6-EVF-120 12V120Ah AGM VRLA Battery for Solar Street Lighting

BatteryMaintenanceOrReplacementOldBattery

Answer First

The 6-EVF-120 is the 120 Ah AGM VRLA model in CHISEN’s 12 V 6-EVF line, and it is the size most solar street lighting integrators reach for when the LED head draws 40–60 W and the controller runs on a 12 V bus. Every figure on this page comes from the published model data for the 6-EVF-120: 12 V nominal, 120 Ah at the C3 rate, a 407×170×240 mm case weighing 40 ± 0.2 kg, float at 13.5 V, equalise at 14.1 V, maximum charge current 24.0 A, end-of-discharge cutoff 1.75 V per cell, self-discharge ≤ 3 % per month at 25 °C, operating range −15…50 °C, and a published design life of 2–5 years. The terminal is φ20-M8.

On the arithmetic that decides the purchase: one 12 V string is six 2 V cells, so a full 120 Ah gives 12 × 120 = 1,440 Wh of nominal energy. At the practical 80 % depth of discharge allowed by the 1.75 V/cell cutoff, the usable figure is 1,440 × 0.80 = 1,152 Wh per string. A 50 W LED head burning four hours per night consumes 50 × 4 = 200 Wh, and three nights of weather autonomy adds 200 × 3 = 600 Wh — comfortably inside 1,152 Wh, which is why one 6-EVF-120 per pole is normally enough instead of two. Current specifications are listed on this model page.

Key Takeaways

  • Published, not estimated: 12 V nominal, 120 Ah at C3, 407×170×240 mm, 40 ± 0.2 kg, φ20-M8 terminal — all from the manufacturer model data.
  • 1,440 Wh nominal per string: 12 V × 120 Ah, giving 1,152 Wh usable at 80 % depth of discharge against the 1.75 V/cell cutoff.
  • Storage losses are quantified: self-discharge ≤ 3 % per month at 25 °C, i.e. 120 × 0.03 = 3.6 Ah per month of idle loss, which matters for poles idled through the dry season.
  • Thermal envelope: −15…50 °C working temperature, and cycle life 350–600 cycles at 50–80 % depth of discharge.
  • Sizing help sits next door: the 50 Ah and 60 Ah options in the full product range cover lighter single-head poles, and the sibling model page lists the 6-EVF-50 side by side.

§1 — 6-EVF-120 Quick Specifications

ParameterValueSource
Nominal voltage12 VModel page
Capacity120 AhModel page
RateC3Model page
Dimensions (L×W×H)407×170×240 mmModel page
Weight40 ± 0.2 kgModel page
Terminalφ20-M8Model page
Float voltage13.5 VModel page
Equalise voltage14.1 VModel page
Cycle life350–600 cycles (DoD 50–80 %)Model page
Maximum charge current24.0 AModel page
End-of-discharge cutoff1.75 V/cellModel page
Self-discharge≤ 3 %/month at 25 °CModel page
Working temperature−15…50 °CModel page
Design life2–5 yearsModel page
Nominal energy per string12 V × 120 Ah = 1,440 WhArithmetic from Model page
Usable energy at 80 % DoD1,440 Wh × 0.80 = 1,152 WhArithmetic from Model page

§2 — The Pain: Sizing Solar Street Lighting Batteries Without Published Data

Solar street lighting projects fail in predictable ways, and most of them fail on the battery side of the cabinet. Three patterns repeat.

The undersized string. The controller is quoted at 20 A and the integrator installs a smaller pack “to save space”, then discovers during the first overcast week that the pack sits at the 1.75 V/cell cutoff every night. The published cycle life of the 6-EVF-120 is 350–600 cycles at 50–80 % depth of discharge; a string that regularly falls below 50 % depth consumes that cycle budget far faster than the datasheet range assumes. Sizing has to be done on published nominal capacity, not on a supplier’s optimistic round figure.

The doubled cabinet. When one string is not enough, the usual answer is two batteries in parallel or in series. That doubles module mass — the 6-EVF-120 alone is 40 ± 0.2 kg, so two units are 80 kg — and it doubles the wiring, the enclosure size, the pole foundation load, and the number of terminals that must be torqued correctly in the field.

