading, lifting and freight cost for a 54-cell string
    OPzS2-600 height over terminals700 mmInclude 50–80 mm clearance above terminals for ventilation
    OPzS2-600 terminalΦ20-M8, torque 10–12 N·m (Φ16-M6 and Φ24-M10 options)Interconnect cable sizing follows the bolt size, not the current
    TechnologyFlooded tubular lead-acidElectrolyte is visible; the cell needs periodic topping up
    Float voltage2.23 V/cell at 25 °C (datasheet float; 2.25 V float setting for solar)54 × 2.23 V = 120.42 V at the busbar at 25 °C
    Equalise voltage2.35 V/cell at 25 °C (2.40 V for solar and wind regulation)Equalisation is a controlled weekly or bi-weekly event
    Temperature compensation−3 mV/°C/cell float (datasheet); the solar settings table lists −4 mV/°C/cellA 40 °C room cuts float voltage by roughly 0.045 V per cell
    Maximum charging current120 A per cellA 54-cell string can demand up to 6,480 A on recharge
    Cycle life1,500–2,500 cycles at 80 % DoD; 2,500–4,000 at 50 % DoD; 4,500–6,500 at 30 % DoDDepth of discharge, not age, drives replacement
    Float design life20+ years at 20 °C (datasheet)Halves roughly for every 10 °C above 20 °C
    Discharge temperature−40 °C to 60 °CCold cranking is not the limit; charging is
    Charge temperature−30 °C to 55 °CBelow −30 °C the cell will not accept charge
    Storage temperature−25 °C to 45 °CA cell stored hot and shipped to a cool site needs re-equalising
    Internal resistance0.60 mΩ fully charged at 25 °CSets the voltage drop under high-current discharge
    Short-circuit current3,700 A per cellPlan fusing and touch protection on every string
    Electrolyte specific gravity1.24 ± 0.01 g/cm³ fully chargedThe reference point for every field density check
    CertificationsIEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4, UL 1989Covers the stationary, telecom and export markets

    §2 — The Pain

    A DC plant fails in one of two ways, and both start long before the batteries are visibly old.

    The first is a string that was sized for nominal energy instead of usable energy. A 54-cell string of OPzS2-600 2V600Ah cells delivers 64.8 kWh nominal, but at 50 % depth of discharge and a 2.00 V/cell end-point the bank gives you closer to 24–26 kWh of usable energy at the load terminals once you subtract float-current losses, cable drop and cell temperature. If the tender documents only quote 600 Ah and 108 V, two suppliers can bid 15 % apart and both be honest.

    The second is a string that cannot recharge. The OPzS2-600 2V600Ah accepts 120 A per cell on charge, and the common failure in the field is a rectifier sized for the load rather than for the battery. A 54-cell string of OPzS2-600 2V600Ah cells that has been deeply discharged needs thousands of amps to recover in the time the generator is available, and a cell that is never fully recovered ages for reasons that have nothing to do with its age. Short the recharge and the cell sulphates, capacity falls, float voltage sags, the end cells age first, and within three years you are replacing cells in a string that was specified for twenty.

    There is a third, quieter problem: the language of the page you are reading. Many of these cells are sold with a single capacity number and no rate basis. The same 600 Ah label is quoted at the ten-hour rate by some suppliers and the twenty-hour rate by others, and the difference shows up as a 10–15 % shortfall in a real discharge test.

    §3 — The Choice

    Once the duty is float-dominant and the room is accessible, flooded tubular is hard to beat on cost per stored kilowatt-hour. When the room is not accessible, or the site is hot, or the space is tight, gel or sealed VRLA wins even though the cell costs more per amp-hour.

    Selection metricOPzS2-600 2V600Ah (flooded tubular)Tubular gel OPzV2 equivalentSealed AGM VRLA equivalent
    Rated capacity basis600 Ah at C10500 Ah at C10 in the next larger step12 V blocks, 100–250 Ah at C10
    Float voltage per cell2.23 V2.23 V2.27 V
    Equalise voltage per cell2.35 V2.35 V2.35 V
    Maximum charging current120 A per cell (0.2 C10)0.2 C10 per cell0.25 C10
    Cycle life at 80 % DoD1,500–2,500 cycles≥1,500 cyclesNot published on the model page
    Float design life20+ years at 20 °C20+ years at 20 °C12 years at 20 °C
    Discharge temperature range−40 °C to 60 °C−40 °C to 65 °C−20 °C to 60 °C
    Service actions per yearElectrolyte density checks and topping up, typically quarterlyVisual inspection and cleaning, no wateringVisual inspection and cleaning, no watering
    Installation requirementVentilated room, spill containmentSealed, no spill, no ventilation for hydrogenSealed, no spill, no ventilation for hydrogen
    Cell mass per stored kWhLowest of the three, because the plastic case is a tubeModerateHigh, because of the thicker case and more lead
    Field failure modeWater loss, terminal corrosion, density stratificationOvercharge heat at high ambient, loss of capacityThermal runaway from poor cooling, loss of capacity

    The table above is built from published CHISEN data for each chemistry; where a figure is not published it is marked as such rather than estimated. The commercial conclusion is physical rather than financial. A flooded OPzS2-600 2V600Ah string of 54 cells stores 64.8 kWh nominal in about 11.2 m³ of rack volume including interconnects and clearances, while a sealed string of the same energy needs materially more case volume and heavier handling gear. Where a power room has to be built inside an existing building, that difference decides the design.

    For the wider flooded tubular range, the OPzS series is published from 100 Ah up to 3,000 Ah, with a shared platform, terminal standard and case footprint, so a plant can be built from one supplier with one set of spares and one maintenance procedure. The OPzS flooded tubular battery hub lists the full range and the model datasheets.

    §4 — The Framework

    Fix the rate basis before the capacity. Write 600 Ah at C10 to 1.80 V/cell into the specification and require the supplier to state the rate on the datasheet. Capacity quoted without a rate and an end-point voltage is not a number you can order against.

    Count cells, not volts. A 108 V DC system is 54 cells of 2 V. A 216 V system is 108 cells. Ask for the cell count per string, the string count and the end-point voltage, then check that the arithmetic delivers the autonomy you need at 50 % depth of discharge rather than at the nameplate.

    Check the charge path against the published 120 A. Multiply the rectifier’s current limit by the number of strings and compare it with the recovery time you need after a full discharge. If the recharge window is four hours for a 54-cell string, the rectifier must be able to deliver close to 6,480 A into that string, which is 120 A for every OPzS2-600 2V600Ah cell. Most site faults are rectifier faults, not cell faults.

    Design the room for the cell, not for the battery. At 700 mm over terminals, a 54-cell string on a two-tier rack needs roughly 1.6 m of wall length, floor loading for the full weight of the filled cells, a clear maintenance aisle in front of every tier, and ventilation sized for hydrogen from the cells under equalisation charge.

    Budget the maintenance visits. A flooded cell loses water through electrolysis and evaporation. Quarterly visits for density readings, topping up, terminal cleaning and torque checks are the minimum, and the cost of those visits belongs in the ten-year comparison, not just the cell price.

    Set the temperature compensation rule. At −3 mV per °C per cell, a room that sits at 35 °C needs roughly 0.03 V less per cell than a 25 °C room. Put the compensation in the rectifier settings and re-check it after every seasonal change.

    Demand the data trail. Ask for the incoming inspection report, the initial charge record, the first specific-gravity readings at 30, 90 and 180 days, and the annual density trend. Without that trail, a warranty claim on a twenty-year asset becomes an argument about who held the data.

    §5 — The Trust

    There are three things a buyer should check before signing, and one of them is on the supplier’s own website.

    The first is the consistency of the published datasheet. The product page for the OPzS2-600 2V600Ah carries the dimensions 145 × 206 × 645 mm with a total height of 700 mm in the specification table, while a later section of the same page repeats 103 × 206 × 409 mm and a 12.6 kg cell weight, and the FAQ section repeats 145 × 206 × 700 mm. Those three statements do not agree. A 600 Ah flooded tubular cell of this format is a large, heavy piece of equipment, and a 12.6 kg figure is not credible for the OPzS2-600 2V600Ah. Treat the specification table as the controlling document, and have weight and dimensions confirmed in writing on a signed CHISEN spec sheet before the shipping calculation, the rack design and the floor loading check are frozen. This is exactly the kind of small documentation defect that destroys a project schedule six months later.

    The second is the equalisation procedure. Equalising a flooded string at 2.35 V per cell, or 2.40 V in solar and wind regulation, raises cell temperature and produces hydrogen. A room that cannot remove that gas cannot be equalised safely, and a string that is never equalised develops capacity spread until the weakest cell drags the busbar down. Define the equalisation interval in the maintenance contract, the gas removal rate in the room design, and who signs off the density readings.

    The third is the acceptance test. Require a discharge test on the delivered string to the agreed end-point voltage at the agreed rate, with the initial specific gravities and cell voltages recorded cell by cell. A string that passes at the factory and fails at site is usually a transport, connection or temperature problem, and it is much easier to diagnose with the acceptance data in hand.

    One more caution on comparisons: some suppliers publish a single 600 Ah number for a smaller cell than the OPzS2-600 2V600Ah, or quote cycle life figures measured at 30 % depth of discharge and present them as 80 % figures. Compare on the same rate basis, the same depth of discharge and the same temperature.

    §6 — FAQ

    Q1. What is the rated capacity of the OPzS2-600 2V600Ah, and at what rate? 600 Ah at the ten-hour rate (C10), measured to an end-point of 1.80 V per cell at 25 °C. If you need 600 Ah at a twenty-hour rate, this cell does not deliver it, and the string must be sized accordingly.

    Q2. How many cells make a 108 V DC system? 54 cells of 2 V. A 48 V system uses 24 cells and a 216 V system uses 108 cells. The float busbar voltage at 25 °C is 120.42 V for a 54-cell string at 2.23 V per cell.

    Q3. What charge current does the cell accept? 120 A maximum per cell, which is 0.2 C10. A 54-cell string can therefore accept up to 6,480 A. Size the rectifier for that or accept a slow recharge after a deep discharge.

    Q4. Does the OPzS2-600 2V600Ah need electrolyte topping up? Yes. It is a flooded cell with a transparent case, so electrolyte level, specific gravity and stratification are visible and must be inspected periodically, typically quarterly.

    Q5. How long does the float life last? The published float design life is 20+ years at 20 °C. As an engineering rule of thumb, float life is roughly halved for every 10 °C above 20 °C, so a 30 °C room should be planned at around 12–13 years, and that assumption belongs in the tender document.

    Q6. What cycle life should I expect at 80 % depth of discharge? 1,500–2,500 cycles at 80 % depth of discharge, 2,500–4,000 cycles at 50 %, and 4,500–6,500 cycles at 30 %. Float service in a DC plant is much gentler than cycling, so the 20-year float figure dominates in telecom and signalling applications.

    Q7. Can I use the cell at high ambient temperature? Discharge is rated from −40 °C to 60 °C and charging from −30 °C to 55 °C, but float life shortens with temperature, so the room cooling design is part of the battery specification.

    Q8. What happens if the string is deeply discharged and recharge is too slow? The cell sulphates, capacity and internal resistance drift, and the end cells age first. The published 120 A maximum charge current is the threshold above which the cell cannot take charge cleanly, and the internal resistance of 0.60 mΩ rises as the cell ages.

    Q9. Which certifications can be supplied? IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4 and UL 1989, with RoHS, REACH and WEEE handled in the destination market.

    Q10. How do I request a sizing sheet and a quotation? Send the string voltage, the load in kW, the required autonomy in hours, the minimum end-point voltage, the room temperature and the delivery port — Shanghai, Ningbo, Jebel Ali, Santos, Rotterdam, Hamburg, Valencia, Mersin, Chattogram, Mombasa or Tema all have the same operating logic, and we reply with a cell count, an energy budget and a float-current figure within one working day.

    Expert Summary

    The OPzS2-600 2V600Ah is a 2 V, 600 Ah C10 flooded tubular cell for float duty, published at 145 × 206 × 645 mm and 700 mm over terminals, with 2.23 V float and 2.35 V equalise per cell (2.40 V for solar and wind regulation), 120 A maximum charge current, 3.0 A float current per cell, 0.60 mΩ internal resistance, 32.0 kg without electrolyte and 42.8 kg with electrolyte, a 20-plus-year float life at 20 °C and 1,500–2,500 cycles at 80 % depth of discharge. A 54-cell string holds 64.8 kWh nominal and a 108-cell string 129.6 kWh. Three decisions define the installation: the capacity rate basis, which must be written as C10 to 1.80 V/cell rather than a bare amp-hour figure; the charge path, where the 120 A per-cell limit means a 54-cell string can demand 6,480 A and the rectifier must be sized accordingly; and the maintenance regime, because a flooded cell needs quarterly density checks, topping up and terminal service in a ventilated room. Where the room is accessible, flooded tubular wins on cost per stored kilowatt-hour and on the number of cells a rack can hold. Where the room is unreachable or the space is constrained, sealed gel or AGM is the correct answer even at a higher price per amp-hour, because the 20-year float life only materialises with the temperature compensation, the ventilation and the inspection regime that the float service assumes. Buyers should also require the signed datasheet: the published product page carries three conflicting dimension and weight statements; the datasheet values are 145 × 206 × 645 mm with 700 mm over terminals, 32.0 kg without electrolyte and 42.8 kg with electrolyte (10.8 kg of acid), and those datasheet figures should be confirmed in writing before the rack, the floor loading and the shipping plan are fixed.

    Contact CHISEN — 24-Hour Response

    Send us the string voltage, the DC load in kW, the required autonomy, the minimum end-point voltage, the room temperature and the delivery port, and we will return a cell count, an energy budget, a float-current figure and a string charging recommendation for the OPzS2-600 2V600Ah flooded tubular cell.

    WhatsApp: https://wa.me/861316226999 Email: sales@chisen.cn Factory: 8 production bases, 70 million kVAH annual capacity, CE, ISO 9001, ISO 14001, UL and IEC certified.

    Related reading: the full OPzS flooded tubular battery range from 100 Ah to 3,000 Ah, and how CHISEN builds and certifies every cell.

    This article is published on leadacidbattery.cn.

    Related CHISEN Buyer Guides

  • OPzS2-3000 2V3000Ah Flooded Tubular Battery: Utility DC Strings Built Like Power-Plant Hardware

    OPzS2-3000 2V3000Ah Flooded Tubular Battery: Utility DC Strings Built Like Power-Plant Hardware

    Answer First

    The OPzS2-3000 2V3000Ah is a 2 V, 3,000 Ah nominal flooded tubular lead-acid cell rated at the 10-hour rate (C10, 1.80 V per cell cut-off), published at 576 × 212 × 771 mm with 826 mm height over terminals, a Φ20-M8 bolt terminal torqued to 10–12 N·m, float voltage 2.23 V per cell at 25 °C, equalise 2.35 V per cell, temperature compensation of −3 mV per °C per cell, maximum charging current 600 A, an internal resistance of approximately 0.24 mΩ, and a designed floating life of 20+ years at 20 °C. Each cell weighs 155 kg without electrolyte and 218 kg with it. Treat it as a power-plant component, not a battery box: one 108-cell string delivers 648 kWh nominal at 216 V DC, and every procurement decision — string architecture, floor loading, ventilation, float current, inspection regime, end-of-life capacity spread — follows from that single fact.

    Key Takeaways

    • String energy is the unit of purchase. 54 cells × 2 V × 3,000 Ah = 324 kWh; 108 cells = 648 kWh; 190 cells = 1,140 kWh. A 108-cell string of the OPzS2-3000 2V3000Ah carries roughly 600 kW of float-regulated standby capacity behind 107 interconnect joints, versus more than 200 joints and twice the cell count if the same duty is split into 1,500 Ah cells on two parallel strings.
    • Mega cells move cost from cells into the room. Fewer strings means fewer racks, fewer busbar runs, fewer monitoring channels, fewer points of human error during installation — and a structural floor that must be designed for the concentrated mass rather than for scattered small units.
    • Float current is a design load, not a rounding error. At the conventional 5 mA per Ah float rule, a 3,000 Ah cell draws roughly 15 A (derived). Across a 108-cell string that is about 3.6 kW of continuous float power and a charger that must absorb 600 A per cell at the published maximum charging current.
    • Flooded means flooded. Vented electrolyte means hydrogen evolution, a designed ventilation path, periodic watering, specific-gravity inspection, and a battery room rather than a sealed cabinet — unless the same duty is met with a containerised arrangement where the environment can be conditioned.
    • The published record is specific and worth reading closely. IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4 and UL 1989 are listed; the published page does not state cell weight, so any floor-loading calculation must start with a confirmed weight from the supplier rather than an assumption.

    §1 — OPzS2-3000 2V3000Ah Quick Specifications Table

    Each row states its source. Datasheet is the manufacturer specification sheet for the OPzS2-3000 and is the authority for weights, voltages, compensation and designed life. Model page is the published CHISEN product page. Arithmetic rows show the derivation in the cell.

    ParameterOPzS2-3000 2V3000Ah published valueNote
    Nominal voltage2 V (DC)Published
    Nominal capacity3,000 AhPublished
    Capacity test basisC10 (10-hour rate, 1.80 V/cell cut-off)Published
    Cell technologyOPzS2-3000 tubular flooded vented lead-acid (OPzS), die-cast tubular positive plate with low-antimony alloy, lead-calcium pasted negative platePublished
    ElectrolyteLiquid dilute sulfuric acid, 1.24 ± 0.01 g/cm³ fully chargedPublished
    ContainerTransparent SAN plastic with explosion-proof filter vent plugPublished
    Length × width × height576 × 212 × 771 mmModel page
    Height over terminals826 mmDatasheet
    Cell weight without electrolyte155 kg (342 lbs)Datasheet
    Cell weight with electrolyte218 kg (481 lbs)Datasheet
    Electrolyte (acid) weight63 kgDatasheet
    Internal resistance≈0.24 mΩ (fully charged at 20 °C)Datasheet
    Terminal typeΦ20-M8 bolt terminal (Φ16-M6 and Φ24-M10 offered for OEM configurations)Model page
    Terminal torque10–12 N·mDatasheet
    Float voltage2.23 V/cell at 25 °CDatasheet
    Float temperature compensation−3 mV/°C/cellDatasheet
    Equalise voltage2.35 V/cell at 25 °CDatasheet
    Equalise temperature compensation−4 mV/°C/cell in the solar and wind settingsDatasheet
    Solar and wind application settingsFloat 2.25 ± 0.005 V/cell, equalise 2.40 ± 0.01 V/cell at 25 °C, compensation −4 mV/°C/cellDatasheet
    Maximum charging current600 ADatasheet
    OPzS2-3000 cycle life at 80% DoD1,500–2,500 cyclesModel page
    OPzS2-3000 cycle life at 50% DoD2,500–4,000 cyclesModel page
    OPzS2-3000 cycle life at 30% DoD4,500–6,500 cyclesModel page
    OPzS2-3000 designed floating life20+ years at 20 °CDatasheet
    Discharge temperature range−25 °C to 65 °CDatasheet
    Charge temperature range−20 °C to 65 °CDatasheet
    Storage temperature range−15 °C to 40 °CDatasheet
    StandardsIEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life (>12 years float), BS 6290 Part 4, UL 1989Published
    Transport classificationIMDG Class 8, UN2794, MSDS providedPublished
    OPzS2-3000 string energy, 54 cells324 kWh (derived: 54 × 2 V × 3,000 Ah)Arithmetic
    OPzS2-3000 string energy, 108 cells648 kWh (derived: 108 × 2 V × 3,000 Ah)Arithmetic
    OPzS2-3000 string energy, 190 cells1,140 kWh (derived: 190 × 2 V × 3,000 Ah)Arithmetic
    OPzS2-3000 float current per cell≈15 A (derived: 5 mA/Ah × 3,000 Ah)Arithmetic, conventional float rule
    OPzS2-3000 float power, 108-cell string≈3.6 kW (derived: 108 × 2.23 V × 15 A)Arithmetic
    OPzS2-3000 string mass, 54 cells, dry≈8.4 t (derived: 54 × 155 kg)Arithmetic
    OPzS2-3000 string mass, 54 cells, with electrolyte≈11.8 t (derived: 54 × 218 kg)Arithmetic
    OPzS2-3000 string mass, 108 cells, dry≈16.7 t (derived: 108 × 155 kg)Arithmetic
    OPzS2-3000 cell footprint0.122 m² (derived: 0.576 m × 0.212 m)Arithmetic

    Published specifications, certificates and the model page for the OPzS2-3000 2V3000Ah are available at OPzS2-3000 2V3000Ah model page. The wider flooded tubular range, including smaller frame sizes on the same OPzS platform, is listed at OPzS flooded tubular battery series.

    §2 — The Pain

    The failure mode in large DC installations is not the cell. It is the string, the room, and the paperwork around the room.

    The OPzS2-3000 is a power-plant component: 576 mm long, 212 mm wide, 771 mm of body and 826 mm over the terminals, with a Φ20-M8 terminal torqued to 10–12 N·m and a published maximum charging current of 600 A. Engineers who have spent their careers with 12 V blocks or with 100 Ah VRLA units tend to mis-size the surrounding system when they first see a cell like this. The physics is the same; the scale is not.

    Three pain points recur. First, string count. A 324 kWh duty built from 54-cell strings needs two strings where a 648 kWh string needs one, and every additional string multiplies interconnects, rack tiers, busbar terminations, monitoring channels and the number of joints somebody has to torque correctly at commissioning. Second, floor loading and battery-room design. The concentrated mass of a 108-cell string of 3,000 Ah cells has to be carried on a designed plinth with a load path, not on a slab that was sized for a handful of small units; the published model page does not state cell weight, so this number must be obtained from the supplier before any civil drawing is issued. Third, the flooded reality: vented electrolyte, hydrogen evolution on overcharge, a ventilation design governed by the applicable standard, periodic watering, and a specific-gravity inspection regime that has to be staffed for twenty years.

    The commercial consequence is that the buyer who treats the OPzS2-3000 2V3000Ah as a drop-in box ends up paying twice — once for the cells, and again for the room, the string design and the service contract that the cell format demands.

    §3 — The Choice

    The real alternative is not lead-acid versus lithium. In most of the markets where this cell is specified — telecom power rooms in Mumbai and Karachi, port substations at Jebel Ali and Port Said, containerised renewables at Santos and Callao, harbour cranes and rail traction auxiliaries at Chattogram, Mombasa, Durban and Dar es Salaam — the real alternative is the same chemistry arranged differently: one large cell versus many smaller ones on the same OPzS platform.

    For the same 648 kWh DC duty, the arithmetic is stark.

    Comparison, 648 kWh DC dutyOption A: 108 × OPzS2-3000 (3,000 Ah)Option B: 2 × 108-cell strings of 1,500 Ah cells
    Cells per duty108216
    Strings12
    Series interconnects per string107 (derived: n−1)107 per string, 214 total (derived)
    String voltage / capacity216 V DC / 3,000 Ah216 V DC / 1,500 Ah per string, two in parallel
    Nominal energy648 kWh (derived)648 kWh (derived)
    Float current per cell≈15 A (derived: 5 mA/Ah × 3,000 Ah)≈7.5 A (derived: 5 mA/Ah × 1,500 Ah)
    Float power per string≈3.6 kW (derived: 108 × 2.23 V × 15 A)≈1.8 kW per string, ≈3.6 kW total (derived)
    Monitoring channels to instrument108 cell taps216 cell taps
    Failure granularity1 cell = 0.93% of duty (derived: 1/108)1 cell = 0.46% of duty (derived: 1/216)
    Cells to service for watering and SG checks108216

    The mega cell wins on joints, rack tiers, floor area per kWh and monitoring complexity. It loses on failure granularity: one cell out of 108 is nearly 1% of the duty, so end-of-life capacity spread and cell-to-cell matching have to be managed deliberately rather than left to average out across 216 units. It also demands a bigger charger and a bigger structural plinth. Neither option is free.

    15-year TCO, 648 kWh DC dutyOption A: 108 × OPzS2-3000 (3,000 Ah)Option B: 216 × 1,500 Ah
    Initial cell cost (assumed $420 vs $250 per cell — replace with quoted landed price)$45,360$54,000
    Installation labor at assumed $45 per series joint (derived joint counts above)$4,815$9,630
    Monitoring channels at assumed $85 per channel$9,180$18,360
    15-year inspection labor at 2 visits/yr, $5 per cell per visit (assumed)$16,200$32,400
    15-year total (illustrative)$75,555$114,390
    Difference≈$38,835 lower (≈34%)—

    Every rate in that TCO table is an explicit planning placeholder, not a quotation: the cell cost, the joint rate, the channel rate and the inspection rate must be replaced with your own landed and labor numbers before the table goes into a business case. The structural point holds regardless of the rates. Labor and monitoring scale with cell count and joint count; cells installed per kWh does not improve when you subdivide the string. That is the argument for the OPzS2-3000 2V3000Ah in any installation where the battery room has to be staffed for the life of the plant.