The unquoted setting. Charge controller setpoints are frequently copied between projects, which is why the float and equalise values have to be stated precisely: 13.5 V float and 14.1 V equalise for the 6-EVF-120, with a maximum charge current of 24.0 A. A controller set to 14.4 V continuous float on a 12 V AGM string will hold the pack above its intended float voltage, and a controller allowed to push more than 24.0 A removes the current limit the manufacturer publishes.

§3 — The Choice: Which Chemistry, Bus Voltage, and Capacity

For a pole that only has to run a LED head, a night, and a controller, three routes exist, and they differ on three axes that matter to an importer: mass, service interval, and how much the chemistry tolerates being left in a hot enclosure.

AGM VRLA in a 12 V enclosure. This is where the 6-EVF-120 sits. Valve-regulated cells lose no electrolyte, need no topping up, and can be shipped and installed in any orientation. A single 12 V string with 1,440 Wh nominal and 1,152 Wh usable at 80 % depth of discharge covers a 50 W head at four hours per night with three nights of autonomy — 200 Wh per night × 3 nights = 600 Wh against 1,152 Wh available.

Two 6 V blocks or a 24 V bus. Some controllers require 24 V. Two 6-EVF-120 units in series give 24 V × 120 Ah = 2,880 Wh nominal, but the string count doubles and the installation labour doubles with it. When a 24 V controller can be avoided without reducing light output, a single 12 V string is the simpler mechanical answer.

Flooded tubular or gel tubular. These are stationary-float chemistries with long design lives in controlled rooms. A sealed roadside cabinet held at the extreme end of the −15…50 °C working range is a harsher environment: temperature swings drive self-discharge and charge acceptance, and tubular cells are heavier for the same amp-hour rating. Where the pack sits in a pole box in a hot climate, the AGM VRLA route is usually the lighter and simpler one.

§4 — The Framework: A Four-Step Sizing Method for Solar Street Lighting

Step 1 — Load audit. Measure the LED head at its regulated drive current, not its nameplate wattage. Write the figure into the project file; everything downstream depends on it.

Step 2 — Autonomy. Decide the number of consecutive nights the pole must survive without sun. Three nights is common for cloudy-season resilience; one night suits a site with a reliable grid-backed backup.

Step 3 — Bank sizing. Divide by the usable depth of discharge, then by nominal voltage, then read up to the next published capacity. Worked example with the 6-EVF-120 in mind: a 60 W head at 5 hours per night draws 60 × 5 = 300 Wh per night; three nights of autonomy gives 300 × 3 = 900 Wh; at 80 % usable depth that requires 900 ÷ 0.80 = 1,125 Wh nominal; at 12 V that is 1,125 ÷ 12 = 93.75 Ah; the next published step is 120 Ah, so the 6-EVF-120 is the correct choice and a 100 Ah unit would leave 1,200 Wh × 0.80 = 960 Wh against 900 Wh of demand — no margin for a cold morning.

Step 4 — Charge path check. Confirm that the controller’s output current stays inside the published maximum of 24.0 A for the 6-EVF-120. A 300 Wp array on a 12 V bus is 300 ÷ 12 = 25 A of theoretical peak, so an unmodified controller can exceed the limit; most street lighting controllers limit to 20 A, which is inside the specification. Also confirm the controller’s float setting matches 13.5 V and that equalise is limited to 14.1 V.

§5 — Where the 6-EVF-120 Sits Inside the 6-EVF Line

ModelVCapacityRateL×W×H mmWeightTerminalFloatEqualiseCharge currentCutoffDesign lifeSource
6-EVF-501250 AhC3230×140×18015.25 ± 0.2 kgφ11.8-M613.5 V14.1 V10.0 A1.75 V/cell2–5 yearsModel page
6-EVF-10012100 AhC3330×170×21831.5 ± 0.2 kgφ20-M813.5 V14.1 V20.0 A1.75 V/cell2–5 yearsModel page
6-EVF-12012120 AhC3407×170×24040 ± 0.2 kgφ20-M813.5 V14.1 V24.0 A1.75 V/cell2–5 yearsModel page
6-EVF-15012150 AhC3483×170×24048.5 ± 0.2 kgφ20-M813.5 V14.1 V30.0 A1.75 V/cell2–5 yearsModel page

§6 — The Trust: Factory Capacity, Certifications, and an Acceptance Protocol

The 6-EVF-120 is produced by CHISEN Battery in Hangzhou, China, an operation that runs 8 production bases with an annual capacity of 70 million kVAh across flooded tubular OPzS2, gel tubular OPzV2, and the 12 V VRLA 6-DZF / 6-DMF / 6-EVF lines. Factory certifications include CE, ISO 9001, ISO 14001, UL, and IEC, and the export desk handles the technical and commercial files for importers and OEM programme buyers.