    The second comparison is against valve-regulated and sealed chemistries on the same duty.

    Selection driverOPzS2-3000 2V3000Ah (flooded tubular)Conventional VRLA / AGMComparable LFP products
    Float life at 20 °C20+ years published at 20 °CCommonly 5–12 years depending on design and temperatureCommonly 10–15 years calendar, dependent on BMS and thermal design
    Cycle life at 80% DoD1,500–2,500 cycles publishedTypically lower for deep discharge at this scaleTypically 2,000–6,000 cycles at 80% DoD
    Hydrogen / gas managementRequired; ventilation designed per standardMinimal; sealed caseNone in normal operation
    Watering and SG inspectionRequired, recurringNot requiredNot required
    Cell-level field replacementLarge single unit, heavy liftSmall unitModule-level, BMS dependent
    Cost per kWh installedLowest of the three for 20-year float dutyMidHighest
    Thermal sensitivityWide published range: discharge −40 to 60 °C, charge −30 to 55 °CNarrower in practiceNarrow operating band without climate control

    For a rail traction auxiliary application or a utility-scale renewable plant where the same DC bus is fed by an inverter and the battery sits at the base of a turbine or a substation, the flooded cell’s 20-plus-year float life and its tolerance of a wide temperature band usually decide the question. In a containerised installation, the ventilation and watering regime can be handled inside the enclosure — which is exactly why containerised versus room installation has to be decided early rather than at the shipping date.

    §4 — The Framework

    Seven criteria decide whether the OPzS2-3000 2V3000Ah belongs in your project. Apply them in this order.

    1. String architecture before cell count. Fix the DC bus voltage first — 108 V, 216 V, 384 V or 480 V — and then the string energy: 54 cells at 324 kWh, 108 at 648 kWh, 190 at 1,140 kWh. Buying the cell before fixing the string is how buyers end up with a set of cells that cannot be arranged into a clean string architecture. The published OPzS range covers the frame sizes around the 3,000 Ah cell if a different string energy is required.

    2. Physical and structural envelope. 576 × 212 × 771 mm, 826 mm over terminals, 155 kg per cell without electrolyte and 218 kg with it. Confirm rack pitch, aisle width, door clearances and the lifting route for a single cell before the plinth is poured. Cell weight is not published on the model page, so obtain the certified weight per cell and confirm the floor loading and the seismic restraint arrangement with a structural engineer. Do not substitute a guess.

    3. Charge acceptance and charger sizing. Maximum charging current 600 A per cell is published. That number dictates the rectifier size, the busbar cross-section and the cable derating for the equalise scenario, not just the float scenario. It also dictates the equalise window you can actually run at 2.35 V per cell, or 2.40 V per cell in the solar and wind settings.

    4. Thermal and float regulation. Float 2.23 V per cell at 25 °C with −3 mV/°C/cell compensation, equalise 2.35 V per cell, with −4 mV/°C/cell compensation in the solar and wind settings. Verify the charger you are pairing supports both, and verify the compensation slope matches the published values. Mismatched compensation is the most common cause of early capacity loss in flooded installations and it is entirely avoidable.

    5. Ventilation and hydrogen. Vented cells evolve hydrogen on overcharge. A first-order worst case using Faraday’s law at 25 °C is roughly 0.46 L of hydrogen per hour per amp of charging current per cell; at the derived 15 A float current per 3,000 Ah cell that is about 6.9 L/h per cell, or roughly 740 L/h across a 108-cell string before any allowance for oxygen recombination. Treat that as an order-of-magnitude design check, then design ventilation to the applicable standard rather than to the estimate. The key operating rule is to keep the float and equalise programme inside the ventilation envelope, not to ventilate for an equalise event.

    6. Service regime and end-of-life behaviour. Electrolyte is liquid, with published specific gravity of 1.24 ± 0.01 g/cm³ fully charged. That means watering intervals, specific-gravity readings, temperature-compensated readings and a written inspection record are part of the asset, not optional extras. Ask for the end-of-life capacity spread the cell is warranted to and for the cell-to-cell matching data shipped with the batch. Ask for it as a certificate, because it is the only evidence that the 108 cells you receive were matched when they were made.

    7. Evidence and service life. The published compliance set — IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4, UL 1989, plus IMDG Class 8 and UN2794 transport classification — is the minimum paper pack you should require, together with a factory weight and a type-test report. CHISEN’s manufacturing and quality background is described at CHISEN company profile. If a supplier cannot produce that pack for a 3,000 Ah cell, the plant will not produce it for you either.

    §5 — The Trust

    Most procurement disputes in this category do not start with chemistry. They start with documentation that was never requested, and end with a battery room that cannot prove what was installed.

    The capacity rating is not a usable capacity rating. The published 3,000 Ah is a C10 figure at 1.80 V per cell cut-off, measured on new cells at 25 °C. Your DC duty may be a 30-minute duty, a one-hour duty, or a continuous float duty. Ask the supplier for discharge curves at your actual duty cycle and your actual end-voltage, and ask how the cell performs at the low end of the published charge range of −20 °C to 65 °C. A 3,000 Ah cell that delivers less than rated capacity at 0 °C is normal chemistry, not a defect — but it must be priced into the design, not discovered in year three.

    Cell weight is published. The manufacturer datasheet gives 155 kg per cell without electrolyte (342 lbs) and 218 kg with electrolyte (481 lbs), with 63 kg of acid per cell. A 108-cell string is therefore roughly 16.7 t of dry cells and about 23.5 t filled, which is what sizes the plinth and the floor loading. Internal resistance is approximately 0.24 mΩ fully charged at 20 °C. Confirm the filled mass against your own delivered batch before the rack is ordered.

    Matching certificates are the real warranty. With a mega cell, one unit out of 108 carries nearly 1% of the duty (derived). At end of life, capacity spread across the string is what determines whether the string can carry its load, so the batch-level matching data, the cell-to-cell voltage and specific-gravity records at delivery, and the acceptance test protocol should all be contractual deliverables. Without them, a warranty claim becomes an argument about which cell was weak, and you will lose that argument without data.

    Ventilation is a compliance item, not an engineering nicety. Vented electrolyte plus a 600 A maximum charging current means hydrogen is a permanent feature of the room. The published discharge and charge temperature ranges are wide, and in a hot climate a battery room without forced ventilation will run at the top of the charge range. Design the room for the worst case, not the average case.

    Containerised versus room installation. Containerised installation concentrates the problem: a sealed enclosure holding flooded cells needs a controlled atmosphere, spill containment, and access for watering and SG inspection — and a 108-cell string still weighs what it weighs. Room installation spreads the load and gives natural ventilation. Neither is a default choice; both need a structural and HVAC input from a firm that has actually built a flooded room at this scale.

    The written record matters for the plant’s whole life. Keep the delivery record, the torque record at commissioning (10–12 N·m on a Φ20-M8 terminal), the electrolyte level and SG readings, the equalise log, the ventilation commissioning record, and the string voltage trends. Twenty years of float life is only meaningful if the asset is monitored. Ask for the monitoring and recording regime, the protocol for a single-cell replacement in the middle of a string, and the local service response in the country where the battery actually stands — Lagos/Apapa, Tema, Mombasa, Durban, Jebel Ali, Karachi, Chattogram, Santos, Callao, Port Said, Valencia, Hamburg, Rotterdam, Gdansk, Mersin, Manila, Jakarta, Ho Chi Minh.

    Two traps worth naming. First, the OPzS flooded platform and the OPzV gel platform are not interchangeable in the string: gel is valve-regulated and needs no watering, flooded needs watering and inspection, and the float/equalise programmes differ. Specify the platform, not just the amp-hour rating. Second, a cell is not a battery. A 3,000 Ah cell with a transparent SAN container is a component that arrives as part of a string with busbars, racks, insulators, torque hardware, drainage, spill containment and a charger. Contracts written around “3,000 Ah cells, 108 off” that omit the string hardware and the room scope are the single most common source of variation in landed cost on this product.

    §6 — FAQ

    Q1. What is the OPzS2-3000 2V3000Ah rated capacity and how is it measured? 3,000 Ah nominal at the C10 rate — the 10-hour rate with a 1.80 V per cell cut-off — on a 2 V cell. Published by CHISEN on the model page. Any usable-capacity claim for your duty cycle needs the supplier’s discharge curves.

    Q2. How much energy is one string of these cells? 54 cells × 2 V × 3,000 Ah = 324 kWh; 108 cells = 648 kWh; 190 cells = 1,140 kWh (derived from the published 2 V / 3,000 Ah rating). At 108 cells the string is 216 V DC at 3,000 Ah, which is the usual starting point for a 216 V DC utility bus.

    Q3. What are the physical dimensions and the installation footprint? 576 × 212 × 771 mm per cell, 826 mm over terminals (published). Cell footprint is 0.122 m² (derived). For 108 cells on a single tier that is about 13 m² of cell footprint before aisles, access and the busbar zone; plan the room from the rack layout, not from the cell footprint alone.

    Q4. What is the float and equalise voltage, and does temperature compensation matter? Float 2.23 V per cell at 25 °C with −3 mV/°C/cell compensation; equalise 2.35 V per cell at 25 °C, with −4 mV/°C/cell compensation in the solar and wind settings (published). Verify your charger implements both slopes. Wrong compensation is the most common preventable cause of early capacity loss.

    Q5. How much float current does a cell draw, and what does that do to the charger? At the conventional 5 mA per Ah float rule, a 3,000 Ah cell draws about 15 A (derived), which is roughly 3.6 kW across a 108-cell string at 2.23 V per cell. The published maximum charging current is 600 A per cell, and that figure — not the float figure — sizes your rectifier, busbars and cables.

    Q6. Does a flooded 3,000 Ah cell need ventilation? Yes. Vented cells evolve hydrogen on overcharge; a first-order Faraday estimate is about 0.46 L/h per amp of charging current per cell at 25 °C, or roughly 740 L/h across a 108-cell string at 15 A float current per cell, before any recombination credit. Design to the applicable standard, not to the estimate, and keep the equalise programme inside the ventilation envelope.

    Q7. How often do these cells need watering and inspection? They need it; the interval depends on temperature, discharge depth and charging regime. The electrolyte is liquid with a published specific gravity of 1.24 ± 0.01 g/cm³ fully charged, so temperature-compensated SG readings are the measurement that matters. A 108-cell string of 3,000 Ah cells means fewer watering events per unit of capacity than 216 smaller cells, but each event involves handling a much larger volume.

    Q8. What is the float life and the cycle life? Float life 20+ years at 20 °C (published) — the same datasheet’s temperature-versus-float-life curve gives roughly 15–16 years at 25 °C, so 20 °C is the condition to design to. Cycle life 1,500–2,500 cycles at 80% DoD, 2,500–4,000 at 50% DoD, 4,500–6,500 at 30% DoD (published). Float life assumes float service at 25 °C with correct compensation and a maintained inspection regime.

    Q9. Which certifications and transport approvals are available? IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4 and UL 1989, with IMDG Class 8, UN2794 and MSDS for transport (published). Pre-shipment inspection reports from SGS, TUV, BV and CTI are available, as are destination-country certifications such as SONCAP, PVOC, SASO, BIS and ESMA on request.

    Q10. Is this suitable for rail traction auxiliary or utility-scale renewable duty? Yes, where the duty is float-dominated with occasional deep discharge. The 1,500–2,500 published cycles at 80% DoD suit auxiliary and backup duty rather than traction propulsion duty, and the wide published temperature range helps in unconditioned plant rooms from Ho Chi Minh to Rotterdam. For utility-scale renewables paired with an inverter, size on the DC duty cycle and confirm the discharge curve at your actual end-voltage.

    Expert Summary

    The OPzS2-3000 2V3000Ah is a 2 V, 3,000 Ah flooded tubular lead-acid cell rated at C10 with a 1.80 V per cell cut-off, measuring 576 × 212 × 771 mm with 826 mm over terminals, using a Φ20-M8 terminal torqued to 10–12 N·m, floating at 2.23 V per cell at 25 °C with −3 mV/°C/cell compensation, equalising at 2.35 V per cell with −4 mV/°C/cell compensation in the solar and wind settings, accepting a published maximum charging current of 600 A, delivering 1,500–2,500 cycles at 80% DoD and a designed floating life of 20-plus years at 20 °C. Its significance is architectural: 54 cells give 324 kWh, 108 cells give 648 kWh and 190 cells give 1,140 kWh (derived), so a 3,000 Ah cell should be engineered as a power-plant component. One 108-cell string carries the duty with 107 series interconnects against 214 for two parallel 1,500 Ah strings, 108 monitoring channels against 216, and roughly 34% lower illustrative 15-year cost when labor, monitoring and inspection are counted — but it concentrates failure granularity to 0.93% of duty per cell, so batch matching data, certified cell weight, a designed plinth, hydrogen ventilation sized for a permanent float load, and a twenty-year inspection and watering regime are not optional. Full published specifications sit on the model page; comparable frame sizes cover adjacent string energies in the OPzS flooded range.

    Contact CHISEN — 24-Hour Response

    Send us the following and we will return a sizing sheet within one business day: your DC bus voltage, the load in kW, backup autonomy in hours or minutes, the duty cycle (float only, or float plus deep discharge), the number of parallel strings, the installation environment (room or container, indoor or outdoor, ambient temperature range), the ventilation standard you work to, and the destination port or city — Shanghai, Ningbo, Mumbai, Jebel Ali, Santos, Karachi, Mombasa, Rotterdam or otherwise. We will return the string architecture, the cell count, the charger sizing against the published 600 A maximum charging current, the floor-loading and ventilation preliminary note, the certification pack, and a landed-cost basis you can put next to your own numbers.

    For further technical pages and application guides, visit leadacidbattery.cn.

    Related CHISEN Buyer Guides

  • 6-DMF-38 12V38Ah VRLA Battery for Electric Rickshaw Fleets

    6-DMF-38 12V38Ah VRLA Battery for Electric Rickshaw Fleets

    Answer First

    The 6-DMF-38 12V38Ah is a 12 V sealed VRLA battery rated 38 Ah at the three-hour rate: 224 × 106 × 175 mm, 10.45 ± 0.2 kg, φ9.8-M5 terminals, 13.5 V float and 14.1 V equalise, 350–600 cycles at 50–80 % depth of discharge and a 2–5 year float life within a −15 °C to 50 °C operating range. It is the pack that most electric rickshaw and light tricycle fleets land on, and it is chosen for one reason above all others: 456 Wh of energy in a sealed case that needs no watering and no ventilation design.

    Two numbers decide whether it is the right pack. The first is the rate basis — 38 Ah at C3, not at C20 — which means the 6-DMF-38 12V38Ah delivers its rating over a three-hour discharge, close to the length of a working shift rather than a long haul. The second is that 350–600 published cycles is the entire budget: a fleet that runs two deep shifts a day from the same pack will consume it in under a year, while a fleet on one shift with a mid-day swap will get more from it.

    Key Takeaways

    1. 38 Ah at C3, which is 456 Wh per pack. A 12 V × 38 Ah pack holds 456 Wh; a 20 Ah pack holds 240 Wh and a 52 Ah pack holds 624 Wh. Pack energy, not the amp-hour label, is what determines range.
    2. Sealed VRLA means no watering. The 6-DMF-38 12V38Ah is a sealed case with immobilised electrolyte, so routine service is limited to terminal cleaning, torque checks and a visual inspection.
    3. Charge at 13.5 V float and 14.1 V equalise. In a hot climate those two set points drive the case temperature, and a charger with no thermal compensation will shorten the life of the pack.
    4. The published cycle band is 350–600 cycles at 50–80 % depth of discharge. That band, not the calendar, is the replacement trigger. Budget pack replacement on the cycle count and the shift pattern together.
    5. Float life is 2–5 years, which is normal for this class. It is a traction-class duty, not a stationary float duty, and a fleet that parks the vehicle for weeks should put the pack on a maintenance charger rather than assume the vehicle charger will hold it.

    §1 — 6-DMF-38 12V38Ah Quick Specifications Table

    Parameter6-DMF-38 12V38Ah published valueWhy it matters in a fleet
    Nominal voltage12 VDirectly matches the vehicle’s 12 V bus and controller
    Rated capacity38 Ah at the 3-hour rate (C3)A shift-length discharge, not a standby rating
    Stored energy456 Wh per pack (12 V × 38 Ah)The figure that decides range, not the amp-hour label
    Dimensions (L × W × H)224 × 106 × 175 mmFits a standard battery tray of a light tricycle
    Weight10.45 ± 0.2 kgOne pack per vehicle adds 10.45 kg of dead mass
    Terminalφ9.8-M5Sets the cable lug and the connector for the 38 Ah pack
    TechnologySealed VRLA (AGM / gel)No water top-up, no venting plug, no spill tray
    Float charge voltage13.5 VThe resting voltage a charger should hold
    Equalise charge voltage14.1 VUsed only on a full charge after a deep discharge
    Cycle life350–600 cycles at 50–80 % depth of dischargeThe replacement trigger for the pack
    Float life2–5 years design lifeApplies to standby storage, not to daily cycling
    Operating temperature−15 °C to 50 °CHot climates cost cycles; cold climates cost range
    CertificationsCE, RoHS, REACH, MSDS, IMDGCovers export, transport and EU market access
    Series range6-DZF-12, 6-DZF-20, 6-DMF-21/22/23/24, 6-DMF-32/35/38/40/45/52/58, 6-FD-72, 6-FD-75Same 12 V sealed VRLA technology and the same 13.5 V float setting, but the published case dimensions differ across the range, so each capacity needs its own tray and hold-down
    Pack combinations2 in series gives 24 V at 38 Ah; 3 in series gives 36 V at 38 AhLets one cell type cover 24 V and 36 V platforms

    §2 — The Pain

    Fleet economics on light electric mobility are decided by pack replacement, and pack replacement is decided by two numbers: how deep the pack is discharged on a shift, and how often it is charged.

    The published cycle band for the 6-DMF-38 12V38Ah is 350–600 cycles at 50–80 % depth of discharge. At two deep shifts a day from the same pack, that budget is exhausted in roughly six to nine months. At one shift a day with an opportunity charge at midday, the same pack lasts considerably longer because each discharge is shallower. Both patterns are normal across the markets where these vehicles run — Mumbai and Ho Chi Minh city fleets run two shifts, Lagos and Jakarta single-shift operations with charging at the depot — and the difference has to be priced before the purchase order, not discovered in the maintenance log.

    The second pain is that the pack and the charger are specified separately. A charger set to 14.4 V continuous with no thermal compensation will cook a sealed pack in a 45 °C depot. The published equalise voltage is 14.1 V, and a good charger should hold 13.5 V float and apply 14.1 V only briefly, at the end of a full charge, with the current tapering as the voltage rises.

    The third pain is documentation. Fleet operators buy on the “38 Ah” label, but the label means 38 Ah at C3. At C20 the same physical pack delivers considerably less, and at C10 less still. For a duty measured in hours, C3 is the relevant number, and the operator should confirm the rating basis on the datasheet and verify it with a discharge test on the first incoming batch.

    §3 — The Choice

    The 6-DMF range covers 32, 38 and 52 Ah, but the published cases are not one platform: the 6-DMF-38 measures 224 x 106 x 175 mm and the 6-DMF-52 measures 224 x 135 x 175 mm, while the 6-DMF-32 measures 267 x 78 x 170 mm. Capacity choice is therefore also a tray and hold-down decision, and each case needs its own tray.

    Selection metric6-DMF-38 12V38Ah6-DZF-20 12V20Ah6-DMF-32 12V32Ah6-DMF-52 12V52Ah
    Nominal voltage12 V12 V12 V12 V
    Rated capacity (published basis)38 Ah at C320 Ah at C2 (2-hour rate)32 Ah at C352 Ah at C3
    Stored energy per pack456 Wh240 Wh384 Wh624 Wh
    Case weight10.45 ± 0.2 kg6.1 ± 0.2 kg9.1 ± 0.2 kg13.7 ± 0.2 kg
    Published case dimensions (L x W x H)224 x 106 x 175 mm180 x 76 x 170 mm267 x 78 x 170 mm224 x 135 x 175 mm
    Published terminalφ9.8-M5φ8.8-M5φ8.8-M5φ11.8-M6
    Published operating temperature−15 °C to 50 °C−15 °C to 50 °C−15 °C to 50 °C−15 °C to 50 °C
    Pack count for a 2,500 Wh shift (assumption)5.5 packs, so 6 packs10.4 packs, so 11 packs6.5 packs, so 7 packs4.0 packs, so 5 packs
    Pack mass for the same shift62.7 kg67.1 kg63.7 kg68.5 kg
    Published cycle band350–600 cycles at 50–80 % DoD350–600 cycles at 50–80 % DoD350–600 cycles at 50–80 % DoD350–600 cycles at 50–80 % DoD
    Float / equalise voltage13.5 V / 14.1 V13.5 V / 14.1 V13.5 V / 14.1 V13.5 V / 14.1 V
    Swapping with the rest of the fleetCompatible only with the 38 Ah tray and connectorRequires its own tray and connectorRequires its own tray and connectorRequires its own tray and connector

    The shift-energy figures in that table are arithmetic on published ratings against an assumed 2,500 Wh daily consumption, which itself must be replaced by the operator’s own measured consumption — an rickshaw carrying two passengers over 100 km a day at an assumed 25 Wh per km consumes roughly 2,500 Wh, and a loaded tricycle at 40 Wh per km consumes roughly 4,000 Wh. The choice between the 38 Ah pack and the 52 Ah pack is usually decided by payload and route rather than by price: the heavier pack adds mass that the driver feels, and it reduces the number of packs a rider has to carry in a swap operation.

    The full capacity list for the series is on the 6-DZF and 6-DMF battery hub.

    §4 — The Framework

    Measure the actual consumption before the order. Fit a meter to three vehicles of the type, log the kilowatt-hours used per shift for a fortnight, and use that number. Everything else depends on it, and it is cheaper than a mis-sized pack.

    Match the pack count to the shift, not to the range. Decide whether the vehicle carries one pack and charges at the depot, or carries two and swaps at midday. Two packs of 38 Ah per vehicle also doubles the spare stock a depot must hold.

    Check the depth of discharge discipline against the published band. The 350–600 cycle figure is quoted at 50–80 % depth of discharge. Running the pack to a deep discharge every shift shortens the pack life; a mid-shift opportunity charge extends it.

    Specify the charger, not just the battery. Charger output in amps should be around one tenth of pack capacity for a normal charge, so 4 A for a 38 Ah pack. The charger must hold 13.5 V float, limit equalise to 14.1 V with a current taper, and be temperature compensated if the depot is not climate controlled.

    Set the operating temperature expectation. The published range is −15 °C to 50 °C. Above roughly 40 °C, expect a shorter service life and a higher water loss in the vehicle’s own cooling regime; below freezing, expect reduced delivered capacity on the first shift of the day.

    Standardise the connector and the tray. The 38 Ah pack uses φ9.8-M5 terminals, but the range is not terminal-standardised: the 6-DZF-20 and the 6-DMF-32 publish φ8.8-M5 and the 6-DMF-52 publishes φ11.8-M6. The tray and the hold-down are what let a mechanic swap a pack in two minutes, so specify the tray with the vehicle build, not with the battery order.

    Write the replacement plan into the purchase. A fleet that consumes a pack every eight months needs a standing order with a fixed delivery slot, because a vehicle out of service is revenue lost and the operator cannot wait for a spot shipment to arrive through Ho Chi Minh, Jakarta, Mumbai, Lagos or Chattogram.

    §5 — The Trust

    Sealed packs fail quietly, and the failures that matter are process failures.

    The first is a charge that is never completed. A pack that is repeatedly taken to 14.4 V and left there in a 45 °C depot will lose capacity faster than the published cycle band implies. Specify the charge profile, require the charger to record the time to absorption and the ending voltage, and review those records monthly.

    The second is heat. A sealed pack in a vehicle running 100 km a day in a tropical climate sits in a battery box that may exceed ambient. Keep the pack away from the controller and the motor, use a ventilated tray, and check connector temperature during a midday charge.

    The third is the depth-of-discharge habit. Drivers who run the pack to the controller’s cut-off every shift are working at 80–100 % depth of discharge, outside the published band. A low-voltage cut-off set to 10.5 V per cell under load, rather than the manufacturer’s last-resort threshold, protects the pack and is a one-line change in the controller.

    Fourth, insist on the transport and compliance documents with the delivery: MSDS, IMDG classification for the battery, CE marking and the RoHS and REACH declarations, plus the batch or date code on the pack. The 6-DMF-38 12V38Ah carries a 2–5 year float life, and a warranty claim two years after delivery is only actionable if the date code, the batch record and the incoming inspection are on file.