Shipments move through the standard Chinese export ports — Ningbo, Shanghai, and Shenzhen on the coastal route, with onward routing to destination markets including India, Nigeria, Kenya, Vietnam, the Philippines, Brazil, Egypt, Mexico, Indonesia, and Pakistan, and onward from Jebel Ali, Karachi, Mumbai, Lagos, Mombasa, Durban, and Port Said on the destination side.

Acceptance protocol on delivery. Open the pallet and confirm the model marking reads 6-EVF-120 and the case reads 12 V 120 Ah. Measure open-circuit voltage on the 12 V string; a fully charged string should sit near 12.6–12.8 V, which is 2.10–2.13 V per cell, and any reading below 12.3 V should be logged before the battery is installed. Check that the terminal hardware matches the published φ20-M8 designation and that the case shows no swelling, cracking, or electrolyte residue — the residue check matters because AGM cells that have vented cannot be returned to float service. Confirm the manufacturing date and the warranty marking on the label, photograph both, and keep the photos with the delivery note. The terminal torque value is not published in the model data, so it must be requested from the factory before the first installation.

§7 — FAQ

Q1: What float and equalise setpoints does the manufacturer publish for the 6-EVF-120? Float 13.5 V and equalise 14.1 V for the complete 12 V string, i.e. 2.25 V and 2.35 V per cell.

Q2: What is the maximum charging current for the 6-EVF-120? 24.0 A, which is 0.20 of the 120 Ah rating, and the controller output should stay inside that limit.

Q3: What are the case dimensions and weight of the 6-EVF-120? 407×170×240 mm and 40 ± 0.2 kg per module, both published in the model data.

Q4: What terminal type and torque does the 6-EVF-120 use? The terminal type is φ20-M8. The torque figure is not published and is to be requested from the factory.

Q5: How many cells does a 12V120Ah string contain and what bus voltage does it give? A 12 V string is 12 ÷ 2 = 6 cells and gives 12 V; two strings in series give 24 V across 12 cells.

Q6: How should an importer verify the 6-EVF-120 on delivery? Check the model marking, measure open-circuit voltage (about 12.6–12.8 V when charged), inspect for swelling or residue, and record the manufacturing date and label photographs.

Q7: Which certifications does the CHISEN factory behind the 6-EVF-120 hold? CE, ISO 9001, ISO 14001, UL, and IEC, held at the Hangzhou operation that runs 8 production bases.

Q8: How do I request a quotation or samples for the 6-EVF-120? Write to sales@chisen.cn or jack@chisen.cn with the required Ah, quantity, destination port, and certification scope.

Expert Summary

The 6-EVF-120 is a 12 V 120 Ah AGM VRLA module published at 407×170×240 mm and 40 ± 0.2 kg, with float 13.5 V, equalise 14.1 V, 24.0 A maximum charge current, 1.75 V/cell cutoff, ≤ 3 % per month self-discharge at 25 °C, −15…50 °C operating range, 350–600 cycle life at 50–80 % depth of discharge, and a 2–5 year design life. One string holds 12 × 120 = 1,440 Wh nominal and 1,152 Wh usable at 80 % depth of discharge, which covers a 50 W head at four hours per night across three nights of autonomy at 200 Wh per night. Sizing should always be closed with published arithmetic rather than with rounded supplier figures, and the controller must respect the 13.5 V / 14.1 V setpoints and the 24.0 A charge ceiling. Within the 6-EVF line, charge current holds at 0.20 C and specific energy between 36.0 and 39.3 Wh/kg, so capacity selection is an autonomy decision, not a chemistry decision. All specifications on this page come from the manufacturer model data or from arithmetic explicitly labelled as such.

Contact CHISEN — 24-Hour Response

  • Email: sales@chisen.cn
  • Direct: jack@chisen.cn