    Finally, verify on delivery. Check the open-circuit voltage of the delivered packs, confirm the terminal torque on the M5 screws, and run one pack from each batch through a controlled discharge to confirm the 38 Ah at C3 rating rather than accepting the label. The 6-DMF-38 12V38Ah model page carries the full datasheet for that comparison.

    §6 — FAQ

    Q1. What is the rated capacity of the 6-DMF-38 12V38Ah and at what rate? 38 Ah at the three-hour rate (C3). A twenty-hour rating is a different cell and gives a materially smaller usable figure for shift-length duty, so the rate basis must be stated on the order.

    Q2. Is this a flooded or a sealed battery? It is sealed VRLA, with the electrolyte immobilised in an AGM or gel matrix. There is no water top-up, no density reading and no spill tray, which is what makes it practical for a vehicle or a swap station.

    Q3. How much energy does one pack hold? 12 V × 38 Ah = 456 Wh. Pack energy is the figure to plan a route with, because the amp-hour label alone ignores the voltage and the rate basis.

    Q4. What charging voltages should the charger use? 13.5 V float and 14.1 V equalise, with the equalise step applied only after a full charge and the current tapering as the voltage rises. A charger that holds 14.4 V continuously will shorten pack life in a hot depot.

    Q5. How long does the 6-DMF-38 12V38Ah last? The published cycle band is 350–600 cycles at 50–80 % depth of discharge, and the float design life is 2–5 years. On one shift a day with an opportunity charge the pack reaches the top of that band; on two deep shifts a day it will reach the bottom of it in under a year.

    Q6. Can I use two or three packs in series? Yes. Two in series give 24 V at 38 Ah and three in series give 36 V at 38 Ah, which lets one cell type cover 24 V and 36 V vehicle platforms.

    Q7. What is the operating temperature range? −15 °C to 50 °C. Cold reduces the energy delivered on the first shift of the day; sustained heat above 40 °C shortens service life.

    Q8. What certifications come with the battery? CE, RoHS, REACH, MSDS and IMDG, covering EU market access and the transport documentation for sea freight.

    Q9. Which other capacities are available in the same series? 6-DZF-12, 6-DZF-20, 6-DMF-21, 6-DMF-22, 6-DMF-23, 6-DMF-24, 6-DMF-32, 6-DMF-35, 6-DMF-38, 6-DMF-40, 6-DMF-45, 6-DMF-52, 6-DMF-58, 6-FD-72 and 6-FD-75, all 12 V sealed VRLA cells on the same 13.5 V float setting, in case formats that differ by capacity.

    Q10. How do I get a quotation and a delivery plan? Send the vehicle platform, the daily route length, the payload, the number of packs per vehicle and the depot locations with the delivery port — Shanghai, Ningbo, Ho Chi Minh, Jakarta, Manila, Mumbai, Lagos/Apapa, Karachi, Chattogram, Mombasa, Durban, Santos, Jebel Ali, Port Said, Tema or Dar es Salaam — and we will size the pack, confirm the charger profile and quote a scheduled delivery within one working day.

    Expert Summary

    The 6-DMF-38 12V38Ah is a 12 V sealed VRLA battery rated 38 Ah at C3, published at 224 × 106 × 175 mm and 10.45 ± 0.2 kg with φ9.8-M5 terminals, 13.5 V float, 14.1 V equalise, 350–600 cycles at 50–80 % depth of discharge, a 2–5 year float life and a −15 °C to 50 °C operating range. Each pack holds 456 Wh, so the fleet decision is an arithmetic one: a 100 km day at an assumed 25 Wh per km needs roughly 2,500 Wh, which is six 38 Ah packs, seven 32 Ah packs, four 52 Ah packs or eleven 20 Ah packs — and the operator’s own measured consumption, not the assumption, has to replace that number before the order is placed. Two published figures govern everything else. The rating basis is C3, a shift-length discharge, so a “38 Ah” quoted at C20 describes a different cell and produces a pack that disappoints on the first long shift. And the cycle band of 350–600 cycles at 50–80 % depth of discharge is the replacement trigger: a two-shift operation with no midday charge consumes that budget in six to nine months, while a one-shift operation with an opportunity charge stretches it, which is why the charger, the controller’s low-voltage cut-off at 10.5 V per cell under load and the battery tray belong in the same specification as the pack itself. The sealed case removes watering, density readings and spill containment, but it also removes the early warning that a flooded cell gives for free, so the substitute is a charge-recording charger, monthly review of absorption times and ending voltages, connector temperature checks in a tropical depot, and an incoming discharge test on every batch against the published C3 rating. Heat is the quiet variable: the pack operates to 50 °C, but sustained operation above 40 °C and a charger parked on 14.4 V will consume the cycle budget far faster than the datasheet suggests.

    Contact CHISEN — 24-Hour Response

    Send us the vehicle platform, the daily route length, the payload, the number of packs per vehicle and the depot locations, and we will size the pack, confirm the charger profile and quote a scheduled delivery for the 6-DMF-38 12V38Ah sealed VRLA battery.

    WhatsApp: https://wa.me/861316226999 Email: sales@chisen.cn Factory: 8 production bases, 70 million kVAH annual capacity, CE, ISO 9001, ISO 14001, UL and IEC certified.

    Related reading: the complete 6-DZF and 6-DMF battery range for 12 V mobility and stationary duty, and how CHISEN builds and certifies every cell.

    This article is published on leadacidbattery.cn.

    Related CHISEN Buyer Guides

  • OPzS2-1000 2V1000Ah: 108 V and 216 V DC Plant Sizing for Hybrid Renewable and Telecom Sites

    OPzS2-1000 2V1000Ah: 108 V and 216 V DC Plant Sizing for Hybrid Renewable and Telecom Sites

    Reading time: 12 minutes | For: DC plant managers, telecom power engineering leads, solar-plus-storage EPCs, and importers serving India, Africa, the Gulf, Southeast Asia and Latin America

    Answer First

    The OPzS2-1000 2V1000Ah is a 2 V, 1,000 amp-hour flooded tubular vented lead-acid cell rated at C10 — 100 A for 10 hours to 1.80 V per cell at 25 °C — and it is the right cell when a hybrid renewable-plus-telecom plant needs a 108 V or 216 V DC bus holding 108 kWh or 216 kWh nominal per string, and when someone on site will still refill water and read a hydrometer once a quarter.

    Five numbers decide the order:

    • 1,000 Ah at C10, not at the 20-hour rate. The published OPzS2-1000 2V1000Ah rating is 100 A for 10 hours to 1.80 V per cell at 25 °C. No 20-hour rate is published for this model.
    • 233 × 210 × 645 mm, 700 mm over terminals, 53.50 kg per cell. A 54-cell 108 V string is 2,889 kg of battery on your floor before racks, busbar and the room.
    • 200 A maximum charging current, 0.20 C10. That single limit caps the PV array a string can absorb at roughly 21.6 kW at 108 V nominal.
    • 1,500–2,500 cycles at 80% depth of discharge, 20+ years of float life at 20 °C. From the datasheet curve, float life falls to roughly 10–12 years at 30 °C and 6 years at 40 °C.
    • Float 2.23 V per cell with −3 mV/°C/cell compensation; equalisation 2.35 V per cell, or 2.40 V with −4 mV/°C/cell compensation in the solar and wind settings. The controller profile is not optional.

    The honest caveat: the OPzS2-1000 2V1000Ah is a flooded, vented, wet cell. It buys long float life and 1,500+ real cycles, and it demands a service visit once a year whether you like it or not. If the battery room is unmanned, a gel tubular cell is the more defensible choice even though it costs more mass per amp-hour. Section 3 puts the three configurations side by side with numbers.


    Key Takeaways

    1. The rating basis is the entire argument. OPzS2-1000 2V1000Ah means 1,000 Ah at C10 to 1.80 V per cell. A seller quoting “1,000 Ah at 20 hours” describes a weaker cell, and comparing the two figures is how projects end up with 25% less usable energy than the drawing promised.
    2. String voltage is a decision with a floor. 54 cells gives 108 V and 108 kWh nominal; 108 cells gives 216 V and 216 kWh. Both are standard DC plant voltages, and both mark the point where a renewable-plus-telecom hybrid stops being a backup project and becomes a power plant.
    3. Charge acceptance caps the array, not the other way round. At 200 A per cell and 108 V nominal, one string absorbs about 21.6 kW of PV before the controller hits its ceiling; everything above becomes curtailment.
    4. Flooded means a room, not a cabinet. Hydrogen venting, flame-retardant acid-proof plugs, water top-up, specific-gravity checks and quarterly equalisation are part of the product, not optional extras.
    5. The 53.50 kg cell is a logistics decision as much as an electrical one. A 54-cell string at 2,889 kg moves as project cargo out of Shanghai or Ningbo, and the same kWh delivered by 108 smaller cells changes handling, spares and service labour.

    §1 — OPzS2-1000 2V1000Ah Quick Specifications Table

    Values below come from the manufacturer specification sheets for the OPzS2-1000 and the OPzV2-1000, with model-page items marked (model page): OPzS2-1000 2V1000Ah specifications →. Where a datasheet and the model page disagree, the datasheet governs.. Where a figure is not published it is marked as such rather than estimated.

    ParameterPublished value for OPzS2-1000 2V1000Ah
    ModelOPzS2-1000
    Rated capacity1,000 Ah (C10) at 100 A to 1.80 V per cell, 20 °C
    Nominal voltage2 V DC
    Dimensions233 × 210 × 645 mm container; 700 mm overall height over terminals
    Weight53.5 kg (118 lbs) without electrolyte; 73.5 kg (162 lbs) with electrolyte; acid 20 kg
    TechnologyFlooded tubular vented lead-acid: die-cast Pb-Sb tubular positive plate, pasted lead-calcium negative plate, low-resistance PVC composite separator, high-purity low-density dilute sulfuric acid electrolyte, transparent SAN container, high-strength ABS cover
    Vent plugsAcid-proof, flame-retardant, explosion-proof; catalytic plug optional
    Terminal and torqueFemale Copper Insert M8, 10–12 N·m
    Internal resistance≈0.45 mΩ fully charged at 20 °C
    Short-circuit current4,500 A; 2,500 A for 5 s
    Self-discharge3% per month at 20–25 °C
    Float voltage2.23 V per cell at 25 °C
    Float temperature compensation−3 mV/°C/cell; float current under 5 mA/Ah
    Equalisation and cycle charge2.35 V per cell at 25 °C; solar and wind setting 2.40 V per cell with −4 mV/°C/cell compensation; equalise current ≤ 0.25 C10
    Cycle life (model page)1,500–2,500 cycles at 80% DoD; 2,500–4,000 at 50% DoD; 4,500–6,500 at 30% DoD, IEC 60896-11
    Cycle life (datasheet curve)≈1,500 cycles at 80% DoD, ≈2,300 at 60% DoD, ≈3,500 at 40% DoD, ≈6,000 at 20% DoD, ≈1,100 at 100% DoD
    Solar and wind discharge capacity at 1.85 VC24 1,130 Ah; C48 1,240 Ah; C72 1,300 Ah; C100 1,350 Ah; C120 1,370 Ah; C240 1,400 Ah
    Designed floating life20+ years at 20 °C; from the datasheet temperature-versus-float-life curve roughly 10–12 years at 30 °C, 6 years at 40 °C and 2–3 years at 50 °C
    Operating temperatureDischarge −25 °C to 65 °C; charge −20 °C to 65 °C; storage −15 °C to 40 °C; optimum 20–25 °C
    Capacity at the 10-hour rate108% at 40 °C; 100% at 25 °C; 85% at 0 °C; 65% at −15 °C
    AltitudeNormal to 3,000 m; above 3,000 m derate 8% per 1,000 m; above 5,000 m special customisation
    Solar controller setpointsFloat 2.25 ± 0.005 V; equalise 2.40 ± 0.01 V; over-voltage disconnect 2.47 ± 0.01 V; array reconnect 2.23 ± 0.005 V; low-voltage alarm 1.95 ± 0.005 V; low-voltage disconnect 1.90 ± 0.005 V; load reconnect 2.09 ± 0.01 V; compensation −4 mV/°C/cell
    StandardsIEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4, UL 1989
    Transport and complianceIMDG Class 8, UN2794, MSDS, RoHS, REACH, WEEE; third-party inspection on demand via SGS, TUV, BV, CTI, SONCAP, PVOC, SASO, BIS, ESMA

    The published multi-rate table on the model page is a range-level reference curve, not a model-specific curve; for the OPzS2-1000 the governing figure is C10 = 1,000 Ah, and no 20-hour rate is published.


    §2 — The Pain

    A 1,000 Ah flooded tubular OPzS2-1000 cell is the point where a hybrid renewable-plus-telecom plant stops being a telecom project and becomes a power plant, with zero fuel cost and a maintenance calendar attached.

    The first pain is arithmetic that arrives late. A 108 V DC bus at 1,000 Ah per cell is 108 kWh nominal, 86 kWh at an 80% DoD limit; 108 cells give 216 kWh. Teams that treat the battery as a line item discover in week six that an OPzS2-1000 string needs 2,889 kg of floor loading, a ventilation path and spill containment.

    The second pain is the charge acceptance ceiling, and it quietly caps the whole project. The published maximum charging current for the OPzS2-1000 2V1000Ah is 200 A, or 0.20 C10, so an array sized on the load rather than on the battery is an array the battery cannot absorb. At 108 V nominal, 200 A is 21.6 kW, which makes a 200 kW array on a 108 V DC bus an engineering error. The excess goes into float losses or into the 2.47 V per cell over-voltage disconnect at 133.38 V, which trips the inverter out.

    The third pain is that a flooded string is a living plant with a service contract attached: equalisation every 30 to 60 days, specific gravity against the acceptance certificate, water topped up, hydrogen vented. On sites near Mombasa, Durban, Apapa, Chattogram or Karachi, where ambient temperatures run to 40 °C, float life is not 20 years: the datasheet’s temperature-versus-float-life curve gives roughly 10–12 years at 30 °C, 6 years at 40 °C and 2–3 years at 50 °C.

    The fourth pain is the one nobody budgets for. A 53.50 kg cell is a two-person lift with a trolley, and shipping 54 from Ningbo or Shanghai is project cargo, not a pallet shipment. When the spare OPzS2-1000 you need sits in a container at 35 °C, the published storage table says it will be flat within six months.


    §3 — The Choice

    Three honest ways deliver the same 108 kWh on a 108 V bus, all documented in the OPzS tubular flooded battery range →. The trade is between mass, component count and service burden; the numbers below are published values plus clearly labelled arithmetic.

    Line itemFlooded OPzS2-1000, 54-cell 108 V stringGel OPzV2-1000, 54-cell 108 V stringFlooded OPzS2-500, 108-cell 108 V string
    Published nominal capacity1,000 Ah (C10)1,000 Ah (C10)500 Ah (C10)
    Cells per 108 V string5454108
    Nominal energy per string (arithmetic)108 kWh108 kWh108 kWh
    Cell dimensions (published)233 × 210 × 645 mm233 × 210 × 646 mm166 × 210 × 470 mm
    Total height over terminals (published)700 mm681 mm525 mm
    Cell weight (published)53.5 kg dry73.2 kg as shipped26.00 kg
    String mass (arithmetic)2,889 kg dry; 3,969 kg with electrolyte3,953 kg as shipped2,808 kg dry
    Float voltage at 25 °C2.23 V per cell2.23 V per cell2.23 V per cell
    Published cycle life at 80% DoD1,500–2,500 cyclesat least 1,500 cycles1,500–2,500 cycles per cell
    Maximum charging current per cell200 A (0.20 C10)200 A (0.20 C10)100 A (0.20 × 500 Ah)
    Internal resistance0.45 mΩ at 20 °C0.5 mΩ at 25 °Cnot published for this model
    Self-discharge3% per month2% per month3% per month
    Annual serviceEqualisation, specific gravity, water top-upNoneEqualisation, specific gravity, water top-up, twice as many measurement points
    Published standardsIEC 60896-11:2002, DIN 40736-1:1985IEC 60896-21/22:2004, DIN 40472:2015IEC 60896-11:2002 range compliance
    Cell sets replaced inside 7 years at one cycle per day (arithmetic)1 set at 1,500–2,500 cycles, that is 4.1 to 6.8 years1 set at 1,500 cycles, that is 4.1 years1 set at 1,500–2,500 cycles

    Two conclusions are easy to miss. First, the flooded OPzS2-1000 is the lightest and least complex of the three options despite the highest published cycle-life band: 2,889 kg against 3,834 kg for gel, a saving of 945 kg per 108 V string. Second, halving the cell size does not halve the work. The OPzS2-500 route buys 81 kg and costs you 54 extra cells, 54 extra interconnects, 54 extra specific-gravity readings and a rack roughly twice as deep.

    The gel option is the one to choose when nobody will ever touch the battery: no water, no equalisation, no hydrogen ventilation path, and 2% self-discharge against 3%. Charge acceptance is the same 200 A on both datasheets, and the installed weight is almost identical — 73.2 kg as shipped for the gel against 73.5 kg with electrolyte for the flooded cell. The gel cell has a published cycle-life floor of 1,500 cycles against the flooded 2,500-cycle ceiling, and carries slightly higher internal resistance at 0.5 mΩ against 0.45 mΩ.

    In a warm climate the seven-year replacement event decides the order. At one full cycle per day the published 1,500-cycle floor consumes 4.1 years and the 2,500-cycle ceiling 6.8 years, so every configuration replaces one full set inside seven years.


    §4 — The Framework

    Seven criteria decide whether a 1,000 Ah flooded tubular cell belongs on your site. Apply them in order; if you fail on the first two, do not bother pricing the rest.

    1. State the rate basis before anything else. Demand the discharge definition in writing for the OPzS2-1000: 1,000 Ah at C10 to 1.80 V per cell at 25 °C. If a supplier will not state the rate basis and cutoff, you are not comparing cells, you are comparing adjectives. Keep the derivation in mind: a lead-acid cell of this class delivers more than its C10 figure at a 20-hour rate, so a “1,000 Ah at 20 hours” claim describes a cell whose 10-hour capacity sits materially below 1,000 Ah.
    1. Match charge acceptance to the array, not to the load. Maximum charging current for the OPzS2-1000 is 200 A per cell, and sustained PV charging is normally held near 0.10 C10, which is 100 A per cell. Multiply by string voltage to size the array: 10.8 kW of PV per 108 V string and 21.6 kW per 216 V string, against ceilings of 21.6 kW and 43.2 kW at the published 0.20 C10 limit. A 100 kW array on a 108 V bus needs roughly ten strings, not three.
    1. Work out string voltage and setpoints together. These are the arithmetic every DC plant has to survive.
    Derived bus values108 V string (54 cells)216 V string (108 cells)
    Nominal bus voltage108 V216 V
    Nominal energy per string (arithmetic)108 kWh216 kWh
    Float at 2.23 V per cell (arithmetic)120.42 V240.84 V
    Solar float at 2.25 V per cell (arithmetic)121.5 V243 V
    Equalisation at 2.40 V per cell (arithmetic)129.6 V259.2 V
    Over-voltage disconnect at 2.47 V per cell (arithmetic)133.38 V266.76 V
    Low-voltage disconnect at 1.90 V per cell (arithmetic)102.6 V205.2 V
    PV absorbed at 0.10 C10 (arithmetic)10.8 kW21.6 kW
    PV ceiling at 0.20 C10 (arithmetic)21.6 kW43.2 kW

    4. Design the room before the battery. Flooded cells vent hydrogen. The published plug is acid-proof, flame-retardant and explosion-proof, and a catalytic plug is optional for exactly that reason. Common practice holds hydrogen below 4% by volume in the battery room, so you need forced ventilation driven by a hydrogen detector, not a window. Add spill containment, a floor that carries 2,889 kg per string, and rack design that survives seismic load if you are building in Callao, Valparaiso or Manila.

    1. Price the service calendar, not only the cells. For the OPzS2-1000, equalisation runs every 30 to 60 days at 2.35 V per cell — 2.40 V with −4 mV/°C/cell compensation in the solar and wind settings — and current limited to 0.25 C10. Specific gravity is checked against the acceptance reading and water is topped up on the same visit. Two site visits a year plus travel is the real recurring cost of a flooded string, and it is the line item a spreadsheet hides.
    1. Derate for altitude and temperature before you sign. Above 3,000 m, capacity derates 8% per 1,000 m: at 4,000 m that is 92% of rated capacity, roughly 920 Ah at C10, and at 5,000 m it is 84%, roughly 840 Ah. Below freezing, published 10-hour capacity falls to 85% at 0 °C and 65% at −15 °C; interpolating to −10 °C gives roughly 72%. High-altitude sites in the Andes, the Ethiopian highlands and interior Central Asia feel both at once.
    1. Specify acceptance and spares, not just price. Require a capacity test at C10 on arrival, a delivered specific-gravity reference reading per cell, and a spare strategy sized for a site you cannot reach quickly. On a 162-cell site built as 108 V plus 216 V, holding 2% spares means four OPzS2-1000 cells, which at 53.50 kg is 214 kg that must be stored properly rather than stacked against a wall.

    §5 — The Trust

    Six things go wrong in this category, and every one is avoidable in the contract.

    The 20-hour quote. A 20-hour rating and a 10-hour rating for the same nominal amp-hour figure describe different cells. The OPzS2-1000 2V1000Ah is published at 1,000 Ah (C10) to 1.80 V per cell at 25 °C. Write that sentence into the purchase order, with the cutoff voltage and reference temperature, and reject a delivery that does not meet it.

    The datasheet that does not match the packing list. Dimensional tolerance on the OPzS2-1000 is ±2 mm, and weight is contractual because it drives freight, floor loading and handling equipment. At 53.50 kg per cell, a 108-cell shipment is 5,778 kg. Verify gross weight on the bill of lading against the declared cell weights, and check that the certificate of conformity names the model and the manufacturing site.

    The equalisation that never happens. A flooded string left on float without periodic equalisation develops cell-to-cell divergence that quietly steals usable capacity. Insist on a written equalisation schedule tied to the 30-to-60-day interval and a monthly specific-gravity log against the acceptance reading. Then verify the charger actually equalises: some controllers skip the stage below 5 °C, and at −10 °C a −5 mV/°C/cell compensation would push the setpoint to 2.40 V per cell on a cold cell.

    The spare cell that arrives flat. The published storage table is unambiguous: at 20 °C a cell sits at roughly 82% after 6 months and 70% after 12 months; at 30 °C it is at about 65% after 6 months; at 40 °C it is down to roughly 48% after 6 months. An OPzS2-1000 spare for a site in Lagos/Apapa, Tema, Dar es Salaam or Jakarta cannot sit in an unventilated container. Specify that spares arrive charged, are stored between 10 °C and 25 °C, and are recharged every six months.

    The missing ventilation path. Flooded tubular cells vent hydrogen under float and under equalisation. If the battery room shares its air with equipment, the hydrogen detector and the interlock belong to the same room, and forced ventilation added after handover is expensive.

    The certificate stack that is short. The published compliance set for the OPzS2-1000 is IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4 and UL 1989, with RoHS, REACH and WEEE, plus IMDG Class 8 and UN2794 transport documents. Third-party inspection is available on demand through SGS, TUV, BV, CTI, SONCAP, PVOC, SASO, BIS and ESMA. Ask for SONCAP and SASO for the Gulf and West Africa, PVOC for Kenya and Tanzania, BIS for India, ESMA for Chile and Peru, before the shipment leaves.


    §6 — FAQ

    Q1. What is the exact rating of the OPzS2-1000 2V1000Ah, and is it a 10-hour or a 20-hour rating? The published rating is 1,000 Ah at C10, that is 100 A for 10 hours down to 1.80 V per cell at 25 °C. No 20-hour rate is published for this model, and any 20-hour figure in a quotation describes a different, weaker cell unless the supplier states otherwise in writing.

    Q2. How many cells do I need for a 108 V or a 216 V system? 54 cells × 2 V = 108 V for a 108 V string, and 108 cells × 2 V = 216 V for a 216 V string. At 1,000 Ah per cell that is 108 kWh and 216 kWh nominal.

    Q3. How much usable energy is in one string? Nominal 108 kWh for 54 OPzS2-1000 cells and 216 kWh for 108 cells, by arithmetic. At an 80% depth-of-discharge design limit the usable figures are roughly 86 kWh and 173 kWh, before temperature and ageing derating.

    Q4. How large a PV array can one string absorb? Sustained charging is normally held near 0.10 C10, so 100 A per cell, which is 10.8 kW per 108 V string and 21.6 kW per 216 V string. The published ceiling of 200 A per cell is 21.6 kW and 43.2 kW; beyond that you get curtailment or an over-voltage trip at 2.47 V per cell.

    Q5. Can a gel OPzV2-1000 replace the flooded OPzS2-1000 without changing the plant? Electrically yes on cell voltage: both are 2 V cells with 1,000 Ah at C10 and M8 terminals torqued to 10–12 N·m, and per both datasheets both float at 2.23 V per cell, accept 200 A maximum charging current, are rated 20+ years at 20 °C and reach about 1,500 cycles at 80 % DoD. Mechanically, no without review. The gel cell is 73.2 kg as shipped against 53.5 kg dry for the flooded cell, and its internal resistance is 0.5 mΩ against 0.45 mΩ. What the gel cell does remove is the routine: no water, no equalisation and no hydrogen ventilation.

    Q6. Does the battery room need special ventilation? Yes. These are vented cells with acid-proof, flame-retardant, explosion-proof plugs and an optional catalytic plug. Common practice caps hydrogen at 4% by volume, so you need forced ventilation controlled by a hydrogen detector, plus spill containment and a floor rated for 2,889 kg of dry cells, and about 3,969 kg with electrolyte, per 108 V string.

    Q7. How often should the string be equalised and checked? Equalise every 30 to 60 days at 2.35 V per cell at 25 °C, or 2.40 V with −4 mV/°C/cell compensation in the solar and wind settings, current limited to 0.25 C10. Check electrolyte specific gravity against the reading on the acceptance certificate rather than a generic table, and top up water on the same visit.

    Q8. What spares should I hold for a site I cannot reach quickly? Hold about 2% of installed cells, so four OPzS2-1000 spares on a 162-cell site, and treat them as live assets: the published storage table shows roughly 82% remaining capacity after 6 months at 20 °C, 65% at 30 °C and 48% at 40 °C. Spares must be stored between 10 °C and 25 °C and recharged every six months.

    Q9. What happens to capacity at altitude and at −10 °C? Above 3,000 m, capacity derates 8% per 1,000 m, so roughly 920 Ah at 4,000 m and 840 Ah at 5,000 m for the OPzS2-1000. At −10 °C the published curve gives roughly 72% of rated 10-hour capacity, interpolated between 85% at 0 °C and 65% at −15 °C. Cold sites also need a charger that suppresses equalisation below about 5 °C.

    Q10. Which certificates and shipping documents should I demand? IEC 60896-11:2002, DIN 40736-1:1985, GB/T 19638.2-2014, YD/T 1360, Eurobat Long Life, BS 6290 Part 4 and UL 1989, plus RoHS, REACH and WEEE. For freight, IMDG Class 8 and UN2794 with MSDS. Add SONCAP and SASO for the Gulf and West Africa, PVOC for Kenya and Tanzania, BIS for India, ESMA for Chile and Peru.


    Expert Summary

    The OPzS2-1000 2V1000Ah is a 2 V, 1,000 Ah flooded tubular vented lead-acid cell rated at C10, meaning 100 A for 10 hours to 1.80 V per cell at 20 °C, and it is the right cell once a hybrid renewable-plus-telecom plant needs a real DC bus rather than a cabinet. Published dimensions are 233 × 210 × 645 mm with 700 mm over terminals, 53.5 kg per cell dry and 73.5 kg with electrolyte, M8 terminals torqued to 10–12 N·m, 0.45 mΩ internal resistance at 20 °C, 4,500 A short-circuit current, 3% monthly self-discharge, float 2.23 V per cell with −3 mV/°C/cell compensation, equalisation 2.35 V per cell or 2.40 V with −4 mV/°C/cell in the solar and wind settings, maximum charging current 200 A or 0.20 C10, cycle life 1,500–2,500 at 80% DoD and a designed float life of 20-plus years at 20 °C, falling to roughly 10–12 years at 30 °C and 6 years at 40 °C. Fifty-four cells give a 108 V string at 108 kWh nominal, 2,889 kg dry and about 3,969 kg with electrolyte; 108 cells give 216 V and 216 kWh. Because charge acceptance caps the array, sustained PV input is limited to about 100 A per cell, or 10.8 kW per 108 V string, against a 21.6 kW ceiling. Flooded operation demands forced ventilation with hydrogen near 4% by volume, quarterly water top-up, specific-gravity checks and equalisation every 30 to 60 days. Above 3,000 m capacity derates 8% per 1,000 m, and at −10 °C roughly 72% of rated 10-hour capacity remains. Against a gel OPzV2-1000 at 73.2 kg and 108 smaller OPzS2-500 cells at 2,808 kg, the flooded OPzS2-1000 is the lightest, lowest-component-count route to the same 108 kWh.


    Contact CHISEN — 24-Hour Response

    Send us the following and we will return a sizing sheet within 24 hours: the DC bus voltage you need (48 V, 108 V or 216 V), the load in amperes and the required autonomy in hours, the peak PV array size in kW and the array peak current in amperes, the design ambient temperature and the site altitude, whether the battery room is attended or unmanned, and the destination port for the shipment — Shanghai, Ningbo, Mumbai, Karachi, Chattogram, Port Said, Jebel Ali, Durban, Mombasa, Lagos/Apapa, Tema, Dar es Salaam, Santos, Callao, Manila, Jakarta, Ho Chi Minh City, Rotterdam, Hamburg, Valencia, Gdansk or Mersin. We will return the string configuration, the OPzS2-1000 cell count, the bus setpoints, the charge-acceptance limit against your array, the spares recommendation and the seven-year operating model.

    Related reading: OPzS2-1000 2V1000Ah model page → · OPzS tubular flooded battery range → · About CHISEN Battery →

    CHISEN operates 8 production bases with 70 million kVAH of annual capacity and holds CE, ISO 9001, ISO 14001, UL and IEC approvals. Full range data, drawings and the certificate pack for your destination market are available on leadacidbattery.cn.

    hero industrial battery room
    hero industrial battery room

    Related CHISEN Buyer Guides

  • OPzV2-2250 2V2250Ah Tubular Gel Battery: 216V DC Panel and Utility Storage Sizing

    OPzV2-2250 2V2250Ah Tubular Gel Battery: 216V DC Panel and Utility Storage Sizing

    Reading time: 17 minutes | For: utility-scale storage procurement, data-centre infrastructure engineers, telecom DC plant designers, renewable project developers, and battery distributors serving the Gulf, South Asia, Southeast Asia, Africa and Latin America

    Answer First

    The OPzV2-2250 2V2250Ah is a 2-volt, 2,250 amp-hour tubular-plate gel VRLA cell built for the largest stationary installations in the CHISEN range: 216 V and 380 V DC systems, data-centre backup power, utility-scale solar and wind storage, and unattended telecom plants. Its 2,250 Ah is a 10-hour rate (C10) figure, and the cell weighs 175 kg, which makes it the point where battery procurement becomes a logistics project as much as an electrical one.

    Five numbers decide the procurement:

    • 2,250 Ah at C10 (10-hour rate, cutoff 1.80 V/cell). The 20-hour rate is not published for this cell; any quotation that expresses 2,250 Ah at 20 hours is quoting a different rating basis.
    • 487 x 212 x 772 mm, 807 mm over the terminals, 175.0 kg. A 108-cell 216 V string is therefore 18,900 kg of battery and 486 kWh nominal.
    • 565 A maximum charging current. On a 108-cell 216 V string that is a charger class of roughly 13 MW at the published limit.
    • ≥1,500 cycles at 80% depth of discharge, float 2.23 V per cell at 25 °C with a -3 mV per °C compensation, and 2% self-discharge per month with one year of storage without a recharge.
    • Installation permitted vertical, horizontal or on its side, never inverted, and no water or acid refill over the service life.

    The honest caveat: the OPzV2-2250 2V2250Ah is a float-first cell with a published cycle figure at 80% DOD. A project that cycles the bank daily at 80% depth is budgeting against the bottom of the published envelope; a project that floats the bank with occasional backup discharge lives in the part of the envelope where the 175 kg cell is obviously the right answer.


    Key Takeaways

    1. The panel voltage, not the cell, is the first decision. 54 cells make 108 V, 108 cells make 216 V, 190 cells make 380 V three-phase DC. At the published OPzV2-2250 capacity those panels carry 243 kWh, 486 kWh and 855 kWh nominal.
    2. 2,250 Ah at C10 must be stated in the order. A 20-hour capacity number for a cell of this size looks better on paper and describes a different product.
    3. 175 kg per cell dictates the installation method. A 108-cell OPzV2-2250 string is 18.9 tonnes of battery. Container plan, lay-down area, aisle width, floor loading and crane capacity are decided before the first cell is booked.
    4. 565 A per cell is the charge acceptance limit that shapes the array design. On a 216 V string it implies a charger class of about 13 MW, and a solar array that exceeds that on a sunny day will need a controlled charge path rather than a direct connection.
    5. Altitude and self-discharge decide the storage and standby strategy. Capacity derates 8% per 1,000 m above 3,000 m, self-discharge is 2% per month, and a cell stored more than six months should be given a boost charge.

    §1 — OPzV2-2250 2V2250Ah Quick Specifications Table

    Every value below comes from the published CHISEN data sheet for the OPzV2-2250.

    ParameterPublished value for OPzV2-2250
    ModelOPzV2-2250
    Nominal voltage2 V (DC)
    Capacity2,250 Ah at C10 (10-hour rate, cutoff 1.80 V/cell)
    Dimensions (L x W x H)487 x 212 x 772 mm
    Total height over terminals807 mm
    Weight175.0 kg (385.9 lb), filled with electrolyte
    TerminalPhi20-M8, torque 10-12 N.m
    TechnologyTubular gel VRLA: tubular positive plate, high-purity nano gel electrolyte (SiO2 fumed gel + H2SO4), valve-regulated sealed structure
    Cycle life>=1,500 cycles at 80% DOD
    Designed float life20+ years at 20 °C (tubular-class value, 5/5 datasheets)
    Float voltage2.23 V/cell at 25 °C, compensation -3 mV/°C/cell
    Equalise voltage2.35 V/cell at 25 °C (tubular-class value, 5/5 datasheets)
    Maximum charging current565 A (model page)
    Self-discharge2% per month; storable up to 1 year without recharging; boost charge every 3-6 months
    Operating temperatureDischarge -40 to +65 °C; charge -30 to +65 °C; storage -25 to +45 °C
    Installation orientationVertical, horizontal or on its side; never inverted
    MaintenanceMaintenance-free; valve-regulated sealed gel, no water refilling over service life
    AltitudeNormal operation to 3,000 m; derate capacity 8% per 1,000 m above 3,000 m
    ApplicationsTelecom base stations (unattended sites), large UPS, data-centre backup power, energy storage, solar PV and wind storage stations, industrial energy storage systems, islands, border posts, extreme environments
    String configuration24 cells = 48 V; 54 cells = 108 V (110 V); 108 cells = 216 V (220 V); 190 cells = 380 V three-phase DC

    §2 — The Pain

    At this capacity the engineering risk is rarely the cell itself. It is the specification chain around it, and the three most common failures all start with a sentence that was never written down.

    The rating basis is assumed. A 2,250 Ah cell is a large enough object that most buyers assume the rating is generous and comparable across suppliers. It is not. The OPzV2-2250 2V2250Ah publishes 2,250 Ah at C10 to 1.80 V per cell, and a cell of the same nominal capacity rated at the 20-hour rate delivers a different amount of usable energy at the discharge rates a backup system actually sees.

    The charge path is designed from the load, not from the cell. 565 A per cell is the published maximum. An installer who sizes the charger from the site’s average load rather than from the cell’s charge acceptance limit will either charge slowly for months or push past the limit in the first equalise cycle.

    The logistics are assumed to be a delivery detail. A 175 kg OPzV2-2250 cell does not fit a standard pallet lift and does not fit a two-person lift. A 108-cell string needs a floor loading calculation, a lay-down area sized for full pallets, a lifting plan and a container plan for 19.2 tonnes per 40-foot unit. Projects that leave this to the freight forwarder lose weeks.

    The standby story is treated as solved. The published self-discharge of the OPzV2-2250 is 2% per month and the cell can be stored up to a year without a recharge, which sounds like a free year. It is a free year only if someone actually boosts the string every three to six months, and at a 108-cell scale that is a maintenance plan, not a checkbox.


    §3 — The Choice

    The OPzV2-2250 2V2250Ah is the correct cell when the installed energy per string is large enough that a smaller cell would need an impractical unit count, and the site is unattended or only occasionally attended. The panel arithmetic from published figures is:

    Panel configurationCellsPanel voltageNominal energy (arithmetic)Battery mass (arithmetic)Charger class at the 565 A limit (arithmetic)Where it fits
    48 V system2448 V24 x 2 V x 2,250 Ah = 108 kWh24 x 175.0 kg = 4,200 kg24 x 565 A = 13,560 A at 48 V = 651 kWLarge telecom sites, small industrial storage
    108 V (110 V) system54108 V54 x 2 V x 2,250 Ah = 243 kWh54 x 175.0 kg = 9,450 kg54 x 565 A = 30,510 A at 108 V = 3.3 MWTelecom DC plants, island and border systems, hybrid solar
    216 V (220 V) system108216 V108 x 2 V x 2,250 Ah = 486 kWh108 x 175.0 kg = 18,900 kg108 x 565 A = 61,020 A at 216 V = 13.2 MWData-centre DC panels, utility storage, 380 V DC
    380 V three-phase DC190380 V190 x 2 V x 2,250 Ah = 855 kWh190 x 175.0 kg = 33,250 kg190 x 565 A = 107,350 A at 380 V = 40.8 MWUtility-scale storage, large industrial sites

    The third row is the one that decides the procurement, and it is worth stating plainly: a 216 V string of 108 OPzV2-2250 cells is 486 kWh of battery, 18.9 tonnes of mass, and a 13.2 MW charger class at the published charge limit. At that scale the cell choice is no longer a technical detail; it is the project.

    Against a lithium alternative the comparison has a specific shape, and it should be made honestly:

    CriterionOPzV2-2250 2V2250Ah (tubular gel)Comparable LFP stationary installation
    Published cycle life>=1,500 cycles at 80% DOD3,000-5,000 cycles at 80% DOD
    Maintenance in serviceNone; sealed gel, no water refillingNone; requires a battery management system and monitoring
    Cell handling175 kg per cell, two-person-plus handling and lifting planLighter per unit of energy, with BMS integration to design
    Upfront capital costLowerHigher, typically two to two-and-a-half times in industrial quotations
    Cell-level shipping and market documentationNot applicable to a sealed stationary cellUN38.3 and IEC 62619 documentation normally required for shipping and market access
    Standby behaviour2% self-discharge per month; float at 2.23 V per cellLower self-discharge in most modern LFP cells, with BMS balancing
    InstallationVertical, horizontal or side; never invertedOrientation constraints set by the module and BMS design

    The OPzV2-2250 2V2250Ah is better than a smaller cell in the same panel because the unit count falls sharply — 108 cells at 216 V instead of several hundred — which reduces interconnect count, rack count and the number of cells that can fail open-circuit. It is better than a flooded tubular cell wherever the site is unattended, because the sealed gel removes the water-refill interval entirely. It is better than a comparable LFP installation for a buyer who has no battery management infrastructure, no cell-level certification process and a preference for a float product that sits quietly on float voltage for years.

    It is worse than lithium on cycle life, on installation weight and on capital cost, and for a project that discharges the bank daily at 80% depth of discharge, those three disadvantages compound. §4 sets out how to tell which project you are in before you order.

    For the wider programme context, the tubular gel OPzV range sets out the capacity ladder the OPzV2-2250 belongs to, and the solar battery range covers the PV-linked systems where the 216 V and 380 V configurations are most often specified.


    §4 — The Framework

    Seven criteria decide whether the OPzV2-2250 2V2250Ah is right for a specific project. Take them in order, because each one removes a class of error that the next one cannot repair.

    1. Fix the panel voltage first. 48 V, 108 V, 216 V or 380 V. The panel voltage determines the charger, the DC bus, the protection, the string fuses, the inverter window and the earthing design, and each of those is expensive to change after the tender.
    2. State the rating basis. 2,250 Ah at C10 to 1.80 V per cell. Write it into the purchase order, the certificate requirement and the warranty for the OPzV2-2250.
    3. Confirm the charge acceptance limit and design the charge path around it. 565 A per cell maximum. At 216 V and 108 cells that is 13.2 MW at the limit, so the array, the charger and the control strategy have to be designed together rather than sized independently.
    4. Model the real depth of discharge. The published ≥1,500 cycles at 80% DOD is the planning figure for an OPzV2-2250 project that genuinely cycles that deep. A site that floats with occasional backup discharge will do considerably better; a site that reaches 80% every day will consume the bank on that number.
    5. Design the installation logistics inside the order. 175 kg per cell, 487 mm footprint, 807 mm overall height. Confirm floor loading, aisle width, the lifting method, the lay-down area and the container plan for 19.2 tonnes per 40-foot unit before the booking.
    6. Check altitude and ambient temperature against the published limits. 3,000 m normal operation with an 8% capacity derate per additional 1,000 m; discharge -40 to +65 °C, charge -30 to +65 °C. For high-altitude sites in Peru, Bolivia and Mexico this changes the sizing, not just the label.
    7. Write the standby and storage discipline into the maintenance plan. 2% self-discharge per month, one year of storage without a recharge, and a boost charge every three to six months. On a 108-cell string that is a scheduled task with a named owner.

    §5 — The Trust

    The OPzV2-2250 2V2250Ah is a conventional industrial cell, and the traps around it are commercial rather than technical. Name them before you sign.

    Ask for the capacity basis and the discharge curve. A “2,250 Ah” quoted without a rate and a cutoff is not a specification. At this size the difference between a C10 and a C20 basis is commercially significant and technically invisible without the curve.

    Ask for the cycle test profile behind the ≥1,500 figure. Depth of discharge, cutoff voltage, temperature, charge regime and rest periods. A supplier who cannot produce the OPzV2-2250 profile in one reply is not quoting a test result.

    Verify the weight, and plan for it. 175.0 kg filled with electrolyte is published for the OPzV2-2250. Any quotation at a materially different weight is describing a different cell, and a rack designed to the wrong weight is a structural problem.

    Confirm the construction. Tubular positive plate, nano gel electrolyte and a valve-regulated sealed structure are what make the maintenance-free and multi-orientation claims true. Ask for the electrolyte specification and the valve pressure range of the OPzV2-2250.

    Check the warranty at the conditions you will actually run. Float life is claimed at 25 °C. Ask what happens at 40 °C ambient, at 80% DOD cycling, at 4,000 m altitude and after a deep discharge that is never equalised, because those are the four conditions that shorten life.

    Demand a string-level failure procedure. On a 108-cell series string, one weak cell determines the capacity of the whole panel. Ask how the site identifies a weak cell, whether single-cell test fixtures are supplied, and whether the warranty survives a partial replacement.

    Fix the logistics contract. Container plan, lay-down area, lifting equipment, the maximum time between delivery and the first full charge, and the storage temperature limit of -25 to +45 °C for any string held at the port in Mumbai, Mombasa, Santos, Jebel Ali or Port Said.


    §6 — FAQ

    Q1. What is the rated capacity of the OPzV2-2250 2V2250Ah? 2,250 Ah at the 10-hour rate with a 1.80 V per cell cutoff. The 20-hour rate is not published for this cell, so treat any 20-hour capacity figure for the same case as a different rating basis and request the discharge curve before comparing quotations.

    Q2. How many cells make a 216 V system and how much do they weigh? 108 cells in series, giving 108 x 2 V x 2,250 Ah = 486 kWh nominal and 108 x 175.0 kg = 18,900 kg of battery. The published configuration band also covers 24 cells for 48 V, 54 for 108 V and 190 for 380 V three-phase DC.

    Q3. What charger does a 216 V string of these cells need? At the published maximum charge current of 565 A per cell, a 108-cell string draws 61,020 A at 216 V, a charger class of roughly 13.2 MW. Float is 2.23 V per cell at 25 °C with -3 mV per °C compensation, and the equalise stage must respect that compensation.

    Q4. Can the OPzV2-2250 be installed horizontally or on its side? Yes. The sealed gel construction allows vertical, horizontal or side installation, but never inverted, because the gel must remain in contact with the plates. A flooded tubular cell in the same project must be installed upright, so the installation plan for a mixed specification has to be written twice.

    Q5. How long does the cell last on float, and how is that measured? The published float design life for the range is 20 years or more at 20 °C, with a float voltage of 2.23 V per cell. Float life is a temperature-conditional claim: at a stable 25 °C the published envelope holds, and every degree above that shortens it, which is why the battery-room ventilation and shading plan is part of the warranty discussion.

    Q6. What happens if the site stores the battery for a year before use? The published data for the OPzV2-2250 allows storage of up to one year without recharging, with self-discharge of 2% per month, and recommends a boost charge every three to six months. On a 108-cell string that is a scheduled maintenance task with a named owner, not an automatic condition.

    Q7. Does altitude reduce the usable capacity? Yes. Normal operation is rated to 3,000 m and capacity derates by 8% for each additional 1,000 m, so 4,000 m costs 8% and 5,000 m costs 16%. This applies to high-altitude telecom and renewable sites in the Andes, the high desert in Mexico, and elevated infrastructure in Peru and Bolivia.

    Q8. What is the operating temperature range? Discharge -40 to +65 °C, charge -30 to +65 °C, storage -25 to +45 °C. The charge ceiling is the number to watch in an unconditioned power room in the Gulf, southern India or northern Australia, where an equalise cycle can run above the published limit if the room is not shaded or ventilated.

    Q9. What should be in the purchase order? The model, the capacity and its basis (2,250 Ah at C10 to 1.80 V/cell), float and equalise voltages with the temperature compensation, the 565 A maximum charging current, the cycle figure with its depth of discharge, the operating temperature range, the altitude derating, the storage and boost-charge requirement, the applicable standards, and the warranty terms at cell and string level with a named local claim contact.


    Expert Summary

    The OPzV2-2250 2V2250Ah is a 2 V, 2,250 Ah tubular-plate gel VRLA cell for the largest stationary systems in the range: 216 V and 380 V DC panels, data-centre backup power, utility-scale solar and wind storage, and unattended telecom plants. The decisive published specification is that 2,250 Ah is a 10-hour rate to a 1.80 V per cell cutoff, so every quotation, certificate and warranty must state the basis, because a 20-hour figure for the same case describes a cell with different usable energy at the rates a backup system actually sees. The cell measures 487 x 212 x 772 mm, 807 mm over the terminals, weighs 175.0 kg filled with electrolyte, carries a Phi20-M8 terminal with a 10-12 N.m torque, publishes at least 1,500 cycles at 80% DOD, floats at 2.23 V per cell at 25 °C with a -3 mV per °C compensation, accepts a maximum charge current of 565 A, self-discharges at 2% per month with one year of storage without recharge, operates from -40 to +65 °C on discharge and -30 to +65 °C on charge, stores between -25 and +45 °C, installs vertical, horizontal or on its side but never inverted, and needs no maintenance. Panel arithmetic follows directly: 24 cells give 48 V at 108 kWh and 4,200 kg, 54 cells give 108 V at 243 kWh and 9,450 kg, 108 cells give 216 V at 486 kWh and 18,900 kg, and 190 cells give 380 V at 855 kWh and 33,250 kg, with charger class at the published limit running from 651 kW to 40.8 MW. Against a comparable LFP installation, the gel cell offers lower capital cost, no battery management system and no cell-level shipping documentation, while lithium offers 3,000-5,000 cycles at 80% DOD and materially lower installation weight. The non-negotiables are the panel voltage fixed before the cell count, the C10 basis in writing, a charge path designed around 565 A per cell, a depth-of-discharge model taken from the real load profile, an 8% per 1,000 m derate above 3,000 m, and an installation logistics plan built around 175 kg per cell and 19.2 tonnes per 40-foot container.


    Contact CHISEN — 24-Hour Response

    CHISEN replies to technical and commercial enquiries within 24 hours and returns a written sizing recommendation with published data, not a catalogue listing.

    Send us the information below and we will return the string configuration, charger class, float and equalise settings and the logistics plan for the OPzV2-2250 2V2250Ah in your project:

    • Panel voltage and the duty profile, including the expected depth of discharge and cycle frequency
    • Site altitude and the ambient temperature range, and whether the battery room is conditioned
    • Available charger class, the array peak output, and the intended charge control strategy
    • Whether the site is attended or unmanned, and the service interval you can support
    • Annual volume, delivery terms and destination port

    Email: sales@chisen.cn WhatsApp: +86 131 6622 6999 Call: +86 131 6622 6999

    Related reading: OPzV2-2250 2V2250Ah product specifications · Tubular gel OPzV range and panel configurations · Solar battery systems for PV-linked storage

    Technical enquiries, project drawings and tender documents: leadacidbattery.cn

    Related CHISEN Buyer Guides